My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6435 - SP6440
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6055 - SP6717
>
SP6435 - SP6440
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:15:54 PM
Creation date
8/17/2023 1:23:49 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Jack Tone Road Resurfacing
Limits
Peltier Road to Collier Road
Year
2014
Project Engineer
Awni Taha
Roads Worked
Jack Tone Rd.
Red Lines
Yes
Project #
220830
Supplemental fields
Classification
Record Drawings
Cross Ref
SP6435 - SP6440
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const <br />I <br />Limits of Clearing and Grubbing <br />and Mailbox Relocation <br />See EP ( EP See <br />Shoulder 9,+ g,+ Shou der <br />Details 11 p Details <br />On Sheet Min 8 T 8 Min <br />On Sheet <br />No. 3 Pavement Reinforcing Fabric i Pavement Reinforcing Fabric No. 3 <br />Safety�0, Vor I Var + 3\ Safety <br />Edge <br />Edge z Edge <br />I--- -------------- ------------ -----� <br />TYPICAL SECTION 0.25' AC Overlay <br />Structure <br />Existing Road Ste 10+15 to 62+80 <br />Ste 63+57 to 116+12 <br />GENERAL NOTES: <br />1. Placement of Asphalt Concrete <br />overlay <br />shall <br />not <br />begin until <br />the <br />Asphalt Concrete <br />used in Pavement Repair has <br />been in <br />place <br />for <br />a minimum <br />of <br />18 hours. <br />2. The 0.25' Asphalt Concrete shall be placed in two (2) layers. of approximately equal <br />thickness with Pavement Reinforcing Fabric placed over the first the layer. <br />3. Placement of Asphalt Concrete Driveways shall not begin until the Asphalt Concrete <br />used for Mainline Paving has been in place for a minimum of 18 hours. <br />4. No Shoulder Backing material shall be deposited or drifted on the final layer of <br />Asphalt Concrete surfacing. Where the shoulder placement exceeds 0.30' in <br />thickness, the Shoulder Backing shall be placed in two (2) or more fully compacted <br />layers of approximate equal thickness. <br />5. The Contractor shall conduct earthwork operations so as not to modify or obstruct <br />the existing drainage. <br />6. Existing highway and utility facilities, including roadside signs, trees, shrubs, fences, <br />.utility poles and other frontage improvements shall remain in place unless otherwise <br />noted. <br />7. Shoulder Backing material at all intersection radii shall receive Penetration Treatment <br />at 0.25 gallon/square yard. Limits of the Penetration Treatment work shall be <br />confined to the intersection radii plus fifty feet (50') in each direction or to the <br />intersection conform. <br />8. The Contractor shall be responsible for adequately scheduling inspection and testing <br />of all facilities constructed under this contract. All testing shall conform to the <br />Standard Specifications. All re—testing shall be paid by the Contractor. <br />COUNTY OF SAN JOAQUIN �No SCALE <br />9. Minor structure (Sta 86+78 to Sta 86+91), cross drain pipes (9 <br />locations throughout), and driveway pipes (9 locations throughout) <br />shall be cleaned and paid for under the Cleaning Existing Drainage <br />Facilities item, and no additional compensation will be made <br />thereof. Location of cross drain and driveway pipes are listed <br />below. <br />Cross DfOlrl Pipe Locations <br />Sta <br />10+52 <br />Sta <br />32+31 <br />Ste <br />52+92 <br />Ste <br />60+00 <br />Ste <br />67+80 <br />Ste <br />67+85 <br />Ste <br />88+14 <br />Ste <br />101+56 <br />Ste <br />112+55 <br />Drivewdv Pioe Locations <br />Sta <br />34+07 <br />(Lt) <br />Sta <br />51+10 <br />(Lt) <br />Sta <br />57+70 <br />(Lt) <br />Sta <br />59+15 <br />(Lt) <br />Sta <br />67+24 <br />(Rt) <br />Sta <br />78+62 <br />(Rt) <br />Sta <br />79+75 <br />(Rt) <br />Sta <br />80+71 <br />(Rt) <br />Std <br />83+62 <br />(Lt) <br />TYPICAL SECTION & GENERAL NOTESME <br />JACK TONE ROAD RES <br />(Peltier Road to Collier <br />Sheet No. <br />2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.