Laserfiche WebLink
0 <br />C� <br />W <br />NKg <br />V <br />0 <br />CD <br />0 <br />CY <br />N <br />d <br />N <br />0 <br />N <br />n <br />r) 0 <br />N <br />qqN <br />N <br />O <br />N <br />r�10 <br />N <br />CD <br />N <br />CD <br />ILL. <br />16) THE CONTRACTOR AGREES THAT: <br />A. THEY SHALL BE RESPONSIBLE TO CLEAN THE JOB SITE AT THE END OF EACH PHASE OF WORK. <br />B. THEY SHALL BE RESPONSIBLE TO REMOVE AND DISPOSE OF ALL TRASH, SCRAP AND UNUSED <br />MATERIAL AT THEIR OWN EXPENSE IN A TIMELY MANNER. <br />C. THEY SHALL BE RESPONSIBLE TO MAINTAIN THE SITE IN A NEAT, SAFE AND ORDERLY MANNER <br />AT ALL TIMES. <br />D. THEY SHALL BE RESPONSIBLE TO KEEP MATERIALS, EQUIPMENT, AND TRASH OUT OF THE WAY <br />OF OTHER CONTRACTORS SO AS NOT TO DELAY THE JOB. FAILURE TO DO SO WILL RESULT IN <br />A DEDUCTION FOR THE COST OF CLEAN UP FROM THE FINAL PAYMENT. <br />E. THEY SHALL BE RESPONSIBLE FOR THEIR OWN SAFETY TRAFFIC CONTROL PERMITS <br />RETESTING AND REINSPECTIONS AT THEIR OWN EXPENSE. <br />F. UNLESS OTHERWISE NOTED ALL EXCESS SOILS AND MATERIALS SHALL BECOME THE <br />PROPERTY OF THE CONTRACTOR AND SHALL BE LAWFULLY DISPOSED OF OFF SITE AT THE <br />CONTRACTOR'S EXPENSE. <br />17) THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOBSITE <br />CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY <br />OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY <br />AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL <br />DEFEND, INDEMNIFY AND HOLD THE OWNER AND ENGINEER HARMLESS FROM ANY AND ALL <br />LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS <br />PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER <br />OR THE ENGINEER. <br />18) DUST CONTROL SHALL BE PROVIDED AT ALL TIMES, AT THE CONTRACTOR'S EXPENSE, TO <br />MINIMIZE ANY DUST NUISANCE AND SHALL BE IN ACCORDANCE WITH SECTION 10 OF <br />CALTRANS STANDARD SPECIFICATIONS AND THE REQUIREMENTS OF SAN JOAQUIN COUNTY. <br />19) CONSTRUCTION STAKING FOR GRADING, CURB, GUTTER, SIDEWALK, SANITARY SEWER, STORM <br />DRAIN, WATER, AND ELECTROLIERS SHALL BE DONE BY OWENS DESIGN CONSULTANTS. THE <br />CONTRACTOR SHALL NOTIFY THE ENGINEER FORTY-EIGHT (48) HOURS IN ADVANCE OF THE <br />NEED FOR STAKING. ANY STAKING REQUESTED BY THE CONTRACTOR OR THEIR <br />SUBCONTRACTORS THAT IS ABOVE AND BEYOND STANDARD STAKING NEEDS, WILL BE <br />SUBJECT TO AN EXTRA WORK BACK CHARGE TO THE CONTRACTOR. <br />20) FOR ALL WORK WITHIN PUBLIC RIGHTS -OF -WAYS OR EASEMENTS, THE CONTRACTOR SHALL <br />PRESERVE THE INTEGRITY AND LOCATION OF ANY AND ALL PUBLIC UTILITIES AND PROVIDE <br />THE NECESSARY CONSTRUCTION TRAFFIC CONTROL. CONTRACTOR SHALL, THROUGH THE <br />ENCROACHMENT PERMIT PROCESS, VERIFY WITH THE NECESSARY REGULATORY AGENCIES, <br />THE NEED FOR ANY TRAFFIC ROUTING PLAN. IF PLAN IS REQUIRED, CONTRACTOR SHALL <br />PROVIDE PLAN AND RECEIVE PROPER APPROVALS PRIOR TO BEGINNING CONSTRUCTION. <br />21) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY SCHEDULING INSPECTION AND <br />TESTING OF ALL FACILITIES CONSTRUCTED UNDER THIS CONTRACT. ALL TESTING SHALL <br />CONFORM TO THE REGULATORY AGENCY S STANDARD SPECIFICATIONS. ALL TESTING AND <br />INSPECTION SHALL BE PAID FOR BY THE OWNER; ALL RE -TESTING AND/OR RE -INSPECTION <br />SHALL BE PAID FOR BY THE CONTRACTOR. <br />22) IF EXISTING IMPROVEMENTS NEED TO BE DISTURBED AND/OR REMOVED FOR THE PROPER <br />PLACEMENT OF IMPROVEMENTS TO BE CONSTRUCTED BY THESE PLANS, THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR PROTECTING EXISTING IMPROVEMENTS FROM DAMAGE. COST <br />OF REPLACING OR REPAIRING EXISTING IMPROVEMENTS SHALL BE INCLUDED IN THE UNIT <br />PRICE BID FOR ITEMS REQUIRING REMOVAL AND/OR REPLACEMENT OF EXISTING <br />IMPROVEMENTS. THERE WILL BE NO EXTRA COST DUE THE CONTRACTOR FOR REPLACING OR <br />REPAIRING EXISTING IMPROVEMENTS. <br />23) WHENEVER EXISTING FACILITIES ARE REMOVED, DAMAGED, BROKEN, OR CUT IN THE <br />INSTALLATION OF THE WORK COVERED BY THESE PLANS OR SPECIFICATIONS, SAID FACILITIES <br />SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE, AFTER PROPER BACKFILLING AND/OR <br />CONSTRUCTION, WITH MATERIALS EQUAL TO OR BETTER THAN THE MATERIALS USED IN THE <br />ORIGINAL EXISTING FACILITIES. THE FINISHED PRODUCT SHALL BE SUBJECT TO THE <br />APPROVAL OF THE OWNER, THE ENGINEER, AND THE RESPECTIVE REGULATORY AGENCY. <br />24) THE CONTRACTOR SHALL MAINTAIN A NEATLY MARKED SET OF FULL-SIZE AS -BUILT RECORD <br />DRAWINGS SHOWING THE FINAL LOCATION AND LAYOUT OF ALL MECHANICAL; ELECTRICAL <br />AND INSTRUMENTATION EQUIPMENT; PIPING AND CONDUITS; STRUCTURES AND OTHER <br />FACILITIES. THE AS-BUILTS OF THE ELECTRICAL SYSTEM SHALL INCLUDE THE STREET LIGHT <br />LAYOUT PLAN SHOWING LOCATION OF LIGHTS, CONDUITS, CONDUCTORS, POINTS OF <br />CONNECTIONS TO SERVICES, PULLBOXES, AND WIRE SIZES. AS -BUILT RECORD DRAWINGS <br />SHALL REFLECT CHANGE ORDERS, ACCOMMODATIONS, AND ADJUSTMENTS TO ALL <br />IMPROVEMENTS CONSTRUCTED. WHERE NECESSARY, SUPPLEMENTAL DRAWINGS SHALL BE <br />PREPARED AND SUBMITTED BY THE CONTRACTOR. PRIOR TO ACCEPTANCE OF THE PROJECT, <br />THE CONTRACTOR SHALL DELIVER TO THE ENGINEER, ONE SET OF NEATLY MARKED AS -BUILT <br />RECORD DRAWINGS SHOWING THE INFORMATION REQUIRED ABOVE. AS -BUILT RECORD <br />DRAWINGS SHALL BE REVIEWED AND THE COMPLETE AS -BUILT RECORD DRAWING SET SHALL <br />BE CURRENT WITH ALL CHANGES AND DEVIATIONS REDLINED AS A PRECONDITION TO THE <br />FINAL PROGRESS PAYMENT APPROVAL AND/OR FINAL ACCEPTANCE. <br />25) DRIVEWAYS ON STREETS ARE TO BE LOCATED IN THE FIELD BY THE ENGINEER AT THE TIME <br />OF CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE ENGINEER, IN WRITING, FORTY-EIGHT <br />(48) HOURS IN ADVANCE OF THE NEED FOR DRIVEWAY LOCATIONS. DRIVEWAYS SHALL NOT <br />COINCIDE WITH WHEELCHAIR RAMPS. <br />26) WORK IN EASEMENT AND/OR RIGHTS-OF-WAY IS SUBJECT TO THE APPROVAL AND <br />ACCEPTANCE OF THE REGULATORY AGENCY RESPONSIBLE FOR OPERATION AND/OR <br />MAINTENANCE OF SAID EASEMENT AND/OR RIGHTS-OF-WAY. <br />UNDERGROUND UTILITIES <br />1) THE INFORMATION SHOWN ON THE PLANS WITH REGARD TO THE EXISTING UTILITIES AND/OR <br />IMPROVEMENTS WAS DERIVED FROM FIELD INVESTIGATIONS AND/OR RECORD INFORMATION. THE <br />ENGINEER DOES NOT GUARANTEE THESE LOCATIONS TO BE EITHER TRUE OR EXACT. PRIOR TO <br />CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO VERIFY ALL EXISTING <br />IMPROVEMENTS AND TO EXPOSE ALL EXISTING UNDERGROUND UTILITIES RELATED TO THE PROJECT, <br />INCLUDING BUT NOT LIMITED TO, SEWER, STORM DRAIN, WATER, IRRIGATION, GAS, ELECTRICAL, ETC. <br />AND SHALL NOTIFY THE ENGINEER IN WRITING FORTY-EIGHT (48) HOURS IN ADVANCE OF EXPOSING <br />THE UTILITIES SO THAT THE EXACT LOCATION AND ELEVATION CAN BE VERIFIED AND DOCUMENTED. <br />THE COST ASSOCIATED TO PERFORM THIS WORK SHALL BE INCLUDED IN EITHER THE LUMP SUM <br />CLEARING COST OR IN THE VARIOUS ITEMS OF WORK. IF LOCATION AND/OR ELEVATION DIFFERS <br />FROM THAT SHOWN ON THE DESIGN PLANS, PROVISIONS TO ACCOMMODATE NEW <br />LOCATION/ELEVATION MUST BE MADE PRIOR TO CONSTRUCTION. <br />2 PRIOR TO COMMENCING ANY WORK IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO HAVE <br />EACH UTILITY COMPANY LOCATE, IN THE FIELD, THEIR MAIN AND SERVICE LINES. THE CONTRACTOR <br />SHALL NOTIFY MEMBERS OF THE UNDERGROUND SERVICE ALERT (U.S.A.) 48 HOURS IN ADVANCE OF <br />PERFORMING ANY EXCAVATION WORK BY CALLING THE TOLL-FREE NUMBER 811. THE CONTRACTOR <br />SHALL RECORD THE U.S.A. ORDER NUMBER AND FURNISH ORDER NUMBER TO OWNER AND <br />ENGINEER PRIOR TO ANY EXCAVATION. IT WILL BE THE CONTRACTORS SOLE RESPONSIBILITY TO <br />DIRECTLY CONTACT ANY OTHER UTILITY COMPANIES THAT ARE NOT MEMBERS OF UNDERGROUND <br />SERVICE ALERT. IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT ALL EXISTING <br />UTILITIES SO THAT NO DAMAGE RESULTS TO THEM DURING THE PERFORMANCE OF THIS CONTRACT. <br />ANY REPAIRS NECESSARY TO DAMAGED UTILITIES SHALL BE PAID FOR BY THE CONTRACTOR. THE <br />CONTRACTOR SHALL BE REQUIRED TO COOPERATE WITH OTHER CONTRACTORS AND UTILITY <br />COMPANIES INSTALLING NEW STRUCTURES, UTILITIES AND SERVICE TO THE PROJECT. <br />3) THE CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SLOPING OR OTHER PROVISIONS <br />NECESSARY TO PROTECT WORKERS FOR ALL AREAS TO BE EXCAVATED TO A DEPTH OF 4' OR MORE. <br />EXCAVATIONS OF 4 FEET OR MORE IN DEPTH WILL REQUIRE AN EXCAVATIONS PERMIT FROM THE <br />STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL SAFETY. FOR TRENCHES 4 FEET OR MORE IN <br />DEPTH, THE CONTRACTOR SHALL COMPLY WITH SECTION 5-1.02A OF THE CALTRANS STANDARDS, <br />SECTION 6705 OF THE STATE OF CALIFORNIA LABOR CODE, AND ANY LOCAL CODES OR ORDINANCES. <br />4) WE CALL YOUR ATTENTION TO TITLE 8 CALIFORNIA ADMINISTRATION CODE SECTION 1540 (A) (1) OF <br />THE CONSTRUCTION SAFETY ORDERS ISSUED BY THE OCCUPATIONAL SAFETY AND HEALTH <br />STANDARDS BOARD PURSUANT TO THE CALIFORNIA OCCUPATIONS SAFETY AND HEALTH ACT OF 1973 <br />AS AMENDED WHICH STATES: (1) PRIOR TO OPENING AN EXCAVATION, EFFORT SHALL BE MADE TO <br />DETERMINE WHETHER UNDERGROUND INSTALLATIONS; I.E. SEWER, WATER, FUEL, ELECTRIC LINES, <br />ETC., WILL BE ENCOUNTERED AND IF SO, WHERE SUCH UNDERGROUND INSTALLATIONS ARE <br />LOCATED. WHEN THE EXCAVATION APPROACHES THE APPROXIMATE LOCATION OF SUCH AN <br />INSTALLATION, THE EXACT LOCATION SHALL BE DETERMINED BY CAREFUL PROBING OR HAND <br />DIGGING; AND WHEN IT IS UNCOVERED ADEQUATE PROTECTION SHALL BE PROVIDED FOR THE <br />EXISTING INSTALLATION. ALL KNOWN OWNERS OF UNDERGROUND FACILITIES IN THE AREA <br />CONCERNED SHALL BE ADVISED OF PROPOSED WORK AT LEAST 48 HOURS PRIOR TO THE START OF <br />ACTUAL EXCAVATION. <br />5) CONTRACTOR SHALL USE RUBBER GASKET JOINTS ON ALL PRECAST PIPES. THE COST FOR RUBBER <br />GASKET JOINTS SHALL BE INCLUDED IN THE UNIT PRICE OF PIPE. <br />6) IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INSTALL PIPE OF ADEQUATE CLASSIFICATION <br />WITH SUFFICIENT BEDDING TO MEET ALL REQUIREMENTS AND RECOMMENDATIONS OF SAN JOAQUIN <br />COUNTY FOR D -LOAD REQUIREMENTS. <br />ASBU/LT DRAW/NG <br />BY. DA TE: <br />3) <br />IT IS INTENDED THAT THESE PLANS AND SPECIFICATIONS REQUIRE ALL LABOR AND MATERIALS <br />V <br />Lf) tb <br />NECESSARY AND PROPER FOR THE WORK CONTEMPLATED AND THAT THE WORK BE COMPLETED <br />THE CONTRACTOR SHALL CAREFULLY READ ALL OF THE NOTES AND SPECIFICATIONS, THE <br />IN ACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. THE CONTRACTOR SHALL NOTIFY THE <br />CONTRACTOR SHALL BE SATISFIED AS TO THE TRUE MEANING AND INTENTION AND SHALL BE <br />FZ) <br />z� <br />ENGINEER IMMEDIATELY REGARDING ANY DISCREPANCIES OR AMBIGUITIES WHICH MAY EXIST IN <br />RESPONSIBLE FOR COMPLYING WITH EACH. <br />THE PLANS OR SPECIFICATIONS. THE ENGINEER'S INTERPRETATION THEREOF SHALL BE <br />vnz" <br />Z= <br />CONCLUSIVE. <br />GENERAL NOTES: <br />4) <br />WHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF THE WORK IN GENERAL TERMS <br />P <br />Z <br />BUT NOT IN COMPLETE DETAIL, IT IS UNDERSTOOD THAT ONLY THE BEST GENERAL PRACTICE IS <br />1 ALL IMPROVEMENTS SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE <br />CIVIL 0NI <br />FOP <br />TO PREVAIL AND THAT ONLY MATERIALS AND WORKMANSHIP OF THE FIRST QUALITY ARE TO BE <br />FOLLOWING: SAN JOAQUIN COUNTY, DEPARTMENT OF PUBLIC WORKS STANDARD SPECIFICATIONS <br />NEW <br />USED. <br />AND THE CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS CALTRANS <br />5 <br />THE CONTRACTOR SHALL BE SKILLED AND REGULARLY ENGAGED IN THE GENERAL CLASS AND <br />LATEST EDITION WHERE APPLICABLE. ALL WORK SHALL BE UNDER THE INSPECTION OF THE <br />29384 EAST <br />TYPE OF WORK CALLED FOR IN THE PROJECT PLANS AND SPECIFICATIONS. THEREFORE, THE <br />SAN JOAQUIN COUNTY <br />Revisions: <br />OWNER IS RELYING UPON THE EXPERIENCE AND EXPERTISE OF THE CONTRACTOR, IT SHALL BE <br />) <br />EXPECTED THAT PRICES PROVIDED WITHIN THE CONTRACT DOCUMENTS SHALL INCLUDE ALL <br />3 <br />LABOR AND MATERIALS NECESSARY AND PROPER FOR THE WORK CONTEMPLATED AND THAT THE <br />2) PRIOR TO ANY WORK BEING PERFORMED, THE CONTRACTOR SHALL CONTACT THE <br />WORK BE COMPLETED IN ACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. THE <br />APPROPRIATE REGULATORY AGENCY FOR A PRE -CONSTRUCTION CONFERENCE. <br />6 <br />CONTRACTOR SHALL BE COMPETENT, KNOWLEDGEABLE AND HAVE SPECIAL SKILLS ON THE <br />CONTRACTOR SHALL ALSO NOTIFY THE BELOW LISTED PROJECT CONTACTS (48) HOURS IN <br />NATURE EXTENT AND INHERENT CONDITIONS OF THE WORK TO BE PERFORMED. CONTRACTOR <br />ADVANCE OF SAID MEETING: FIELD ENGINEERING DVISION <br />9 <br />SHALL ALSO ACKNOWLEDGE THAT THERE ARE CERTAIN PECULIAR AND INHERENT CONDITIONS <br />Title: <br />NOTES <br />EXISTENT IN THE CONSTRUCTION OF THE PARTICULAR FACILITIES, WHICH MAY CREATE, DURING <br />(209) 953-7421 <br />Drawn By: T.J.O. <br />THE CONSTRUCTION PROGRAM, UNUSUAL OR PECULIAR UNSAFE CONDITIONS HAZARDOUS TO <br />Scale: AS NOTED <br />Job No. 2022042 <br />PERSONS, PROPERTY AND THE ENVIRONMENT. CONTRACTOR SHALL BE AWARE OF SUCH <br />CAD File Name: <br />2022042 Dutra IPs.dwg <br />PECULIAR RISKS AND HAVE THE SKILL AND EXPERIENCE TO FORESEE AND TO ADOPT PROTECTIVE <br />A. REGULATORY AGENCY: SAN JOAQUIN COUNTY PUBLIC WORKS <br />MEASURES TO ADEQUATELY AND SAFELY PERFORM THE CONSTRUCTION WORK WITH RESPECT <br />1810 HAZELTON AVENUE, STOCKTON, CA 95205 <br />TO SUCH HAZARDS. <br />(209) 468-3380 <br />6) <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITS AND LICENSES REQUIRED FOR THE <br />FIELD ENGINEERING DVISION <br />CONSTRUCTION AND COMPLETION OF THE PROJECT, AND SHALL PERFORM ALL WORK IN <br />(209) 953-7421 <br />ACCORDANCE WITH THE REQUIREMENTS AND CONDITIONS OF ALL PERMITS AND APPROVALS <br />APPLICABLE TO THIS PROJECT. THE CONTRACTOR SHALL ENSURE THAT THE NECESSARY <br />B. OWNER: JILL AND JOE DUTRA <br />RIGHTS-OF-WAY, EASEMENTS, AND/OR PERMITS ARE SECURED PRIOR TO CONSTRUCTION. <br />29601 GROOMS ROAD OAKDALE, CA 95361 <br />7) <br />CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT BEFORE STARTING ANY WORK FROM <br />(209) 480-4706 <br />SAN JOAQUNIN COUNTY. CONTRACTOR SHALL NOTIFY CITY, COUNTY, AND/OR STATE 48 HOURS IN <br />ADVANCE OF COMMENCING THE WORK OR AS REQUIRED BY SAID PERMIT. <br />8) <br />THE CONTRACTOR SHALL, AT THE TIME OF BIDDING, AND, THROUGHOUT THE PERIOD OF THE <br />C. ENGINEER: OWENS DESIGN CONSULTANTS <br />CONTRACT, BE LICENSED IN THE STATE OF CALIFORNIA UNDER THE PROVISIONS OF CHAPTER 9, <br />145 N 2ND AVE STE #5 OAKDALE, CA 95361 <br />DIVISION 3 OF THE BUSINESS AND PROFESSIONS CODE AND SHALL BE BONDABLE FOR AN <br />(209) 522-8031 <br />AMOUNT EQUAL TO OR GREATER THAN THE AMOUNT BID AND TO DO THE TYPE OF WORK <br />THOMAS J. OWENS, PE, PLS <br />CONTEMPLATED IN THE PLANS AND SPECIFICATIONS. CONTRACTOR SHALL BE SKILLED AND <br />REGULARLY ENGAGED IN THE GENERAL CLASS AND TYPE OF WORK CALLED FOR IN THE PLANS <br />AND SPECIFICATIONS. <br />9) <br />CONTRACTOR SHALL INSPECT THE SITE OF THE WORK PRIOR TO BIDDING TO SATISFY <br />D. ELECTRIC: PACIFIC GAS AND ELECTRIC <br />THEMSELVES BY PERSONAL EXAMINATION OR BY SUCH OTHER MEANS AS THEY MAY PREFER, OF <br />SERVICE PLANNING/YOSEMITE DISTRICT <br />THE LOCATION OF THE PROPOSED WORK, AND OF THE ACTUAL CONDITIONS OF AND AT THE SITE <br />(209) 355-3861 <br />OF WORK. IF, DURING THE COURSE OF THEIR EXAMINATION, A BIDDER FINDS FACTS OR <br />SARAH.CUMMINGS@PGE.COM <br />CONDITIONS WHICH APPEAR TO THEM TO BE IN CONFLICT WITH THE LETTER OR SPIRIT OF THE <br />ATTN.: SARAH CUMMINGS <br />PROJECT PLANS AND SPECIFICATIONS, THEY SHALL CONTACT THE ENGINEER FOR ADDITIONAL <br />M <br />INFORMATION AND EXPLANATION BEFORE SUBMITTING THEIR BID. SUBMISSION OF A BID BY THE <br />GAS PROPANE BY LOT OWNER <br />CONTRACTOR SHALL CONSTITUTE ACKNOWLEDGEMENT THAT, IF AWARDED THE CONTRACT, THEY <br />HAVE RELIED AND ARE RELYING ON THEIR OWN EXAMINATION OF (1) THE SITE OF THE WORK, (2) <br />TELEPHONE: BY OTHERS <br />ACCESS TO THE SITE, AND (3) ALL OTHER DATA AND MATTERS REQUISITE TO THE FULFILLMENT OF <br />THE WORK AND ON THEIR OWN KNOWLEDGE OF EXISTING FACILITIES ON AND IN THE VICINITY OF <br />�. SEWER AND WATER: <br />THE SITE OF THE WORK TO BE CONSTRUCTED UNDER THIS CONTRACT. THE INFORMATION <br />+' <br />PROVIDED BY THE OWNER OR THE ENGINEER IS NOT INTENDED TO BE A SUBSTITUTE FOR, OR A <br />PERMITTING: SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPT. <br />SAN JOAQUINC <br />SUPPLEMENT TO THE INDEPENDENT VERIFICATION BY THE CONTRACTOR TO THE EXTENT SUCH <br />}fir <br />HA AVENUE, STOCKMEN, CA 95205 <br />INDEPENDENT INVESTIGATION OF SITE CONDITIONS IS DEEMED NECESSARY OR DESIRABLE BY <br />(209) 468-3438 <br />THE CONTRACTOR. CONTRACTOR SHALL ACKNOWLEDGE THAT THEY HAVE NOT RELIED SOLELY <br />SEWER: ONSITE SEPTIC TANK AND LEACH FIELD <br />UPON OWNER OR ENGINEER FURNISHED INFORMATION REGARDING SITE CONDITIONS IN <br />WATER: ONSITE PRIVATE WELL <br />PREPARING AND SUBMITTING THEIR BID. <br />=3 <br />10) <br />DRAWING NUMBERS SHOWN ON THE PLANS REFER TO DRAWINGS CONTAINED IN THE SAN <br />U <br />JOAQUIN COUNTY, DEPARTMENT OF PUBLIC WORKS STANDARD SPECIFICATIONS. <br />O <br />11) <br />ALL STATIONS REFER TO DISTANCES ALONG STREET CENTERLINE, UNLESS OTHERWISE NOTED. <br />Q <br />ALL STATIONS OFF CENTERLINE ARE PERPENDICULAR TO OR RADIALLY OPPOSITE CENTERLINE <br />STATIONS. <br />12) <br />THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, BARRICADES, SIGNS, FLAGGERS OR OTHER <br />DEVICES NECESSARY FOR PUBLIC SAFETY. <br />13) <br />THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL WATER, POWER, SANITARY <br />C: <br />FACILITIES AND TELEPHONE SERVICES AS REQUIRED FOR THE CONTRACTORS USE DURING <br />QJ <br />CONSTRUCTION. <br />(D <br />14) <br />THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES MADE WITHOUT PRIOR <br />WRITTEN AUTHORIZATION FROM THE OWNER AND/OR ENGINEER. <br />15) <br />THE CONTRACTOR SHALL EXERCISE DUE CAUTION AND SHALL CAREFULLY PRESERVE BENCH <br />ILL <br />MARKS, CONTROL POINTS, REFERENCE POINTS AND ALL SURVEY STAKES, AND SHALL BEAR ALL <br />EXPENSES FOR REPLACEMENT AND/OR ERRORS CAUSED BY THEIR UNNECESSARY LOSS OR <br />DISTURBANCE. <br />a <br />0 <br />a <br />I <br />a <br />ON <br />O <br />ON <br />N <br />T_ <br />r) 0 <br />N <br />qqN <br />N <br />O <br />N <br />r�10 <br />N <br />CD <br />N <br />CD <br />ILL. <br />16) THE CONTRACTOR AGREES THAT: <br />A. THEY SHALL BE RESPONSIBLE TO CLEAN THE JOB SITE AT THE END OF EACH PHASE OF WORK. <br />B. THEY SHALL BE RESPONSIBLE TO REMOVE AND DISPOSE OF ALL TRASH, SCRAP AND UNUSED <br />MATERIAL AT THEIR OWN EXPENSE IN A TIMELY MANNER. <br />C. THEY SHALL BE RESPONSIBLE TO MAINTAIN THE SITE IN A NEAT, SAFE AND ORDERLY MANNER <br />AT ALL TIMES. <br />D. THEY SHALL BE RESPONSIBLE TO KEEP MATERIALS, EQUIPMENT, AND TRASH OUT OF THE WAY <br />OF OTHER CONTRACTORS SO AS NOT TO DELAY THE JOB. FAILURE TO DO SO WILL RESULT IN <br />A DEDUCTION FOR THE COST OF CLEAN UP FROM THE FINAL PAYMENT. <br />E. THEY SHALL BE RESPONSIBLE FOR THEIR OWN SAFETY TRAFFIC CONTROL PERMITS <br />RETESTING AND REINSPECTIONS AT THEIR OWN EXPENSE. <br />F. UNLESS OTHERWISE NOTED ALL EXCESS SOILS AND MATERIALS SHALL BECOME THE <br />PROPERTY OF THE CONTRACTOR AND SHALL BE LAWFULLY DISPOSED OF OFF SITE AT THE <br />CONTRACTOR'S EXPENSE. <br />17) THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOBSITE <br />CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY <br />OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY <br />AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL <br />DEFEND, INDEMNIFY AND HOLD THE OWNER AND ENGINEER HARMLESS FROM ANY AND ALL <br />LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS <br />PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER <br />OR THE ENGINEER. <br />18) DUST CONTROL SHALL BE PROVIDED AT ALL TIMES, AT THE CONTRACTOR'S EXPENSE, TO <br />MINIMIZE ANY DUST NUISANCE AND SHALL BE IN ACCORDANCE WITH SECTION 10 OF <br />CALTRANS STANDARD SPECIFICATIONS AND THE REQUIREMENTS OF SAN JOAQUIN COUNTY. <br />19) CONSTRUCTION STAKING FOR GRADING, CURB, GUTTER, SIDEWALK, SANITARY SEWER, STORM <br />DRAIN, WATER, AND ELECTROLIERS SHALL BE DONE BY OWENS DESIGN CONSULTANTS. THE <br />CONTRACTOR SHALL NOTIFY THE ENGINEER FORTY-EIGHT (48) HOURS IN ADVANCE OF THE <br />NEED FOR STAKING. ANY STAKING REQUESTED BY THE CONTRACTOR OR THEIR <br />SUBCONTRACTORS THAT IS ABOVE AND BEYOND STANDARD STAKING NEEDS, WILL BE <br />SUBJECT TO AN EXTRA WORK BACK CHARGE TO THE CONTRACTOR. <br />20) FOR ALL WORK WITHIN PUBLIC RIGHTS -OF -WAYS OR EASEMENTS, THE CONTRACTOR SHALL <br />PRESERVE THE INTEGRITY AND LOCATION OF ANY AND ALL PUBLIC UTILITIES AND PROVIDE <br />THE NECESSARY CONSTRUCTION TRAFFIC CONTROL. CONTRACTOR SHALL, THROUGH THE <br />ENCROACHMENT PERMIT PROCESS, VERIFY WITH THE NECESSARY REGULATORY AGENCIES, <br />THE NEED FOR ANY TRAFFIC ROUTING PLAN. IF PLAN IS REQUIRED, CONTRACTOR SHALL <br />PROVIDE PLAN AND RECEIVE PROPER APPROVALS PRIOR TO BEGINNING CONSTRUCTION. <br />21) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY SCHEDULING INSPECTION AND <br />TESTING OF ALL FACILITIES CONSTRUCTED UNDER THIS CONTRACT. ALL TESTING SHALL <br />CONFORM TO THE REGULATORY AGENCY S STANDARD SPECIFICATIONS. ALL TESTING AND <br />INSPECTION SHALL BE PAID FOR BY THE OWNER; ALL RE -TESTING AND/OR RE -INSPECTION <br />SHALL BE PAID FOR BY THE CONTRACTOR. <br />22) IF EXISTING IMPROVEMENTS NEED TO BE DISTURBED AND/OR REMOVED FOR THE PROPER <br />PLACEMENT OF IMPROVEMENTS TO BE CONSTRUCTED BY THESE PLANS, THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR PROTECTING EXISTING IMPROVEMENTS FROM DAMAGE. COST <br />OF REPLACING OR REPAIRING EXISTING IMPROVEMENTS SHALL BE INCLUDED IN THE UNIT <br />PRICE BID FOR ITEMS REQUIRING REMOVAL AND/OR REPLACEMENT OF EXISTING <br />IMPROVEMENTS. THERE WILL BE NO EXTRA COST DUE THE CONTRACTOR FOR REPLACING OR <br />REPAIRING EXISTING IMPROVEMENTS. <br />23) WHENEVER EXISTING FACILITIES ARE REMOVED, DAMAGED, BROKEN, OR CUT IN THE <br />INSTALLATION OF THE WORK COVERED BY THESE PLANS OR SPECIFICATIONS, SAID FACILITIES <br />SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE, AFTER PROPER BACKFILLING AND/OR <br />CONSTRUCTION, WITH MATERIALS EQUAL TO OR BETTER THAN THE MATERIALS USED IN THE <br />ORIGINAL EXISTING FACILITIES. THE FINISHED PRODUCT SHALL BE SUBJECT TO THE <br />APPROVAL OF THE OWNER, THE ENGINEER, AND THE RESPECTIVE REGULATORY AGENCY. <br />24) THE CONTRACTOR SHALL MAINTAIN A NEATLY MARKED SET OF FULL-SIZE AS -BUILT RECORD <br />DRAWINGS SHOWING THE FINAL LOCATION AND LAYOUT OF ALL MECHANICAL; ELECTRICAL <br />AND INSTRUMENTATION EQUIPMENT; PIPING AND CONDUITS; STRUCTURES AND OTHER <br />FACILITIES. THE AS-BUILTS OF THE ELECTRICAL SYSTEM SHALL INCLUDE THE STREET LIGHT <br />LAYOUT PLAN SHOWING LOCATION OF LIGHTS, CONDUITS, CONDUCTORS, POINTS OF <br />CONNECTIONS TO SERVICES, PULLBOXES, AND WIRE SIZES. AS -BUILT RECORD DRAWINGS <br />SHALL REFLECT CHANGE ORDERS, ACCOMMODATIONS, AND ADJUSTMENTS TO ALL <br />IMPROVEMENTS CONSTRUCTED. WHERE NECESSARY, SUPPLEMENTAL DRAWINGS SHALL BE <br />PREPARED AND SUBMITTED BY THE CONTRACTOR. PRIOR TO ACCEPTANCE OF THE PROJECT, <br />THE CONTRACTOR SHALL DELIVER TO THE ENGINEER, ONE SET OF NEATLY MARKED AS -BUILT <br />RECORD DRAWINGS SHOWING THE INFORMATION REQUIRED ABOVE. AS -BUILT RECORD <br />DRAWINGS SHALL BE REVIEWED AND THE COMPLETE AS -BUILT RECORD DRAWING SET SHALL <br />BE CURRENT WITH ALL CHANGES AND DEVIATIONS REDLINED AS A PRECONDITION TO THE <br />FINAL PROGRESS PAYMENT APPROVAL AND/OR FINAL ACCEPTANCE. <br />25) DRIVEWAYS ON STREETS ARE TO BE LOCATED IN THE FIELD BY THE ENGINEER AT THE TIME <br />OF CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE ENGINEER, IN WRITING, FORTY-EIGHT <br />(48) HOURS IN ADVANCE OF THE NEED FOR DRIVEWAY LOCATIONS. DRIVEWAYS SHALL NOT <br />COINCIDE WITH WHEELCHAIR RAMPS. <br />26) WORK IN EASEMENT AND/OR RIGHTS-OF-WAY IS SUBJECT TO THE APPROVAL AND <br />ACCEPTANCE OF THE REGULATORY AGENCY RESPONSIBLE FOR OPERATION AND/OR <br />MAINTENANCE OF SAID EASEMENT AND/OR RIGHTS-OF-WAY. <br />UNDERGROUND UTILITIES <br />1) THE INFORMATION SHOWN ON THE PLANS WITH REGARD TO THE EXISTING UTILITIES AND/OR <br />IMPROVEMENTS WAS DERIVED FROM FIELD INVESTIGATIONS AND/OR RECORD INFORMATION. THE <br />ENGINEER DOES NOT GUARANTEE THESE LOCATIONS TO BE EITHER TRUE OR EXACT. PRIOR TO <br />CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO VERIFY ALL EXISTING <br />IMPROVEMENTS AND TO EXPOSE ALL EXISTING UNDERGROUND UTILITIES RELATED TO THE PROJECT, <br />INCLUDING BUT NOT LIMITED TO, SEWER, STORM DRAIN, WATER, IRRIGATION, GAS, ELECTRICAL, ETC. <br />AND SHALL NOTIFY THE ENGINEER IN WRITING FORTY-EIGHT (48) HOURS IN ADVANCE OF EXPOSING <br />THE UTILITIES SO THAT THE EXACT LOCATION AND ELEVATION CAN BE VERIFIED AND DOCUMENTED. <br />THE COST ASSOCIATED TO PERFORM THIS WORK SHALL BE INCLUDED IN EITHER THE LUMP SUM <br />CLEARING COST OR IN THE VARIOUS ITEMS OF WORK. IF LOCATION AND/OR ELEVATION DIFFERS <br />FROM THAT SHOWN ON THE DESIGN PLANS, PROVISIONS TO ACCOMMODATE NEW <br />LOCATION/ELEVATION MUST BE MADE PRIOR TO CONSTRUCTION. <br />2 PRIOR TO COMMENCING ANY WORK IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO HAVE <br />EACH UTILITY COMPANY LOCATE, IN THE FIELD, THEIR MAIN AND SERVICE LINES. THE CONTRACTOR <br />SHALL NOTIFY MEMBERS OF THE UNDERGROUND SERVICE ALERT (U.S.A.) 48 HOURS IN ADVANCE OF <br />PERFORMING ANY EXCAVATION WORK BY CALLING THE TOLL-FREE NUMBER 811. THE CONTRACTOR <br />SHALL RECORD THE U.S.A. ORDER NUMBER AND FURNISH ORDER NUMBER TO OWNER AND <br />ENGINEER PRIOR TO ANY EXCAVATION. IT WILL BE THE CONTRACTORS SOLE RESPONSIBILITY TO <br />DIRECTLY CONTACT ANY OTHER UTILITY COMPANIES THAT ARE NOT MEMBERS OF UNDERGROUND <br />SERVICE ALERT. IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT ALL EXISTING <br />UTILITIES SO THAT NO DAMAGE RESULTS TO THEM DURING THE PERFORMANCE OF THIS CONTRACT. <br />ANY REPAIRS NECESSARY TO DAMAGED UTILITIES SHALL BE PAID FOR BY THE CONTRACTOR. THE <br />CONTRACTOR SHALL BE REQUIRED TO COOPERATE WITH OTHER CONTRACTORS AND UTILITY <br />COMPANIES INSTALLING NEW STRUCTURES, UTILITIES AND SERVICE TO THE PROJECT. <br />3) THE CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SLOPING OR OTHER PROVISIONS <br />NECESSARY TO PROTECT WORKERS FOR ALL AREAS TO BE EXCAVATED TO A DEPTH OF 4' OR MORE. <br />EXCAVATIONS OF 4 FEET OR MORE IN DEPTH WILL REQUIRE AN EXCAVATIONS PERMIT FROM THE <br />STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL SAFETY. FOR TRENCHES 4 FEET OR MORE IN <br />DEPTH, THE CONTRACTOR SHALL COMPLY WITH SECTION 5-1.02A OF THE CALTRANS STANDARDS, <br />SECTION 6705 OF THE STATE OF CALIFORNIA LABOR CODE, AND ANY LOCAL CODES OR ORDINANCES. <br />4) WE CALL YOUR ATTENTION TO TITLE 8 CALIFORNIA ADMINISTRATION CODE SECTION 1540 (A) (1) OF <br />THE CONSTRUCTION SAFETY ORDERS ISSUED BY THE OCCUPATIONAL SAFETY AND HEALTH <br />STANDARDS BOARD PURSUANT TO THE CALIFORNIA OCCUPATIONS SAFETY AND HEALTH ACT OF 1973 <br />AS AMENDED WHICH STATES: (1) PRIOR TO OPENING AN EXCAVATION, EFFORT SHALL BE MADE TO <br />DETERMINE WHETHER UNDERGROUND INSTALLATIONS; I.E. SEWER, WATER, FUEL, ELECTRIC LINES, <br />ETC., WILL BE ENCOUNTERED AND IF SO, WHERE SUCH UNDERGROUND INSTALLATIONS ARE <br />LOCATED. WHEN THE EXCAVATION APPROACHES THE APPROXIMATE LOCATION OF SUCH AN <br />INSTALLATION, THE EXACT LOCATION SHALL BE DETERMINED BY CAREFUL PROBING OR HAND <br />DIGGING; AND WHEN IT IS UNCOVERED ADEQUATE PROTECTION SHALL BE PROVIDED FOR THE <br />EXISTING INSTALLATION. ALL KNOWN OWNERS OF UNDERGROUND FACILITIES IN THE AREA <br />CONCERNED SHALL BE ADVISED OF PROPOSED WORK AT LEAST 48 HOURS PRIOR TO THE START OF <br />ACTUAL EXCAVATION. <br />5) CONTRACTOR SHALL USE RUBBER GASKET JOINTS ON ALL PRECAST PIPES. THE COST FOR RUBBER <br />GASKET JOINTS SHALL BE INCLUDED IN THE UNIT PRICE OF PIPE. <br />6) IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INSTALL PIPE OF ADEQUATE CLASSIFICATION <br />WITH SUFFICIENT BEDDING TO MEET ALL REQUIREMENTS AND RECOMMENDATIONS OF SAN JOAQUIN <br />COUNTY FOR D -LOAD REQUIREMENTS. <br />ASBU/LT DRAW/NG <br />BY. DA TE: <br />V <br />Lf) tb <br />O <br />1C00011 i1----�i <br />i <br />V W1--� <br />FZ) <br />z� <br />I� <br />V Ce) Lo <br />Lp <br />vM l, CD <br />vnz" <br />Z= <br />ON l� O ...i <br />O <br />PROFESS/O�q` <br />P <br />Z <br />No. 53530 <br />�9T <br />CIVIL 0NI <br />FOP <br />CAQ <br />EXP. 6/30/23 <br />NEW <br />SUBDIVISION <br />IMPROVEMENTS <br />FOR: <br />JOE <br />DUTRA <br />29384 EAST <br />LONE TREE RD. <br />ESCALON, CA <br />Revisions: <br />Date <br />) <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />A <br />9 <br />Title: <br />NOTES <br />AND <br />SPECS. <br />Drawn By: T.J.O. <br />Checked By: TJo <br />Scale: AS NOTED <br />Job No. 2022042 <br />Date: July 26, 2023 <br />CAD File Name: <br />2022042 Dutra IPs.dwg <br />Sheet No. <br />C2.0 <br />