Laserfiche WebLink
Limits of Clearinq and Grubbinq and Mailbox relocation <br />0-2 1 0'-2' tN 10-12' 1 �10'— <br />Safety 1, Var 1' Safety <br />Edge <br />e Pavement Reinforcing Fabric Edge <br />.21' AC Overlay <br />c 30' 30' <br />0 � _Vor Var_ <br />Existing 8% <br />Surface �0r <br />T!-; 11 IIh r <br />I.i` L _ <br />--- ------ -------------- <br />-� <br />Var Depth <br />Shoulder Backing Existing Roadway TYPICAL SECTION <br />Grade Existing Shoulder <br />Sto 10+13 to Sta 173+49 <br />to place Safety Edge, <br />*16' : Sta 16+48 to Sto 16+96 (Lt) 1' min width (Typ) <br />Sta 16+35 to Sto 16+79 (Rt) <br />GEPIERAL NOTES: <br />1. Prior to commencing any work, it shall be the Contractors responsibility to hove each utility <br />company locate in the field their main and service lines. The contractor shall notify Underground <br />Service Alert (USA), at 1-800-277-2600 at least 48 hours in advance of performing excavation work. <br />2. All existing trees, shrubs, fences, drainage facilities and other improvements shall remain in <br />place unless otherwise noted. <br />3. Asphalt Concrete shall be placed in one (1) layer with Pavement Reinforcing Fabric placed <br />over existing pavement. <br />4. Placement of Asphalt Concrete Overlay shall not begin until the Asphalt Concrete used <br />in Pavement Repair has been in place for 18 hours. <br />5. Placement of all Asphalt Concrete Driveways shall not begin until the Asphalt Concrete used <br />for Mainline Paving has been in place for a minimum of 18 hours. <br />6. The Contractor shall be responsible for adequately scheduling <br />inspection and testing of <br />all facilities constructed under this contract. All testing shall conform to the Standard Specifications. <br />All re—testing shall be paid for by the Contractor._ <br />7. Shoulder Backing material at all intersection radii shall receive Penetration Treatment at <br />0.25 gallon/square yard. Limits of the Penetration Treatment work shall be confined to intersection <br />radii plus fifty feet (50') in each direction or intersection conform. <br />COUNTY OF SAN dOAQUIN �' NO SCALE <br />Existing <br />— Surface <br />Backing <br />8. All earthwork (except for final shoulder grading) shall .be completed prior to placing Asphalt <br />Concrete. No Shoulder Backing material shall be deposited or drifted on Asphalt surfacing. <br />9. Clean existjng cross drain culverts at Station 28+54, Station 51+95, Station 110+97, and <br />Station 173+15. Payment shall be included in the Clearing and Grubbing pay item. <br />10. Temporary Stop Signs, Legends and Markers shall be established at 'the end of each work day <br />and as approved by the Engineer. <br />11. No Safety Edge at box culverts, driveways and Oak View School paved asphalt concrete frontage. <br />12. Driveway reconstruction at school shall conform at fence gate. <br />13. Payment for removal and disposal of driveway corrugated metal pipes at School shall be <br />included in the Place School—Furnished 12? Diameter Reinforced Concrete Driveway Pipe <br />(Class IV) pay item. Contact School Principal (Beverly Boone) at (209) 368-0636 at least <br />48 hours in advance of placing pipes. <br />14. Shoulder backing shall be placed 2' at 8% with 2' to conform wherever possible. <br />Sheet No. <br />