My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6133 - SP6140
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6055 - SP6717
>
SP6133 - SP6140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 11:55:24 AM
Creation date
8/15/2023 2:45:34 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Collier Road Resurfacing Project
Limits
660' w/o Dustin Road to 1,200' e/o Tully Road
Year
2012
Project Engineer
Hadi Tabatabaee
Roads Worked
Collier Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP6133 - SP6140
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-VrW <br />3 N <br />Z O <br />r <br />00 <br />NC <br />om <br />f� <br />a <br />o <br />z r <br />z <br />D <br />z M <br />h <br />0 <br />m <br />0 <br />0 <br />r <br />Collier <br />-------- --- <br />--------------------------- <br />Collier Road Sta 331+06 = <br />Graham Road Sta 10+00 <br />Exist EP <br />2' <br />------ -------------- — — — — — — — — — — — <br />T <br />F <br />Shoulder <br />Backing <br />CAO <br />+ <br />N <br />�J <br />R/W <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT E <br />F. gorsdoY f o9�2022 <br />NO SCALE <br />NEER DATE <br />01 <br />COLLIER ROAD <br />31 <br />q Const <br />--------- <br />Exist EP <br />Saw cut <br />Const -------------- <br />1 ______-- <br />�- New EP <br />--------------- -- <br />/fl <br />ItI <br />f! I <br />I <br />-------------/--, —r--- i <br />R25' <br />I Stop Sign to <br />I II L-- remain in place <br />V <br />z <br />CONSTRUCTION <br />DETAILS <br />CHECKED DATE <br />COLLIER ROAD RESURFACING Sheet No. <br />(660' w/o Dustin Road to 1,200' e/o Tully Road) 5 of 8 <br />ER <br />I �pp <br />R&D concrete block, sign, MBGR and <br />Sta <br />I r'' <br />posts. Place Slurry Cement Backfill in <br />2 1I 9+63 <br />Post holes. Shall be considered as <br />included in the contract lump sum <br />! <br />I <br />price paid for Clearing and Grubbing. <br />l <br />I <br />I <br />I <br />I <br />F2-] <br />Extend both 71 "x47" CMPs 8 LF <br />I <br />I <br />I <br />per SP D97A <br />l <br />0 <br />Project conform <br />I <br />j <br />I <br />0.50' Pavement Repair (Type I) <br />` I <br />I <br />I <br />I <br />Sacked Concrete Slope Protection <br />I <br />I <br />I <br />I <br />(See Detail Sheet No. 6) <br />CONSTRUCTION <br />DETAILS <br />CHECKED DATE <br />COLLIER ROAD RESURFACING Sheet No. <br />(660' w/o Dustin Road to 1,200' e/o Tully Road) 5 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.