Laserfiche WebLink
EP <br />�2' - 4' <br />✓ar Dep <br />(Typ) <br />Const <br />Limits of Clearing and Grubbing <br />24'=30' --- <br />20'-22' Pavement I Reinforcing <br />Fabric <br />_--+------ <br />0.04'J RoadwayT TYPICAL SECTION <br />(Typ) Exist Balsam Drive: (Sta 40+00 to Sta 48+25) - 24' 02' <br />(Sta 48+25 to Sta 60+60) - 30' 04' <br />Freesia Avenue: (Sta 154+93 to Sta 162+80) - 30' 04' <br />Const <br />Limits of Clearing and Grubbing <br />EP <br />4' Var Depth X24'-32' <br />(Typ) <br />Conform <br />Vrir <br />See C&G Planing Detail <br />(below right) <br />® Curb, Gutter & Sidewalk <br />in this area (7't). <br />2' <br />32'-40' <br />Pavement) Reinforcing <br />Var <br />Roadway j - - - - - - <br />Fabric <br />• <br />• <br />Overlay <br />Ki <br />Exist TYPICAL SECTION <br />ISS <br /><�>2'-4' 1'-11' <br />Var Depth Var Width <br />(Ty p) <br />GENERAL NOTES: <br />1. 0.17' Asphalt Concrete Overlay shall be placed in one (1) layer with <br />Pavement Reinforcing Fabric placed on the existing or prepared surface. <br />2. Placement of Asphalt Concrete Overlay shall not begin until the <br />Asphalt Concrete used in Pavement Repair and Place Asphalt Concrete <br />(Miscellaneous Areas) has been in place for a minimum of 18 hours. <br />3. Placement of all Asphalt Concrete Driveways shall not begin until <br />the Asphalt Concrete used for Mainline Paving has been in place <br />for a minimum of 18 hours. <br />- - - - �� 4. All earthwork, except for final shoulder grading, shall be completed <br />0.17' prior to placing the final layer of Asphalt Concrete Pavement. <br />AC Overlay <br />EP <br />4' Var Depth <br />(Typ) <br />Conform <br />Cole <br />Drive: <br />(Sta <br />7+08 to <br />Sta 9+80) - 40' <br />Doyle <br />Court: <br />(Sto <br />7+12 to <br />Sta 9+80) - 32' <br />Freesia Avenue: <br />(Sta <br />140+20 <br />to Sta 144+80) - <br />40' <br />® Freesia Avenue: <br />(Sta <br />144+80 <br />to Sta 154+93) - <br />40' <br />Laron <br />Court: <br />(Sta <br />10+20 to <br />Sta 13+80) - 32' <br />Mosher <br />Court: <br />(Sta <br />1 1 1 +54 <br />to Sta 113+ 61 <br />40' <br />Mosher <br />Drive: <br />(Sta <br />90+02 to <br />Sto 111+54) - <br />40' <br />Const <br />Limits of Clearing and Grubbing <br />EP EP <br />-10- 20' <br />-�118' Pavement Reinforcing Fabric �;�1' <br />(Typ) _Var Var i (Typ) <br />L----------- t ------- <br />Roadway <br />Exist TYPICAL SECTION <br />Quashnick Road: (Sto 10+00 to Sta 30+73) <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />t-0.17' <br />AC Overlay <br />5. Existing highway and Utility facllltleS, including roadside signs, trees, <br />Earthwork-' shrubs, fences, bridge railing, mailboxes, sprinklers, etc. shall remain <br />Shoulder Detail in place unless otherwise noted on the plans. <br />See Sheet 4 <br />LC&G (Exist) <br />to remain in place <br />(Typ) <br />2'----- 1' <br />- fExisting <br />Grade <br />:onform <br />Shoulder <br />Backing <br />NO SCALE I TYPICAL SECTIONS AND <br />GENERAL NOTES <br />CHECKED DATE <br />._Ar 9/u/ <br />6. The Contractor shall be responsible for adequately scheduling the <br />inspection and testing of all facilities constructed under this <br />contract. All testing shall conform to the Standard Specifications. <br />All re -testing shall be paid by the Contractor. <br />7. Hand grinding of Asphalt Concrete will be required at locations <br />where existing water valves, maintenance holes, utility vaults and <br />monuments are within the Planing and Pavement Repair limits. <br />8. All Storm Drain Inlets shall be protected from liquid runoff sediments <br />and chemical pollutant in a manner consistent with the requirements <br />of the National Pollution Discharge Elimination System (NPDES), <br />General Construction Permit and per Special Provisions. <br />9. Install Expansion joints at the beginning and end of new Curb, <br />Gutter and Sidewalk. <br />10. All new Curb, Gutter and Sidewalk shall match existing and conform to <br />the existing flowline elevations, with a straight grade between conforms. <br />11. Shoulder Backing Material at all intersection radii shall receive Penetration <br />Treatment at 0.25 gallon/SQYD. Limits of Penetration Treatment work <br />shall be confined to intersection radii plus fifty feet (50') in each <br />direction or to intersection conform. <br />Curb & Gutter (Exist) <br />v to remain in place (Typ) <br />0.08 4 (Typ) Roadway <br />Below lip C&G PLANING DETAIL Exist <br />(Typ) <br />MORADA AREA STREETS RESURFACING I Sheet No - <br />2 of 6 <br />