Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
GENERAL NOTES <br />1. Prior to commencing any work, it shall be the Contractor's responsibility to have <br />each utility company locate in the field their main and service lines. The contractor <br />shall notify the members of the Underground Service Alert (USA) 48 hours in <br />advance of performing excavation work and/or sign relocation work by calling the <br />toll—free number 1-800-227-2600 or 811. <br />2. The Contractor shall field <br />verify all utility locations and <br />depths. Water and <br />gas lines <br />are shown at approximate <br />locations on plans. It shall be <br />the Contractor's <br />sole <br />responsibility to protect all <br />existing utilities, so that no <br />damage results to <br />them <br />during the performance of <br />this contract. The Contractor <br />shall be required <br />to <br />coordinate with other contractors <br />and utility companies <br />installing new structures, <br />utilities, and services. <br />various items of <br />work. <br />3. The Contractor <br />shall exercise due caution and <br />shall carefully preserve bench marks, <br />control points, reference <br />points and all survey <br />stakes, and shall bear all expenses <br />for replacement <br />and/or <br />errors caused by their <br />unnecessary loss or disturbance. <br />4. Existing drainage facilities, water valves, frames and covers, water meters, trees, <br />shrubs, curb, gutter and sidewalk shall remain in place unless otherwise noted on <br />the plans. <br />5. Hand grinding of existing asphalt concrete pavement and concrete shall be required <br />at locations where utility valves, maintenance holes and the lip of gutter at drain <br />inlet locations are within the reconstruction work limits. Payment for hand grinding <br />asphalt concrete shall be considered as included in the Roadway Excavation item of <br />work. Payment for hand grinding concrete shall be considered as included in the <br />Removing Concrete item of work. <br />6. During <br />roadway excavation and curb, gutter and <br />sidewalk repair, Contractor shall <br />place <br />temporary A8 ramps to affectedresidents' <br />driveways at the <br />end of each <br />working <br />day. Similarly, when the roadway AC has <br />not been restored to a grade <br />where <br />residents may access their driveways, Contractor <br />shall place <br />temporary AC <br />ramps <br />at affected residents' driveways at the end <br />of each working <br />day. Payment <br />for these <br />shall be considered as included in the <br />various items of <br />work. <br />7. All irn:provernents within the Minor Concrete (Curb, <br />8. Expansion joints shall <br />Gutter and <br />Sidewalk) work limits <br />shall' be saw cut or <br />removed to <br />the limits shown <br />on the Plans. Payment for this <br />shall be considered <br />as paid for <br />under Minor Concrete (Curb, <br />Gutter and Sidewalk). <br />be placed at locations where new Curb, Gutter and Sidewalk <br />conforms to existing Curb, Gutter and Sidewalk. <br />gI Contractor shall place detectable <br />10. Contractor shady be responsible for timely scheduling of inspection and testing, of all <br />facilities constructed under this contract. All testing shalt conform to the Standard <br />Specifications. All re—testing shall be paid by the Contractor. <br />11. The Contractor shall salvage storm drain inlet frames and grates at the norhtwest <br />corner of Inman Avenue and Princeton Avenue (Sto 10+39 left) and at the <br />northeast corner of Inman Avenue and Princeton Avenue (Sta 10+52 right). The <br />Contractor shall notify San Joaquin County Public Works Road Maintenance Division <br />General Foreman Gordon Briseno at (209) 468-3074 (1810 East Hazelton Avenue, <br />Stockton CA 95205) on how the frames and grates shall be salvaged. <br />warning <br />surface at locations shown on <br />the plans. <br />Payment for this sha l be considered a <br />included in the Minor Concrete <br />(Curb., <br />Gutter and <br />Sidewalk) item of work. Refer <br />to Summary of Quantities for <br />location. <br />10. Contractor shady be responsible for timely scheduling of inspection and testing, of all <br />facilities constructed under this contract. All testing shalt conform to the Standard <br />Specifications. All re—testing shall be paid by the Contractor. <br />11. The Contractor shall salvage storm drain inlet frames and grates at the norhtwest <br />corner of Inman Avenue and Princeton Avenue (Sto 10+39 left) and at the <br />northeast corner of Inman Avenue and Princeton Avenue (Sta 10+52 right). The <br />Contractor shall notify San Joaquin County Public Works Road Maintenance Division <br />General Foreman Gordon Briseno at (209) 468-3074 (1810 East Hazelton Avenue, <br />Stockton CA 95205) on how the frames and grates shall be salvaged. <br />SAN JOAQUIN I NO SCALE � GENERAL NOTES <br />LEGEND <br />Existing <br />Storm Drain Inlet to remain in place unless noted <br />ss% <br />Existing <br />Sanitary Sewer Maintenance Hole to remain in place unless noted <br />Existing <br />Sanitary Sewer Lamphole to be adjusted by Contractor <br />Existing <br />Utility Pole to remain in place <br />4 <br />Existing <br />Fire Hydrant to remain in place <br />H; <br />Existing <br />Water Valve to be adjusted by other <br />Areas of Curb, Gutter and Sidewalk Repair <br />-� <br />R&D Existing <br />Part Circle Culverts <br />Retrofit <br />Curb Ramp Detectable Warning Surface <br />at Existing <br />Curb Ramp per RSP A88A. <br />i WM <br />Existing <br />Water Meter Frame & Cover to remain in place <br />Existing <br />Waterline <br />9 <br />Existing <br />Gasline <br />Existing <br />Tree to remain in place <br />Existing <br />Shrub to remain in place <br />SAN JOAQUIN I NO SCALE � GENERAL NOTES <br />