My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6206 - SP6210
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6055 - SP6717
>
SP6206 - SP6210
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:02:22 PM
Creation date
8/15/2023 3:51:59 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Jahant Road Resurfacing Project
Limits
Elliott Road to Tully Road
Year
2013
Project Engineer
Hadi Tabatabaee
Roads Worked
Jahant Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP6206 - SP6210
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D(A <br />r/ <br />s0 <br />z� <br />01 <br />A <br />Z <br />M <br />m <br />Z <br />0 <br />Conform <br />Existing Ground <br />2' <br />Vor `B <br />GENERAL NOTES: <br />Const <br />ts of Clearing and Grubbing <br />and Mailbox Relocation <br />10' <br />18' Pavement Reinforcing Fabric <br />10' <br />------------------ <br />------------------------------- <br />0.25' AC Overlay- Existing Road Structure <br />TYPICAL SECTION <br />Jahant Road: Sta 5+12 to Sta 122+56 <br />Oorrectlons By <br />No Changes By T*hn blas <br />My Person Using This Drawing Should Verify <br />mien Av inapscting The Site (N won <br />2' <br />Conform <br />Variable Depth <br />Shoulder Backing (Typ) <br />1. Placement of Asphalt Concrete overlay shall not begin until the Asphalt Concrete used in Pavement Repair has been in place <br />for 18 hours. <br />2. The 0.25' Asphalt Concrete shall be placed in two (2) layers of approximately equal thickness with Pavement Reinforcing <br />Fabric placed on existing or prepared surface. <br />3. All earthwork (except for final shoulder grading) shall be completed prior to placing final layer of Asphalt Concrete. No <br />Shoulder Backing material shall be deposited or drifted on the final layer of Asphalt Concrete surfacing. <br />4. Existing drainage facilities shall remain in place unless otherwise noted. The Contractor shall conduct earthwork operations so <br />as not to modify or obstruct the existing drainage. <br />5. All existing trees, shrubs, fences and other frontage improvements are to remain in place unless otherwise noted. <br />6. Shoulder Backing material at all intersection radii shall receive Penetration Treatment at 0.25 gallon/square yard. Limits of <br />the Penetration Treatment work shall be confined to the intersection radii plus fifty feet (50') in each direction or to the <br />intersection conform. <br />7. The Contractor shall be responsible for adequately scheduling inspection and testing of all facilities constructed under this <br />contract. All testing shall conform to the Standard Specifications. All re—testing shall be paid by the Contractor. <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PRC <br />R.. gDYSG{DYf D3/2013 H <br />NO SCALE I TYPICAL SECTION AND <br />GENERAL NOTES <br />ENGINEER DATE CHECKED DATE <br />JAHANT <br />ROAD <br />RESURFACING <br />(Elliott <br />Road <br />to <br />Tully <br />Road) <br />Sheet No. <br />2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.