Laserfiche WebLink
-Conform <br />@ EP B <br />Variable depth Asphalt Concrete <br />8' 7R over existing paved R <br />1 driveways and frontages. <br />Conform B <br />@ 0.04' <br />over exist Existing Width <br />surface. 12' Min <br />TYPE E <br />Const EP <br />1---v^ AC Overlay 8'-- o <br />Driveway :3 <br />Var,~ <br />ar (17 0 <br />max) Exist <br />- surface <br />—�- <br />L —J <br />)— Vor depth 0.04' <br />Existing AC over <br />Roadway exist surface. <br />SECTION B—B <br />TYPICAL DRIVEWAY DETAIL <br />4' Min Existing <br />See Note Below Surface <br />0.50' Asphalt Concrete <br />PAVEMENT REPAIR DETAIL <br />Note: <br />Width (4' Min). Approximate dimensions <br />used for estimating purposes are available <br />upon request. Dimensions and locations are <br />subject to change at the Engineer's discretion. <br />�s ,, <br />ri <br />7 <br />5 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Daniel (X &ambini ?Irl 1.1 <br />PAVEMENT REPAIR <br />Location Quantity <br />44 Locations Throughout Project 905 SQYD <br />Total 905 SQYD <br />PLANING ASPHALT CONCRETE PAVEMENT <br />Location Quantity <br />Mainline: <br />Patterson Pass Road: <br />Sta 10+00 to Sta 10+50 118 SQYD <br />Sta 51 +05 to Sta 51 +55 136 SQYD <br />Total 254 SQYD <br />NO SCALE <br />CHECKED <br />CONSTRUCTION <br />SUMMARY OF <br />DATE <br />EARTHWORK (MISCELLANEOUS AREAS) <br />Location Quantity <br />Patterson Pass Road: <br />Sta 12+00 (Lt) to Sta 17+60 (Lt) 5.6 STA <br />Total 5.6 STA <br />SHOULDER BACKING <br />Location Quantity <br />Patterson Pass Road: <br />Sto 10+00 to Sta 51+55 637 TON <br />Total 637 TON <br />DRIVEWAYS (TYPE E) <br />Location Quantity <br />3 Locations 123 SQYD <br />Total 123 SQYD <br />ASPHALT CONCRETE (TYPE B) <br />Location <br />Quantity <br />Mainline: <br />Sto 11 +00 to Sto 50+55 <br />1,61 1 TON <br />Transition: <br />Sto 10+00 to Sto 11+00 <br />25 TON <br />Sto 50+55 to Sta 51 +55 <br />29 TON <br />Driveways: <br />Type E – 3 Locations <br />14 TON <br />Pavement Repair: <br />44 Locations throughout project <br />302 TON <br />Total 1,981 TON <br />PAVEMENT REINFORCING <br />FABRIC <br />Location <br />Quantity <br />Patterson Pass Road: <br />Sto 11 +00 to Sta 50+55 <br />8,789 SQYD <br />Total 8,789 SQYD <br />DETAILS ANDI PATTERSON PASS ROAD RESURFACING I Sheet No. <br />QUANTITIES (Alameda County Line to 4,155' East of Alameda County Line) 4 of 4 <br />