Laserfiche WebLink
A <br />� <br />� <br />m <br />E+ <br />Eo <br />o <br />/ <br />o <br />� <br />O <br />n <br />� <br />D <br />U <br />(n <br />0 <br />o/ <br />D <br />m <br />o <br />D <br />Z� <br />� <br />I <br />� <br />/ <br />m <br />� <br />� <br />D <br />y <br />a <br />� <br />w� <br />v� <br />O <br />F <br />y <br />a <br />f <br />O <br />n <br />m <br />D <br />m <br />50' <br />25' <br />�N dQOQ cap <br />lol o lol o Boulders to be <br />1� <br />removed by others <br />Frame and Cover to <br />be adjusted by others <br />I OLIVE <br />w <br />m 11 <br />R BEGINNING OF <br />OVERLAY <br />EP <br />1 <br />0.25' AC <br />1 <br />Const <br />AVENUE <br />3 <br />0 <br />14, 15 �.3°)!Twa <br />a) <br />EP,: <br />COUNTY OF SAN JOAQUIN o 20 ao so <br />SCALE IN FEET <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />JOHN YANG 6/14 G�11��y <br />PLAN <br />CHECKE <br />DATE <br />)F <br />FREDERICK AVENUE AND OLIVE AVENUE RESURFACING Sheet No. <br />(WEST RIPON ROAD TO NORTH END) 5 of 7 <br />E+ <br />Eo <br />o <br />C <br />a <br />U <br />(n <br />0 <br />a <br />O <br />Z� <br />O <br />oL <br />H <br />N <br />w� <br />50' <br />25' <br />�N dQOQ cap <br />lol o lol o Boulders to be <br />1� <br />removed by others <br />Frame and Cover to <br />be adjusted by others <br />I OLIVE <br />w <br />m 11 <br />R BEGINNING OF <br />OVERLAY <br />EP <br />1 <br />0.25' AC <br />1 <br />Const <br />AVENUE <br />3 <br />0 <br />14, 15 �.3°)!Twa <br />a) <br />EP,: <br />COUNTY OF SAN JOAQUIN o 20 ao so <br />SCALE IN FEET <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />JOHN YANG 6/14 G�11��y <br />PLAN <br />CHECKE <br />DATE <br />)F <br />FREDERICK AVENUE AND OLIVE AVENUE RESURFACING Sheet No. <br />(WEST RIPON ROAD TO NORTH END) 5 of 7 <br />