Laserfiche WebLink
1'-4' <br />See <br />Shoulder <br />Details <br />Below <br />CL <br />Const <br />I <br />Limits of Clearing and Grubbing and Mailbox Relocation <br />10'-24' <br />0.25' Asphalt Concrete Overlay <br />— - A - - - - - <br />TYPICAL SECTION <br />Sta 10+20 to Sta 59+45 <br />Ct <br />Const <br />Limits of Clearing and Grubbing <br />I AC <br />Overlay 8 1 ' <br />Earthwork (Misc Areas) <br />� 6' 2' <br />Existing <br />� Var _ $% <br />Surface <br />Conform <br />DETAIL 1 X0.25' Shoulder Backing (Minimum) <br />10' <br />*2' - Station 10+20 to Station 18+75 ( Left ) <br />Station 10+20 to Station 10+70 ( Right ) <br />Station 11+70 to Station 15+00 ( Right ) <br />rt <br />LEFT <br />RIGHT <br />2' — Station <br />BEGIN <br />END <br />DETAIL <br />BEGIN <br />END <br />DETAIL <br />10+20 <br />18+75 <br />2 <br />10+20 <br />10+70 <br />2 <br />18+75 <br />26+37 <br />1 <br />11+70 <br />15+00 <br />2 <br />26+37 <br />31+13 <br />3 <br />15+00 <br />24+00 <br />1 <br />31+13 <br />44+60 <br />1 <br />24+00 <br />59+45 <br />2 <br />44+60 <br />59+45 <br />2 <br />44+75 to Sta 45+55 (Left). Payment for loam should be <br />- <br />= <br />For Station <br />10+70 <br />to 11+70 <br />Ri ht <br />See Sheet <br />rt <br />A <br />Const <br />2' — Station <br />11+70 to Station 15+00 <br />( Right ) <br />f• <br />� Limits of Clearing and <br />Grubbing <br />Existing drainage facilities shall remain in <br />place unless otherwise noted. The Contractor shall conduct earthwork operations so <br />AC ♦4> *4' 1' <br />Overlay <br />Conform at� <br />Lip (Typ) <br />All earthwork, except for final grading of <br />the shoulders, shall be completed prior to placing final layer of Asphalt Concrete. No <br />Shoulder Backing shall be deposited or drifted on the final lift of <br />asphalt concrete surfacing. Where the Shoulder Backing placement exceeds 0.30' in thickness, the Shoulder Backing shall be placed <br />Var �a <br />� <br />Exist CG&S <br />I <br />V�\ v <br />to remian <br />in Two (2) Layers of approximately equal thickness with Pavement Reinforcing Fabric <br />placed on the existing surface. <br />6. <br />_.__:: 14 <br />Penetration Treatment work shall be confined to intersection radii <br />plus fifty feet (50') in each direction. <br />Variable De th <br />ExistingJ <br />Backing at the grass frontages located at Sta 42+15 to Sta 43+40 (Right) and Sta <br />44+75 to Sta 45+55 (Left). Payment for loam should be <br />Shoulder Backing DETAIL2 <br />Surface <br />paid for Shoulder Backing. <br />q_ <br />Const <br />Limits of Clearing and Grubbing <br />i <br />4' 20' <br />Variable Depth AC (Pavement Reinforcing Fabric) <br />o/ <br />01 ` Var � ,Var � <br />DC>(J f/yP2-V <br />—� <br />0 0 <br />0 <br />0 0 <br />Existing Roadway <br />0.25' AC Overlay <br />GENERAL <br />NOTES: <br />'4'- <br />'1. <br />1 . <br />All existing trees, shrubs, fences and other <br />frontage improvements are to remain in place unless otherwise noted-. <br />- <br />2. <br />Existing drainage facilities shall remain in <br />place unless otherwise noted. The Contractor shall conduct earthwork operations so <br />as not to modify or obstruct the existing drainage. <br />3. <br />All earthwork, except for final grading of <br />the shoulders, shall be completed prior to placing final layer of Asphalt Concrete. No <br />Shoulder Backing shall be deposited or drifted on the final lift of <br />asphalt concrete surfacing. Where the Shoulder Backing placement exceeds 0.30' in thickness, the Shoulder Backing shall be placed <br />in two fully compacted layers of approximately equal thickness. <br />4. <br />Placement of AC overlay shall not begin <br />until the Asphalt Concrete used in pavement repair has been in place for 18 hours. <br />5. <br />Asphalt Concrete overlay shall be placed <br />in Two (2) Layers of approximately equal thickness with Pavement Reinforcing Fabric <br />placed on the existing surface. <br />6. <br />Shoulder backing material at all intersection radii shall receive penetration treatment at 0.25 gallon/square yard. Limits of the <br />Penetration Treatment work shall be confined to intersection radii <br />plus fifty feet (50') in each direction. <br />7. <br />Loam shall be used in place of Shoulder <br />Backing at the grass frontages located at Sta 42+15 to Sta 43+40 (Right) and Sta <br />44+75 to Sta 45+55 (Left). Payment for loam should be <br />considered as included in the unit price <br />paid for Shoulder Backing. <br />8• <br />The Contractor is required to enter into <br />an agreement with the CCTC Railroad for work within their R/W. See SECTION 6 RELATIONS WITH THE RAILROAD of the Specifications for further details. <br />COUNTY OF SAN JOAQUIN NO SCALE TYPICAL SECTION AND BEAR CREEK ROAD RESURFACING <br />GENERAL NOTES ( North 99 Frontage Road East to Furry Road ) <br />DRAWN BY DATE PROJECT ENGINEER DATE f CHECKED BY DATE <br />Sheet No. <br />2 of 7 <br />