0
<br />C�
<br />W
<br />NKg
<br />V
<br />0
<br />CD
<br />0
<br />CY
<br />N
<br />d
<br />N
<br />0
<br />N
<br />n
<br />r) 0
<br />N
<br />qqN
<br />N
<br />O
<br />N
<br />r�10
<br />N
<br />CD
<br />N
<br />CD
<br />ILL.
<br />16) THE CONTRACTOR AGREES THAT:
<br />A. THEY SHALL BE RESPONSIBLE TO CLEAN THE JOB SITE AT THE END OF EACH PHASE OF WORK.
<br />B. THEY SHALL BE RESPONSIBLE TO REMOVE AND DISPOSE OF ALL TRASH, SCRAP AND UNUSED
<br />MATERIAL AT THEIR OWN EXPENSE IN A TIMELY MANNER.
<br />C. THEY SHALL BE RESPONSIBLE TO MAINTAIN THE SITE IN A NEAT, SAFE AND ORDERLY MANNER
<br />AT ALL TIMES.
<br />D. THEY SHALL BE RESPONSIBLE TO KEEP MATERIALS, EQUIPMENT, AND TRASH OUT OF THE WAY
<br />OF OTHER CONTRACTORS SO AS NOT TO DELAY THE JOB. FAILURE TO DO SO WILL RESULT IN
<br />A DEDUCTION FOR THE COST OF CLEAN UP FROM THE FINAL PAYMENT.
<br />E. THEY SHALL BE RESPONSIBLE FOR THEIR OWN SAFETY TRAFFIC CONTROL PERMITS
<br />RETESTING AND REINSPECTIONS AT THEIR OWN EXPENSE.
<br />F. UNLESS OTHERWISE NOTED ALL EXCESS SOILS AND MATERIALS SHALL BECOME THE
<br />PROPERTY OF THE CONTRACTOR AND SHALL BE LAWFULLY DISPOSED OF OFF SITE AT THE
<br />CONTRACTOR'S EXPENSE.
<br />17) THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOBSITE
<br />CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY
<br />OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY
<br />AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL
<br />DEFEND, INDEMNIFY AND HOLD THE OWNER AND ENGINEER HARMLESS FROM ANY AND ALL
<br />LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS
<br />PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER
<br />OR THE ENGINEER.
<br />18) DUST CONTROL SHALL BE PROVIDED AT ALL TIMES, AT THE CONTRACTOR'S EXPENSE, TO
<br />MINIMIZE ANY DUST NUISANCE AND SHALL BE IN ACCORDANCE WITH SECTION 10 OF
<br />CALTRANS STANDARD SPECIFICATIONS AND THE REQUIREMENTS OF SAN JOAQUIN COUNTY.
<br />19) CONSTRUCTION STAKING FOR GRADING, CURB, GUTTER, SIDEWALK, SANITARY SEWER, STORM
<br />DRAIN, WATER, AND ELECTROLIERS SHALL BE DONE BY OWENS DESIGN CONSULTANTS. THE
<br />CONTRACTOR SHALL NOTIFY THE ENGINEER FORTY-EIGHT (48) HOURS IN ADVANCE OF THE
<br />NEED FOR STAKING. ANY STAKING REQUESTED BY THE CONTRACTOR OR THEIR
<br />SUBCONTRACTORS THAT IS ABOVE AND BEYOND STANDARD STAKING NEEDS, WILL BE
<br />SUBJECT TO AN EXTRA WORK BACK CHARGE TO THE CONTRACTOR.
<br />20) FOR ALL WORK WITHIN PUBLIC RIGHTS -OF -WAYS OR EASEMENTS, THE CONTRACTOR SHALL
<br />PRESERVE THE INTEGRITY AND LOCATION OF ANY AND ALL PUBLIC UTILITIES AND PROVIDE
<br />THE NECESSARY CONSTRUCTION TRAFFIC CONTROL. CONTRACTOR SHALL, THROUGH THE
<br />ENCROACHMENT PERMIT PROCESS, VERIFY WITH THE NECESSARY REGULATORY AGENCIES,
<br />THE NEED FOR ANY TRAFFIC ROUTING PLAN. IF PLAN IS REQUIRED, CONTRACTOR SHALL
<br />PROVIDE PLAN AND RECEIVE PROPER APPROVALS PRIOR TO BEGINNING CONSTRUCTION.
<br />21) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY SCHEDULING INSPECTION AND
<br />TESTING OF ALL FACILITIES CONSTRUCTED UNDER THIS CONTRACT. ALL TESTING SHALL
<br />CONFORM TO THE REGULATORY AGENCY S STANDARD SPECIFICATIONS. ALL TESTING AND
<br />INSPECTION SHALL BE PAID FOR BY THE OWNER; ALL RE -TESTING AND/OR RE -INSPECTION
<br />SHALL BE PAID FOR BY THE CONTRACTOR.
<br />22) IF EXISTING IMPROVEMENTS NEED TO BE DISTURBED AND/OR REMOVED FOR THE PROPER
<br />PLACEMENT OF IMPROVEMENTS TO BE CONSTRUCTED BY THESE PLANS, THE CONTRACTOR
<br />SHALL BE RESPONSIBLE FOR PROTECTING EXISTING IMPROVEMENTS FROM DAMAGE. COST
<br />OF REPLACING OR REPAIRING EXISTING IMPROVEMENTS SHALL BE INCLUDED IN THE UNIT
<br />PRICE BID FOR ITEMS REQUIRING REMOVAL AND/OR REPLACEMENT OF EXISTING
<br />IMPROVEMENTS. THERE WILL BE NO EXTRA COST DUE THE CONTRACTOR FOR REPLACING OR
<br />REPAIRING EXISTING IMPROVEMENTS.
<br />23) WHENEVER EXISTING FACILITIES ARE REMOVED, DAMAGED, BROKEN, OR CUT IN THE
<br />INSTALLATION OF THE WORK COVERED BY THESE PLANS OR SPECIFICATIONS, SAID FACILITIES
<br />SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE, AFTER PROPER BACKFILLING AND/OR
<br />CONSTRUCTION, WITH MATERIALS EQUAL TO OR BETTER THAN THE MATERIALS USED IN THE
<br />ORIGINAL EXISTING FACILITIES. THE FINISHED PRODUCT SHALL BE SUBJECT TO THE
<br />APPROVAL OF THE OWNER, THE ENGINEER, AND THE RESPECTIVE REGULATORY AGENCY.
<br />24) THE CONTRACTOR SHALL MAINTAIN A NEATLY MARKED SET OF FULL-SIZE AS -BUILT RECORD
<br />DRAWINGS SHOWING THE FINAL LOCATION AND LAYOUT OF ALL MECHANICAL; ELECTRICAL
<br />AND INSTRUMENTATION EQUIPMENT; PIPING AND CONDUITS; STRUCTURES AND OTHER
<br />FACILITIES. THE AS-BUILTS OF THE ELECTRICAL SYSTEM SHALL INCLUDE THE STREET LIGHT
<br />LAYOUT PLAN SHOWING LOCATION OF LIGHTS, CONDUITS, CONDUCTORS, POINTS OF
<br />CONNECTIONS TO SERVICES, PULLBOXES, AND WIRE SIZES. AS -BUILT RECORD DRAWINGS
<br />SHALL REFLECT CHANGE ORDERS, ACCOMMODATIONS, AND ADJUSTMENTS TO ALL
<br />IMPROVEMENTS CONSTRUCTED. WHERE NECESSARY, SUPPLEMENTAL DRAWINGS SHALL BE
<br />PREPARED AND SUBMITTED BY THE CONTRACTOR. PRIOR TO ACCEPTANCE OF THE PROJECT,
<br />THE CONTRACTOR SHALL DELIVER TO THE ENGINEER, ONE SET OF NEATLY MARKED AS -BUILT
<br />RECORD DRAWINGS SHOWING THE INFORMATION REQUIRED ABOVE. AS -BUILT RECORD
<br />DRAWINGS SHALL BE REVIEWED AND THE COMPLETE AS -BUILT RECORD DRAWING SET SHALL
<br />BE CURRENT WITH ALL CHANGES AND DEVIATIONS REDLINED AS A PRECONDITION TO THE
<br />FINAL PROGRESS PAYMENT APPROVAL AND/OR FINAL ACCEPTANCE.
<br />25) DRIVEWAYS ON STREETS ARE TO BE LOCATED IN THE FIELD BY THE ENGINEER AT THE TIME
<br />OF CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE ENGINEER, IN WRITING, FORTY-EIGHT
<br />(48) HOURS IN ADVANCE OF THE NEED FOR DRIVEWAY LOCATIONS. DRIVEWAYS SHALL NOT
<br />COINCIDE WITH WHEELCHAIR RAMPS.
<br />26) WORK IN EASEMENT AND/OR RIGHTS-OF-WAY IS SUBJECT TO THE APPROVAL AND
<br />ACCEPTANCE OF THE REGULATORY AGENCY RESPONSIBLE FOR OPERATION AND/OR
<br />MAINTENANCE OF SAID EASEMENT AND/OR RIGHTS-OF-WAY.
<br />UNDERGROUND UTILITIES
<br />1) THE INFORMATION SHOWN ON THE PLANS WITH REGARD TO THE EXISTING UTILITIES AND/OR
<br />IMPROVEMENTS WAS DERIVED FROM FIELD INVESTIGATIONS AND/OR RECORD INFORMATION. THE
<br />ENGINEER DOES NOT GUARANTEE THESE LOCATIONS TO BE EITHER TRUE OR EXACT. PRIOR TO
<br />CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO VERIFY ALL EXISTING
<br />IMPROVEMENTS AND TO EXPOSE ALL EXISTING UNDERGROUND UTILITIES RELATED TO THE PROJECT,
<br />INCLUDING BUT NOT LIMITED TO, SEWER, STORM DRAIN, WATER, IRRIGATION, GAS, ELECTRICAL, ETC.
<br />AND SHALL NOTIFY THE ENGINEER IN WRITING FORTY-EIGHT (48) HOURS IN ADVANCE OF EXPOSING
<br />THE UTILITIES SO THAT THE EXACT LOCATION AND ELEVATION CAN BE VERIFIED AND DOCUMENTED.
<br />THE COST ASSOCIATED TO PERFORM THIS WORK SHALL BE INCLUDED IN EITHER THE LUMP SUM
<br />CLEARING COST OR IN THE VARIOUS ITEMS OF WORK. IF LOCATION AND/OR ELEVATION DIFFERS
<br />FROM THAT SHOWN ON THE DESIGN PLANS, PROVISIONS TO ACCOMMODATE NEW
<br />LOCATION/ELEVATION MUST BE MADE PRIOR TO CONSTRUCTION.
<br />2 PRIOR TO COMMENCING ANY WORK IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO HAVE
<br />EACH UTILITY COMPANY LOCATE, IN THE FIELD, THEIR MAIN AND SERVICE LINES. THE CONTRACTOR
<br />SHALL NOTIFY MEMBERS OF THE UNDERGROUND SERVICE ALERT (U.S.A.) 48 HOURS IN ADVANCE OF
<br />PERFORMING ANY EXCAVATION WORK BY CALLING THE TOLL-FREE NUMBER 811. THE CONTRACTOR
<br />SHALL RECORD THE U.S.A. ORDER NUMBER AND FURNISH ORDER NUMBER TO OWNER AND
<br />ENGINEER PRIOR TO ANY EXCAVATION. IT WILL BE THE CONTRACTORS SOLE RESPONSIBILITY TO
<br />DIRECTLY CONTACT ANY OTHER UTILITY COMPANIES THAT ARE NOT MEMBERS OF UNDERGROUND
<br />SERVICE ALERT. IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT ALL EXISTING
<br />UTILITIES SO THAT NO DAMAGE RESULTS TO THEM DURING THE PERFORMANCE OF THIS CONTRACT.
<br />ANY REPAIRS NECESSARY TO DAMAGED UTILITIES SHALL BE PAID FOR BY THE CONTRACTOR. THE
<br />CONTRACTOR SHALL BE REQUIRED TO COOPERATE WITH OTHER CONTRACTORS AND UTILITY
<br />COMPANIES INSTALLING NEW STRUCTURES, UTILITIES AND SERVICE TO THE PROJECT.
<br />3) THE CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SLOPING OR OTHER PROVISIONS
<br />NECESSARY TO PROTECT WORKERS FOR ALL AREAS TO BE EXCAVATED TO A DEPTH OF 4' OR MORE.
<br />EXCAVATIONS OF 4 FEET OR MORE IN DEPTH WILL REQUIRE AN EXCAVATIONS PERMIT FROM THE
<br />STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL SAFETY. FOR TRENCHES 4 FEET OR MORE IN
<br />DEPTH, THE CONTRACTOR SHALL COMPLY WITH SECTION 5-1.02A OF THE CALTRANS STANDARDS,
<br />SECTION 6705 OF THE STATE OF CALIFORNIA LABOR CODE, AND ANY LOCAL CODES OR ORDINANCES.
<br />4) WE CALL YOUR ATTENTION TO TITLE 8 CALIFORNIA ADMINISTRATION CODE SECTION 1540 (A) (1) OF
<br />THE CONSTRUCTION SAFETY ORDERS ISSUED BY THE OCCUPATIONAL SAFETY AND HEALTH
<br />STANDARDS BOARD PURSUANT TO THE CALIFORNIA OCCUPATIONS SAFETY AND HEALTH ACT OF 1973
<br />AS AMENDED WHICH STATES: (1) PRIOR TO OPENING AN EXCAVATION, EFFORT SHALL BE MADE TO
<br />DETERMINE WHETHER UNDERGROUND INSTALLATIONS; I.E. SEWER, WATER, FUEL, ELECTRIC LINES,
<br />ETC., WILL BE ENCOUNTERED AND IF SO, WHERE SUCH UNDERGROUND INSTALLATIONS ARE
<br />LOCATED. WHEN THE EXCAVATION APPROACHES THE APPROXIMATE LOCATION OF SUCH AN
<br />INSTALLATION, THE EXACT LOCATION SHALL BE DETERMINED BY CAREFUL PROBING OR HAND
<br />DIGGING; AND WHEN IT IS UNCOVERED ADEQUATE PROTECTION SHALL BE PROVIDED FOR THE
<br />EXISTING INSTALLATION. ALL KNOWN OWNERS OF UNDERGROUND FACILITIES IN THE AREA
<br />CONCERNED SHALL BE ADVISED OF PROPOSED WORK AT LEAST 48 HOURS PRIOR TO THE START OF
<br />ACTUAL EXCAVATION.
<br />5) CONTRACTOR SHALL USE RUBBER GASKET JOINTS ON ALL PRECAST PIPES. THE COST FOR RUBBER
<br />GASKET JOINTS SHALL BE INCLUDED IN THE UNIT PRICE OF PIPE.
<br />6) IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INSTALL PIPE OF ADEQUATE CLASSIFICATION
<br />WITH SUFFICIENT BEDDING TO MEET ALL REQUIREMENTS AND RECOMMENDATIONS OF SAN JOAQUIN
<br />COUNTY FOR D -LOAD REQUIREMENTS.
<br />ASBU/LT DRAW/NG
<br />BY. DA TE:
<br />3)
<br />IT IS INTENDED THAT THESE PLANS AND SPECIFICATIONS REQUIRE ALL LABOR AND MATERIALS
<br />V
<br />Lf) tb
<br />NECESSARY AND PROPER FOR THE WORK CONTEMPLATED AND THAT THE WORK BE COMPLETED
<br />THE CONTRACTOR SHALL CAREFULLY READ ALL OF THE NOTES AND SPECIFICATIONS, THE
<br />IN ACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. THE CONTRACTOR SHALL NOTIFY THE
<br />CONTRACTOR SHALL BE SATISFIED AS TO THE TRUE MEANING AND INTENTION AND SHALL BE
<br />FZ)
<br />z�
<br />ENGINEER IMMEDIATELY REGARDING ANY DISCREPANCIES OR AMBIGUITIES WHICH MAY EXIST IN
<br />RESPONSIBLE FOR COMPLYING WITH EACH.
<br />THE PLANS OR SPECIFICATIONS. THE ENGINEER'S INTERPRETATION THEREOF SHALL BE
<br />vnz"
<br />Z=
<br />CONCLUSIVE.
<br />GENERAL NOTES:
<br />4)
<br />WHERE THE PLANS OR SPECIFICATIONS DESCRIBE PORTIONS OF THE WORK IN GENERAL TERMS
<br />P
<br />Z
<br />BUT NOT IN COMPLETE DETAIL, IT IS UNDERSTOOD THAT ONLY THE BEST GENERAL PRACTICE IS
<br />1 ALL IMPROVEMENTS SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE
<br />CIVIL 0NI
<br />FOP
<br />TO PREVAIL AND THAT ONLY MATERIALS AND WORKMANSHIP OF THE FIRST QUALITY ARE TO BE
<br />FOLLOWING: SAN JOAQUIN COUNTY, DEPARTMENT OF PUBLIC WORKS STANDARD SPECIFICATIONS
<br />NEW
<br />USED.
<br />AND THE CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS CALTRANS
<br />5
<br />THE CONTRACTOR SHALL BE SKILLED AND REGULARLY ENGAGED IN THE GENERAL CLASS AND
<br />LATEST EDITION WHERE APPLICABLE. ALL WORK SHALL BE UNDER THE INSPECTION OF THE
<br />29384 EAST
<br />TYPE OF WORK CALLED FOR IN THE PROJECT PLANS AND SPECIFICATIONS. THEREFORE, THE
<br />SAN JOAQUIN COUNTY
<br />Revisions:
<br />OWNER IS RELYING UPON THE EXPERIENCE AND EXPERTISE OF THE CONTRACTOR, IT SHALL BE
<br />)
<br />EXPECTED THAT PRICES PROVIDED WITHIN THE CONTRACT DOCUMENTS SHALL INCLUDE ALL
<br />3
<br />LABOR AND MATERIALS NECESSARY AND PROPER FOR THE WORK CONTEMPLATED AND THAT THE
<br />2) PRIOR TO ANY WORK BEING PERFORMED, THE CONTRACTOR SHALL CONTACT THE
<br />WORK BE COMPLETED IN ACCORDANCE WITH THEIR TRUE INTENT AND PURPOSE. THE
<br />APPROPRIATE REGULATORY AGENCY FOR A PRE -CONSTRUCTION CONFERENCE.
<br />6
<br />CONTRACTOR SHALL BE COMPETENT, KNOWLEDGEABLE AND HAVE SPECIAL SKILLS ON THE
<br />CONTRACTOR SHALL ALSO NOTIFY THE BELOW LISTED PROJECT CONTACTS (48) HOURS IN
<br />NATURE EXTENT AND INHERENT CONDITIONS OF THE WORK TO BE PERFORMED. CONTRACTOR
<br />ADVANCE OF SAID MEETING: FIELD ENGINEERING DVISION
<br />9
<br />SHALL ALSO ACKNOWLEDGE THAT THERE ARE CERTAIN PECULIAR AND INHERENT CONDITIONS
<br />Title:
<br />NOTES
<br />EXISTENT IN THE CONSTRUCTION OF THE PARTICULAR FACILITIES, WHICH MAY CREATE, DURING
<br />(209) 953-7421
<br />Drawn By: T.J.O.
<br />THE CONSTRUCTION PROGRAM, UNUSUAL OR PECULIAR UNSAFE CONDITIONS HAZARDOUS TO
<br />Scale: AS NOTED
<br />Job No. 2022042
<br />PERSONS, PROPERTY AND THE ENVIRONMENT. CONTRACTOR SHALL BE AWARE OF SUCH
<br />CAD File Name:
<br />2022042 Dutra IPs.dwg
<br />PECULIAR RISKS AND HAVE THE SKILL AND EXPERIENCE TO FORESEE AND TO ADOPT PROTECTIVE
<br />A. REGULATORY AGENCY: SAN JOAQUIN COUNTY PUBLIC WORKS
<br />MEASURES TO ADEQUATELY AND SAFELY PERFORM THE CONSTRUCTION WORK WITH RESPECT
<br />1810 HAZELTON AVENUE, STOCKTON, CA 95205
<br />TO SUCH HAZARDS.
<br />(209) 468-3380
<br />6)
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITS AND LICENSES REQUIRED FOR THE
<br />FIELD ENGINEERING DVISION
<br />CONSTRUCTION AND COMPLETION OF THE PROJECT, AND SHALL PERFORM ALL WORK IN
<br />(209) 953-7421
<br />ACCORDANCE WITH THE REQUIREMENTS AND CONDITIONS OF ALL PERMITS AND APPROVALS
<br />APPLICABLE TO THIS PROJECT. THE CONTRACTOR SHALL ENSURE THAT THE NECESSARY
<br />B. OWNER: JILL AND JOE DUTRA
<br />RIGHTS-OF-WAY, EASEMENTS, AND/OR PERMITS ARE SECURED PRIOR TO CONSTRUCTION.
<br />29601 GROOMS ROAD OAKDALE, CA 95361
<br />7)
<br />CONTRACTOR SHALL OBTAIN AN ENCROACHMENT PERMIT BEFORE STARTING ANY WORK FROM
<br />(209) 480-4706
<br />SAN JOAQUNIN COUNTY. CONTRACTOR SHALL NOTIFY CITY, COUNTY, AND/OR STATE 48 HOURS IN
<br />ADVANCE OF COMMENCING THE WORK OR AS REQUIRED BY SAID PERMIT.
<br />8)
<br />THE CONTRACTOR SHALL, AT THE TIME OF BIDDING, AND, THROUGHOUT THE PERIOD OF THE
<br />C. ENGINEER: OWENS DESIGN CONSULTANTS
<br />CONTRACT, BE LICENSED IN THE STATE OF CALIFORNIA UNDER THE PROVISIONS OF CHAPTER 9,
<br />145 N 2ND AVE STE #5 OAKDALE, CA 95361
<br />DIVISION 3 OF THE BUSINESS AND PROFESSIONS CODE AND SHALL BE BONDABLE FOR AN
<br />(209) 522-8031
<br />AMOUNT EQUAL TO OR GREATER THAN THE AMOUNT BID AND TO DO THE TYPE OF WORK
<br />THOMAS J. OWENS, PE, PLS
<br />CONTEMPLATED IN THE PLANS AND SPECIFICATIONS. CONTRACTOR SHALL BE SKILLED AND
<br />REGULARLY ENGAGED IN THE GENERAL CLASS AND TYPE OF WORK CALLED FOR IN THE PLANS
<br />AND SPECIFICATIONS.
<br />9)
<br />CONTRACTOR SHALL INSPECT THE SITE OF THE WORK PRIOR TO BIDDING TO SATISFY
<br />D. ELECTRIC: PACIFIC GAS AND ELECTRIC
<br />THEMSELVES BY PERSONAL EXAMINATION OR BY SUCH OTHER MEANS AS THEY MAY PREFER, OF
<br />SERVICE PLANNING/YOSEMITE DISTRICT
<br />THE LOCATION OF THE PROPOSED WORK, AND OF THE ACTUAL CONDITIONS OF AND AT THE SITE
<br />(209) 355-3861
<br />OF WORK. IF, DURING THE COURSE OF THEIR EXAMINATION, A BIDDER FINDS FACTS OR
<br />SARAH.CUMMINGS@PGE.COM
<br />CONDITIONS WHICH APPEAR TO THEM TO BE IN CONFLICT WITH THE LETTER OR SPIRIT OF THE
<br />ATTN.: SARAH CUMMINGS
<br />PROJECT PLANS AND SPECIFICATIONS, THEY SHALL CONTACT THE ENGINEER FOR ADDITIONAL
<br />M
<br />INFORMATION AND EXPLANATION BEFORE SUBMITTING THEIR BID. SUBMISSION OF A BID BY THE
<br />GAS PROPANE BY LOT OWNER
<br />CONTRACTOR SHALL CONSTITUTE ACKNOWLEDGEMENT THAT, IF AWARDED THE CONTRACT, THEY
<br />HAVE RELIED AND ARE RELYING ON THEIR OWN EXAMINATION OF (1) THE SITE OF THE WORK, (2)
<br />TELEPHONE: BY OTHERS
<br />ACCESS TO THE SITE, AND (3) ALL OTHER DATA AND MATTERS REQUISITE TO THE FULFILLMENT OF
<br />THE WORK AND ON THEIR OWN KNOWLEDGE OF EXISTING FACILITIES ON AND IN THE VICINITY OF
<br />�. SEWER AND WATER:
<br />THE SITE OF THE WORK TO BE CONSTRUCTED UNDER THIS CONTRACT. THE INFORMATION
<br />+'
<br />PROVIDED BY THE OWNER OR THE ENGINEER IS NOT INTENDED TO BE A SUBSTITUTE FOR, OR A
<br />PERMITTING: SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPT.
<br />SAN JOAQUINC
<br />SUPPLEMENT TO THE INDEPENDENT VERIFICATION BY THE CONTRACTOR TO THE EXTENT SUCH
<br />}fir
<br />HA AVENUE, STOCKMEN, CA 95205
<br />INDEPENDENT INVESTIGATION OF SITE CONDITIONS IS DEEMED NECESSARY OR DESIRABLE BY
<br />(209) 468-3438
<br />THE CONTRACTOR. CONTRACTOR SHALL ACKNOWLEDGE THAT THEY HAVE NOT RELIED SOLELY
<br />SEWER: ONSITE SEPTIC TANK AND LEACH FIELD
<br />UPON OWNER OR ENGINEER FURNISHED INFORMATION REGARDING SITE CONDITIONS IN
<br />WATER: ONSITE PRIVATE WELL
<br />PREPARING AND SUBMITTING THEIR BID.
<br />=3
<br />10)
<br />DRAWING NUMBERS SHOWN ON THE PLANS REFER TO DRAWINGS CONTAINED IN THE SAN
<br />U
<br />JOAQUIN COUNTY, DEPARTMENT OF PUBLIC WORKS STANDARD SPECIFICATIONS.
<br />O
<br />11)
<br />ALL STATIONS REFER TO DISTANCES ALONG STREET CENTERLINE, UNLESS OTHERWISE NOTED.
<br />Q
<br />ALL STATIONS OFF CENTERLINE ARE PERPENDICULAR TO OR RADIALLY OPPOSITE CENTERLINE
<br />STATIONS.
<br />12)
<br />THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, BARRICADES, SIGNS, FLAGGERS OR OTHER
<br />DEVICES NECESSARY FOR PUBLIC SAFETY.
<br />13)
<br />THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ALL WATER, POWER, SANITARY
<br />C:
<br />FACILITIES AND TELEPHONE SERVICES AS REQUIRED FOR THE CONTRACTORS USE DURING
<br />QJ
<br />CONSTRUCTION.
<br />(D
<br />14)
<br />THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY FIELD CHANGES MADE WITHOUT PRIOR
<br />WRITTEN AUTHORIZATION FROM THE OWNER AND/OR ENGINEER.
<br />15)
<br />THE CONTRACTOR SHALL EXERCISE DUE CAUTION AND SHALL CAREFULLY PRESERVE BENCH
<br />ILL
<br />MARKS, CONTROL POINTS, REFERENCE POINTS AND ALL SURVEY STAKES, AND SHALL BEAR ALL
<br />EXPENSES FOR REPLACEMENT AND/OR ERRORS CAUSED BY THEIR UNNECESSARY LOSS OR
<br />DISTURBANCE.
<br />a
<br />0
<br />a
<br />I
<br />a
<br />ON
<br />O
<br />ON
<br />N
<br />T_
<br />r) 0
<br />N
<br />qqN
<br />N
<br />O
<br />N
<br />r�10
<br />N
<br />CD
<br />N
<br />CD
<br />ILL.
<br />16) THE CONTRACTOR AGREES THAT:
<br />A. THEY SHALL BE RESPONSIBLE TO CLEAN THE JOB SITE AT THE END OF EACH PHASE OF WORK.
<br />B. THEY SHALL BE RESPONSIBLE TO REMOVE AND DISPOSE OF ALL TRASH, SCRAP AND UNUSED
<br />MATERIAL AT THEIR OWN EXPENSE IN A TIMELY MANNER.
<br />C. THEY SHALL BE RESPONSIBLE TO MAINTAIN THE SITE IN A NEAT, SAFE AND ORDERLY MANNER
<br />AT ALL TIMES.
<br />D. THEY SHALL BE RESPONSIBLE TO KEEP MATERIALS, EQUIPMENT, AND TRASH OUT OF THE WAY
<br />OF OTHER CONTRACTORS SO AS NOT TO DELAY THE JOB. FAILURE TO DO SO WILL RESULT IN
<br />A DEDUCTION FOR THE COST OF CLEAN UP FROM THE FINAL PAYMENT.
<br />E. THEY SHALL BE RESPONSIBLE FOR THEIR OWN SAFETY TRAFFIC CONTROL PERMITS
<br />RETESTING AND REINSPECTIONS AT THEIR OWN EXPENSE.
<br />F. UNLESS OTHERWISE NOTED ALL EXCESS SOILS AND MATERIALS SHALL BECOME THE
<br />PROPERTY OF THE CONTRACTOR AND SHALL BE LAWFULLY DISPOSED OF OFF SITE AT THE
<br />CONTRACTOR'S EXPENSE.
<br />17) THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOBSITE
<br />CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY
<br />OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY
<br />AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL
<br />DEFEND, INDEMNIFY AND HOLD THE OWNER AND ENGINEER HARMLESS FROM ANY AND ALL
<br />LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS
<br />PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER
<br />OR THE ENGINEER.
<br />18) DUST CONTROL SHALL BE PROVIDED AT ALL TIMES, AT THE CONTRACTOR'S EXPENSE, TO
<br />MINIMIZE ANY DUST NUISANCE AND SHALL BE IN ACCORDANCE WITH SECTION 10 OF
<br />CALTRANS STANDARD SPECIFICATIONS AND THE REQUIREMENTS OF SAN JOAQUIN COUNTY.
<br />19) CONSTRUCTION STAKING FOR GRADING, CURB, GUTTER, SIDEWALK, SANITARY SEWER, STORM
<br />DRAIN, WATER, AND ELECTROLIERS SHALL BE DONE BY OWENS DESIGN CONSULTANTS. THE
<br />CONTRACTOR SHALL NOTIFY THE ENGINEER FORTY-EIGHT (48) HOURS IN ADVANCE OF THE
<br />NEED FOR STAKING. ANY STAKING REQUESTED BY THE CONTRACTOR OR THEIR
<br />SUBCONTRACTORS THAT IS ABOVE AND BEYOND STANDARD STAKING NEEDS, WILL BE
<br />SUBJECT TO AN EXTRA WORK BACK CHARGE TO THE CONTRACTOR.
<br />20) FOR ALL WORK WITHIN PUBLIC RIGHTS -OF -WAYS OR EASEMENTS, THE CONTRACTOR SHALL
<br />PRESERVE THE INTEGRITY AND LOCATION OF ANY AND ALL PUBLIC UTILITIES AND PROVIDE
<br />THE NECESSARY CONSTRUCTION TRAFFIC CONTROL. CONTRACTOR SHALL, THROUGH THE
<br />ENCROACHMENT PERMIT PROCESS, VERIFY WITH THE NECESSARY REGULATORY AGENCIES,
<br />THE NEED FOR ANY TRAFFIC ROUTING PLAN. IF PLAN IS REQUIRED, CONTRACTOR SHALL
<br />PROVIDE PLAN AND RECEIVE PROPER APPROVALS PRIOR TO BEGINNING CONSTRUCTION.
<br />21) THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY SCHEDULING INSPECTION AND
<br />TESTING OF ALL FACILITIES CONSTRUCTED UNDER THIS CONTRACT. ALL TESTING SHALL
<br />CONFORM TO THE REGULATORY AGENCY S STANDARD SPECIFICATIONS. ALL TESTING AND
<br />INSPECTION SHALL BE PAID FOR BY THE OWNER; ALL RE -TESTING AND/OR RE -INSPECTION
<br />SHALL BE PAID FOR BY THE CONTRACTOR.
<br />22) IF EXISTING IMPROVEMENTS NEED TO BE DISTURBED AND/OR REMOVED FOR THE PROPER
<br />PLACEMENT OF IMPROVEMENTS TO BE CONSTRUCTED BY THESE PLANS, THE CONTRACTOR
<br />SHALL BE RESPONSIBLE FOR PROTECTING EXISTING IMPROVEMENTS FROM DAMAGE. COST
<br />OF REPLACING OR REPAIRING EXISTING IMPROVEMENTS SHALL BE INCLUDED IN THE UNIT
<br />PRICE BID FOR ITEMS REQUIRING REMOVAL AND/OR REPLACEMENT OF EXISTING
<br />IMPROVEMENTS. THERE WILL BE NO EXTRA COST DUE THE CONTRACTOR FOR REPLACING OR
<br />REPAIRING EXISTING IMPROVEMENTS.
<br />23) WHENEVER EXISTING FACILITIES ARE REMOVED, DAMAGED, BROKEN, OR CUT IN THE
<br />INSTALLATION OF THE WORK COVERED BY THESE PLANS OR SPECIFICATIONS, SAID FACILITIES
<br />SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE, AFTER PROPER BACKFILLING AND/OR
<br />CONSTRUCTION, WITH MATERIALS EQUAL TO OR BETTER THAN THE MATERIALS USED IN THE
<br />ORIGINAL EXISTING FACILITIES. THE FINISHED PRODUCT SHALL BE SUBJECT TO THE
<br />APPROVAL OF THE OWNER, THE ENGINEER, AND THE RESPECTIVE REGULATORY AGENCY.
<br />24) THE CONTRACTOR SHALL MAINTAIN A NEATLY MARKED SET OF FULL-SIZE AS -BUILT RECORD
<br />DRAWINGS SHOWING THE FINAL LOCATION AND LAYOUT OF ALL MECHANICAL; ELECTRICAL
<br />AND INSTRUMENTATION EQUIPMENT; PIPING AND CONDUITS; STRUCTURES AND OTHER
<br />FACILITIES. THE AS-BUILTS OF THE ELECTRICAL SYSTEM SHALL INCLUDE THE STREET LIGHT
<br />LAYOUT PLAN SHOWING LOCATION OF LIGHTS, CONDUITS, CONDUCTORS, POINTS OF
<br />CONNECTIONS TO SERVICES, PULLBOXES, AND WIRE SIZES. AS -BUILT RECORD DRAWINGS
<br />SHALL REFLECT CHANGE ORDERS, ACCOMMODATIONS, AND ADJUSTMENTS TO ALL
<br />IMPROVEMENTS CONSTRUCTED. WHERE NECESSARY, SUPPLEMENTAL DRAWINGS SHALL BE
<br />PREPARED AND SUBMITTED BY THE CONTRACTOR. PRIOR TO ACCEPTANCE OF THE PROJECT,
<br />THE CONTRACTOR SHALL DELIVER TO THE ENGINEER, ONE SET OF NEATLY MARKED AS -BUILT
<br />RECORD DRAWINGS SHOWING THE INFORMATION REQUIRED ABOVE. AS -BUILT RECORD
<br />DRAWINGS SHALL BE REVIEWED AND THE COMPLETE AS -BUILT RECORD DRAWING SET SHALL
<br />BE CURRENT WITH ALL CHANGES AND DEVIATIONS REDLINED AS A PRECONDITION TO THE
<br />FINAL PROGRESS PAYMENT APPROVAL AND/OR FINAL ACCEPTANCE.
<br />25) DRIVEWAYS ON STREETS ARE TO BE LOCATED IN THE FIELD BY THE ENGINEER AT THE TIME
<br />OF CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE ENGINEER, IN WRITING, FORTY-EIGHT
<br />(48) HOURS IN ADVANCE OF THE NEED FOR DRIVEWAY LOCATIONS. DRIVEWAYS SHALL NOT
<br />COINCIDE WITH WHEELCHAIR RAMPS.
<br />26) WORK IN EASEMENT AND/OR RIGHTS-OF-WAY IS SUBJECT TO THE APPROVAL AND
<br />ACCEPTANCE OF THE REGULATORY AGENCY RESPONSIBLE FOR OPERATION AND/OR
<br />MAINTENANCE OF SAID EASEMENT AND/OR RIGHTS-OF-WAY.
<br />UNDERGROUND UTILITIES
<br />1) THE INFORMATION SHOWN ON THE PLANS WITH REGARD TO THE EXISTING UTILITIES AND/OR
<br />IMPROVEMENTS WAS DERIVED FROM FIELD INVESTIGATIONS AND/OR RECORD INFORMATION. THE
<br />ENGINEER DOES NOT GUARANTEE THESE LOCATIONS TO BE EITHER TRUE OR EXACT. PRIOR TO
<br />CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO VERIFY ALL EXISTING
<br />IMPROVEMENTS AND TO EXPOSE ALL EXISTING UNDERGROUND UTILITIES RELATED TO THE PROJECT,
<br />INCLUDING BUT NOT LIMITED TO, SEWER, STORM DRAIN, WATER, IRRIGATION, GAS, ELECTRICAL, ETC.
<br />AND SHALL NOTIFY THE ENGINEER IN WRITING FORTY-EIGHT (48) HOURS IN ADVANCE OF EXPOSING
<br />THE UTILITIES SO THAT THE EXACT LOCATION AND ELEVATION CAN BE VERIFIED AND DOCUMENTED.
<br />THE COST ASSOCIATED TO PERFORM THIS WORK SHALL BE INCLUDED IN EITHER THE LUMP SUM
<br />CLEARING COST OR IN THE VARIOUS ITEMS OF WORK. IF LOCATION AND/OR ELEVATION DIFFERS
<br />FROM THAT SHOWN ON THE DESIGN PLANS, PROVISIONS TO ACCOMMODATE NEW
<br />LOCATION/ELEVATION MUST BE MADE PRIOR TO CONSTRUCTION.
<br />2 PRIOR TO COMMENCING ANY WORK IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO HAVE
<br />EACH UTILITY COMPANY LOCATE, IN THE FIELD, THEIR MAIN AND SERVICE LINES. THE CONTRACTOR
<br />SHALL NOTIFY MEMBERS OF THE UNDERGROUND SERVICE ALERT (U.S.A.) 48 HOURS IN ADVANCE OF
<br />PERFORMING ANY EXCAVATION WORK BY CALLING THE TOLL-FREE NUMBER 811. THE CONTRACTOR
<br />SHALL RECORD THE U.S.A. ORDER NUMBER AND FURNISH ORDER NUMBER TO OWNER AND
<br />ENGINEER PRIOR TO ANY EXCAVATION. IT WILL BE THE CONTRACTORS SOLE RESPONSIBILITY TO
<br />DIRECTLY CONTACT ANY OTHER UTILITY COMPANIES THAT ARE NOT MEMBERS OF UNDERGROUND
<br />SERVICE ALERT. IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT ALL EXISTING
<br />UTILITIES SO THAT NO DAMAGE RESULTS TO THEM DURING THE PERFORMANCE OF THIS CONTRACT.
<br />ANY REPAIRS NECESSARY TO DAMAGED UTILITIES SHALL BE PAID FOR BY THE CONTRACTOR. THE
<br />CONTRACTOR SHALL BE REQUIRED TO COOPERATE WITH OTHER CONTRACTORS AND UTILITY
<br />COMPANIES INSTALLING NEW STRUCTURES, UTILITIES AND SERVICE TO THE PROJECT.
<br />3) THE CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING, SLOPING OR OTHER PROVISIONS
<br />NECESSARY TO PROTECT WORKERS FOR ALL AREAS TO BE EXCAVATED TO A DEPTH OF 4' OR MORE.
<br />EXCAVATIONS OF 4 FEET OR MORE IN DEPTH WILL REQUIRE AN EXCAVATIONS PERMIT FROM THE
<br />STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL SAFETY. FOR TRENCHES 4 FEET OR MORE IN
<br />DEPTH, THE CONTRACTOR SHALL COMPLY WITH SECTION 5-1.02A OF THE CALTRANS STANDARDS,
<br />SECTION 6705 OF THE STATE OF CALIFORNIA LABOR CODE, AND ANY LOCAL CODES OR ORDINANCES.
<br />4) WE CALL YOUR ATTENTION TO TITLE 8 CALIFORNIA ADMINISTRATION CODE SECTION 1540 (A) (1) OF
<br />THE CONSTRUCTION SAFETY ORDERS ISSUED BY THE OCCUPATIONAL SAFETY AND HEALTH
<br />STANDARDS BOARD PURSUANT TO THE CALIFORNIA OCCUPATIONS SAFETY AND HEALTH ACT OF 1973
<br />AS AMENDED WHICH STATES: (1) PRIOR TO OPENING AN EXCAVATION, EFFORT SHALL BE MADE TO
<br />DETERMINE WHETHER UNDERGROUND INSTALLATIONS; I.E. SEWER, WATER, FUEL, ELECTRIC LINES,
<br />ETC., WILL BE ENCOUNTERED AND IF SO, WHERE SUCH UNDERGROUND INSTALLATIONS ARE
<br />LOCATED. WHEN THE EXCAVATION APPROACHES THE APPROXIMATE LOCATION OF SUCH AN
<br />INSTALLATION, THE EXACT LOCATION SHALL BE DETERMINED BY CAREFUL PROBING OR HAND
<br />DIGGING; AND WHEN IT IS UNCOVERED ADEQUATE PROTECTION SHALL BE PROVIDED FOR THE
<br />EXISTING INSTALLATION. ALL KNOWN OWNERS OF UNDERGROUND FACILITIES IN THE AREA
<br />CONCERNED SHALL BE ADVISED OF PROPOSED WORK AT LEAST 48 HOURS PRIOR TO THE START OF
<br />ACTUAL EXCAVATION.
<br />5) CONTRACTOR SHALL USE RUBBER GASKET JOINTS ON ALL PRECAST PIPES. THE COST FOR RUBBER
<br />GASKET JOINTS SHALL BE INCLUDED IN THE UNIT PRICE OF PIPE.
<br />6) IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INSTALL PIPE OF ADEQUATE CLASSIFICATION
<br />WITH SUFFICIENT BEDDING TO MEET ALL REQUIREMENTS AND RECOMMENDATIONS OF SAN JOAQUIN
<br />COUNTY FOR D -LOAD REQUIREMENTS.
<br />ASBU/LT DRAW/NG
<br />BY. DA TE:
<br />V
<br />Lf) tb
<br />O
<br />1C00011 i1----�i
<br />i
<br />V W1--�
<br />FZ)
<br />z�
<br />I�
<br />V Ce) Lo
<br />Lp
<br />vM l, CD
<br />vnz"
<br />Z=
<br />ON l� O ...i
<br />O
<br />PROFESS/O�q`
<br />P
<br />Z
<br />No. 53530
<br />�9T
<br />CIVIL 0NI
<br />FOP
<br />CAQ
<br />EXP. 6/30/23
<br />NEW
<br />SUBDIVISION
<br />IMPROVEMENTS
<br />FOR:
<br />JOE
<br />DUTRA
<br />29384 EAST
<br />LONE TREE RD.
<br />ESCALON, CA
<br />Revisions:
<br />Date
<br />)
<br />2
<br />3
<br />4
<br />5
<br />6
<br />7
<br />A
<br />9
<br />Title:
<br />NOTES
<br />AND
<br />SPECS.
<br />Drawn By: T.J.O.
<br />Checked By: TJo
<br />Scale: AS NOTED
<br />Job No. 2022042
<br />Date: July 26, 2023
<br />CAD File Name:
<br />2022042 Dutra IPs.dwg
<br />Sheet No.
<br />C2.0
<br />
|