Laserfiche WebLink
F—i <br />m <br />z <br />0 <br />1' , 2'I 2' <br />TE <br />COnst <br />Limits of Cleannq and Grubbinq and Mailbox Relocation <br />Geosynthetic Pavement Interlayer <br />Match <br />xisting <br />Roadway <br />Match <br />0.25 HMA (Type A) <br />Over <br />TYPICAL SECTION <br />*Bright Road (24') : Sta 10+12 to Sta 31+98 <br />*Endow Road (24') : Sta 10+00 to Sta 53+37 <br />*Lockhart Road (23') : Sta 10+12 to Sta 28+43 <br />TE <br />Grade <br />existing <br />ground <br />to <br />place <br />TE 1' min width <br />(Typ) <br />Existing <br />Surface <br />GENERAL NOTES: <br />1. 0.25' HMA Overlay must be placed in two (2) layers of approximately equal 9. The Contractor will be responsible for adequately scheduling inspection and testing <br />thickness with Geosynthetic Pavement Interlayer (Paving Fabric) placed on the of all facilities constructed under this contract with a minimum 24 hour notice <br />existing or prepared surface. to the County. All testing must conform to the Standard Specifications. All <br />2. Placement of HMA Overlay must not begin until the HMA used in Pavement re—testing will be paid by the Contractor. <br />Repair has been in place fora minimum of T$ hours. 10. The Contractor must exercise due caution and carefully preserve survey bench <br />3. Placement of HMA Driveways must not begin until the HMA used for Mainline marks, control points, reference points and all survey stakes, and must bear all <br />Paving has been completed. expenses for replacement and/or errors caused by their unnecessary loss or <br />4. Existing highway and utility facilities must remain in place unless otherwise noted. disturbance. <br />5. Existing trees, shrubs, fences, mailboxes and other frontage improvements must <br />remain in place unless otherwise noted. <br />6. Existing drainage facilities must remain in place unless otherwise noted. The <br />Contractor must conduct earthwork operations so as not to modify or obstruct <br />the existing drainage. <br />7. All Earthwork, except for final shoulder grading, must be completed prior to <br />placing the final layer of HMA Pavement. No Shoulder Backing material must be <br />deposited or drifted on the final layer of HMA surfacing. Where the shoulder <br />placement exceeds 0.50' in thickness, the Shoulder Backing must be placed in <br />two (2) or more fully compacted layers. <br />8. Shoulder Backing material at all intersections radii must receive Penetration <br />Treatment at 0.25 GAL/SQYD. Limits of the Penetration Treatment work must be <br />confined to intersection radii plus fifty feet (50') in each direction or to the <br />intersection conform. <br />COUNTY OF SAN JOA UIN No scALE TYPICAL SECTION AND BRIGHT, <br />Q GENERAL .NOTES. (aright Road <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE <br />incept chi/C'pprW Qh. 7/06/17 G'ppW 266mmer 7/06/17 7- 7 <br />Sheet No. <br />