Laserfiche WebLink
s <br />r� <br />n <br />s <br />m <br />UNDERGROUND UTILITIES: <br />1. THE INFORMATION SHOWN ON THE PLANS IN REGARD TO THE EXISTING AND/OR IMPROVEMENTS WAS DERIVED <br />FROM FIELD INVESTIGATIONS AND/OR RECORD INFORMATION, THE ENGINEER DOES NOT GUARANTEE THESE <br />LOCATIONS TO BE EITHER TRUE OR EXACT, PRIOR TO CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S SOLE <br />RESPONSIBILITY TO VERIFY ALL EXISTING IMPROVEMENTS AND TO EXPOSE ALL EXISTING UNDERGROUND UTILITIES <br />RELATED TO THE PROJECT, INCLUDING BUT NOT LIMITED TO, SEWER, STORM DRAIN, WATER, IRRIGATION, GAS <br />(INCLUDING DISTRIBUTION LINES AND INDIVIDUAL SERVICES), ELECTRICAL, ETC, AND SHALL NOTIFY THE ENGINEER IN <br />WRITING FORTY-EIGHT (48) HOURS IN ADVANCE OF EXPOSING THE UTILITIES, SO THE EXACT LOCATION AND <br />ELEVATION CAN BE VERIFIED AND DOCUMENTED, THE COST ASSOCIATED TO PERFORM THIS WORK SHALL BE <br />INCLUDED IN THE VARIOUS ITEMS OF WORK IF LOCATIONS AND/OR ELEVATION DIFFER FROM THAT SHOWN ON THE <br />DESIGN PLANS, PROVISIONS TO ACCOMMODATE NEW LOCATION/ELEVATION MUST BE MADE PRIOR TO <br />CONSTRUCTION. <br />2. PRIOR TO COMMENCING ANY WORI(, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO HAVE EACH UTILITY <br />COMPANY LOCATE, IN THE FIELD, THEIR MAIN AND SERVICE LINES. THE CONTRACTOR SHALL NOTIFY MEMBERS OF <br />THE UNDERGROUND SERVICES ALERT (U.S.A.) 48 HOURS IN ADVANCE OF PERFORMING ANY EXCAVATION WORK BY <br />CALLING THE TOLL-FREE NUMBER (800) 227-2600. THE CONTRACTOR SHALL RECORD THE U.S.A ORDER NUMBER AND <br />FURNISH ORDER NUMBER TO OWNER AND ENGINEER PRIOR TO ANY EXCAVATION, IT WILL BE THE CONTRACTOR'S <br />SOLE RESPONSIBILITY TO DIRECTLY CONTACT ANY OTHER UTILITY COMPANIES THAT ARE NOT MEMBERS OF THE <br />UNDERGROUND SERVICES ALERT, IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT ALL EXISTING <br />UTILITIES SO THAT NO DAMAGE RESULTS TO THEM DURING THE PERFORMANCE OF THIS CONTRACT. ANY REPAIRS <br />NECESSARY TO DAMAGED UTILITIES SHALL BE PAID FOR BY THE CONTRACTOR, THE CONTRACTOR SHALL BE REQUIRED <br />TO COOPERATE WITH OTHER CONTRACTORS AND UTILITY COMPANIES INSTALLING NEW STRUCTURES, UTILITIES AND <br />SERVICE TO THE PROJECT. <br />3. THE CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SLOPING OR OTHER PROVISIONS NECESSARY TO PROTECT <br />WORKMEN FOR ALL AREAS TO BE EXCAVATED TOA DEPTH OF 6 FEET OR MORE. EXCAVATIONS OF 5 FEET OR MORE <br />IN DEPTH WILL REQUIRE AN EXCAVATIONS PERMIT FROM THE STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL <br />SAFETY. FOR TRENCHES 6 FEET OR MORE IN DEPTH THE CONTRACTOR SHALL COMPLY WITH SECTION 5-1.02A OF THE <br />CALTRANS STANDARDS, SECTION 6705 OF THE STATE OF CALIFORNIA LABOR CODE, AND ANY LOCAL CODES OR <br />ORDINANCES, <br />4. WE CALL YOUR ATTENTION TO TITLE 8 CALIFORNIA ADMINISTRATIVE CODE SECTION 1540 (A) (1) OF THE <br />CONSTRUCTION SAFETY ORDERS ISSUED BY THE OCCUPATIONAL SAFETV AND HEALTH STANDARDS BOARD PURSUANT <br />TO THE CALIFORNIA OCCUPATIONS SAFETY AND HEALTH ACT OF 1973 AS AMENDED WHICH STATES: <br />PRIOR TO OPENING AN EXCAVATION, EFFORT SHALL BE MADE TO DETERMINE WHETHER UNDERGROUND <br />INSTALLATIONS; I.E. SEWER, WATER, FUEL, ELECTRIC LINES, ETC., WILL BE ENCOUNTERED AND IF S0, WHERE SUCH <br />UNDERGROUND INSTALLATIONS ARE LOCATED. WHEN THE EXCAVATION APPROACHES THE APPROXIMATE LOCATION <br />OF SUCH AN INSTALLATION, THE EXACT LOCATION SHALL BE DETERMINED BY CAREFUL PROBING OR HAND DIGGING, <br />AND WHEN IT IS UNCOVERED, ADEQUATE PROTECTION SHALL BE PROVIDED FOR THE EXISTING INSTALLATION. ALL <br />KNOWN OWNERS OF UNDERGROUND FACILITIES IN THE AREA CONCERNED SHALL BE ADVISED OF PROPOSED WORK <br />AT LEAST 48 HOURS PRIOR TO THE START OF ACTUAL EXCAVATION. <br />5. IT SHALL BE <br />THE CONTRACTOR'S RESPONSIBILITY TO INSTALL PIPE OF ADEQUATE CLASSIFICATION WITH SUFFICIENT <br />BEDDING TO MEET ALL REQUIREMENTS OF SAN JOAQUIN COUNTY AND CALTRANS FOR D -LOAD REQUIREMENTS, <br />WHERE NECESSARY, <br />COUNTY OF' SAN JOAQUIN I NO SCALE <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Vincent �2 <br />i/ <br />6, TEMPORARY JUMPER CONNECTION AND BACKFLOW PREVEN7ER SHALL BE INSTALLED BETWEEN EXISTING AND NEW <br />WATERLINES DURING CONSTRUCTION AND MUST BE CERTIFIED BY THE CITY OF STOCKTON, THE TEMPORARY <br />JUMPER CONNECTION SHALL BE USED TO FILL THE NEW WATER AND FOR PROVIDING WATER FOR THE <br />BACTERIOLOGICAL SAMPLING OF THE NEW MAIN AS REQUIRED BYTHE CITY OF STOCKTON, <br />%. TAPPING SLEEVES, PIPE AND FITTINGS SHALL BE DISINFECTED PRIOR TO INSTALLATION IN ACCORDANCE WITH AWWA <br />C651, LATEST EDITION, <br />8. ACTUAL CONNECTIONS TO EXISTING WATER LINES WILL NOT BE PERMITTED PRIOR TO THE COMPLETION OF <br />STERILIZATION AND TESTING OF NEW WATER MAINS, ALL EXISTING WATER VALVES TO BE OPERATED BY THE WATER <br />DIVISION OF THE REGULATORY AGENCY PERSONNEL ONLY, <br />9. <br />WATER LINES SHALL <br />BE A MINIMUM <br />Of 10' HORIZONTALLY <br />FROM SEWER AND STORM MAINS. <br />CROSSINGS SHALL <br />EXISTING WATERLINES DURING <br />MEET STATE HEALTH <br />STANDARDS AND <br />CONFORM TO COUNTY <br />STANDARD DRAWING W-7. <br />OF ASBESTOS MATERIALS NECESSARY AS PART OF <br />10. CERTIFIED BACKFLOW <br />PREVENTERS <br />SHALL <br />BE USED BETWEEN <br />NEW <br />AND <br />EXISTING WATERLINES DURING <br />CONSTRUCTION, <br />WORK ON , CONNECTION <br />TO , <br />AND DISPOSAL <br />OF ASBESTOS MATERIALS NECESSARY AS PART OF <br />THIS WORK. <br />11. ASBESTOS <br />MATERIALS MIGHT BE ENCOUNTERED AS PART OF <br />THIS PROJECT, THE <br />PRICE PROVIDED WITHIN <br />THE <br />CONTRACT <br />DOCUMENT SHALL INCLUDE ALL LABOR AND MATERIALS <br />NECESSARY FOR <br />WORK ON , CONNECTION <br />TO , <br />AND DISPOSAL <br />OF ASBESTOS MATERIALS NECESSARY AS PART OF <br />THIS WORK. <br />SURFACE IMPROVEMENTS <br />L. ALL MANHOLE RIMS, LAMPHOLES, VALVES <br />AND MONUMENT <br />80XES, ETC. <br />SHALL BE AD1USl'ED TO FINISH <br />GRADE <br />AFTER STREET PAVING, UNLESS OTHERWISE <br />NOTED. COST FOR <br />THIS WORK <br />SHALL BE INCLUDfD IN THE UNIT <br />PRICES <br />FOR SAID FACILITIES. <br />UNDERGROUND UTILITIES AND <br />SURFACE IMPROVEMENTS NOTES <br />CHECKED DATE <br />�A��®A AVENUE INTERCONNECTI®N I Sheet No. <br />(Balboa Avenue: EI Camino Avenue to X00° north of EI Camino Avenue) 3 of 6 <br />