Laserfiche WebLink
N <br />m <br />u1 <br />o. <br />,F <br />GRCS over <br />—Cold Plane Fine Grinding <br />EP �� Const <br />L 0 W E R <br />Nr <br />GRCS (Second Chip Seal Only) <br />over Cold Plane Fine Grinding <br />❑1 Stq 116+02 (CL) Remove existing Monument Frame and Cover <br />and backfill hole with AC, flush with existing surface. Existing <br />Monument to remain in place, undisturbed. <br />Z Sta 114+80 to Sta 117+23 place second chip seal of GRCS <br />only. Do not place Pavement Reinforcing Fabric or first chip <br />seal of GRCS. <br />EP <br />rn <br />LRCS over <br />Cold Plane Fine Grinding <br />I <br />Existing Monument Frame and <br />Cover (to remain in place) <br />COUNTY OF SAN JOAQ UIN <br />DRAWN BY DATE PROJECT EN <br />Const <br />0 <br />i Stu 116+05 (2' Rt) Place <br />Monument Frame and Cover per <br />SJCO Std Plan CW -M1 <br />(See Detail, Sht No. 5) <br />i <br />0 1 <br />o \ <br />o � <br />a � <br />7�1�1 <br />GRCS over <br />Cold <br />one Fine Grinding <br />EP <br />COnSt /-EP <br />David Mendoza <br />RCE 42581 <br />Sheet No. <br />4of5 <br />