Laserfiche WebLink
GENERAL NOTES <br />1. Prior to commencing any work, it will be the Contractor's responsibility to have 11. All intersection radii within project limits must be slurry sealed to lip of existing <br />each utility company locate in the field their main service lines and laterals. curb and gutter or edge of pavement. <br />The Contractor must notify members of the Underground Service Alert (U.S.A) <br />48 hours in advance of performing excavation work by calling the toll free 12. Before slurry seal is to be applied to any area, the Contractor must protect all <br />(1-800-227-2600), utility covers, including but not limited to maintenance holes, water valves and <br />survey monument frames and covers. Contractor must remove protective covers <br />2. The Contractor must field verify all existing highway and utility facilitiesafter slurry seal. Full compensation shall be considered as included in the unit price <br />locations and depths. It will be the. Contractor's sole responsibility to locate for Slurry Seal (Type II) item of work. <br />and protect all existing highway and utility facilities, so that no damage results <br />to them during the performance of this contract. The Contractor will be 13. Surface preparation work must be as directed by the Engineer. Locations and <br />required to cooperate with other contractors and utility companies installing dimensions of pavement repair will be determined by the Engineer and must be in <br />new structures, utilities, and services to the project. Payment for this work place for 18 hours prior to placing slurry seal. <br />shall be considered to be included in the various items of work. 14. The aggregate for Slurry Seal must be Type II, <br />3. The Contractor must place temporary ramps to affected residents' driveways at 15. The Contractor is to remove and dispose of all existing Thermoplastic Traffic Stripes <br />the end of each working day if a drop off greater than 0.15' exists. Ramp and Pavement Markings in all areas. The cost for this work is to be included in the <br />materials must be consistent with that of the roadbed (or roadway) surface contract price paid for Remove Thermoplastic Traffic Stripes and Pavement Markings <br />that it is to be placed upon. Payment for this shall be considered as included items of work and no separate payment will be made therefor. <br />in the various items of work. <br />4. The Contractor will be responsible for adequately scheduling inspection and 16. Areas in County right—of—way used by the Contractor for staging and/or storage of <br />testing of all facilities constructed under this contract with a minimum of 24 materials must be approved by the Engineer. The areas utilized by the Contractor <br />hour notice to the County. All testing must conform to the Standard for staging and/or storage of materials must be restored to their original condition. <br />Specifications. All re—testing shall be paid by the Contractor. Any damages or unclean condition to staging or storage areas must be repaired at <br />the Contractor's own expense. It will be the Contractor's responsibility to obtain <br />5. The Contractor must obtain an Encroachment Permit from the City of Stockton permission from the property owner to stage equipment or store materials on <br />for traffic control or any work within the City's jurisdiction. Payment for this private property. The Contractor must provide a letter of release from the property <br />shall be considered to be included in the various items of work. owner(s) of the areas utilized for staging and/or storage of materials. <br />6. The Contractor must obtain all permits and licenses required for the 17. The Contractor must perform Slurry Seal operations only on weekends on streets <br />construction and completion of the project, and must perform all work in where schools are situated or unless allowed by written approval from the Engineer. <br />accordance with the requirements and conditions of all permits and approvals The Contractor must not begin slurry sealing a street after 1:OOPM without the <br />applicable to the project. approval from the Resident Engineer. <br />7. The Contractor must exercise due caution and carefully preserve survey bench 18. Existing highway and utility facilities must remain in place unless otherwise noted. <br />marks, control points, reference points and all survey stakes, and must bear <br />all expenses for replacement and/or errors caused by their unnecessary loss 19. Existing trees, shrubs, fences, mailboxes and other frontage improvements must <br />or disturbance. remain in place unless otherwise noted. <br />8. All new Curb, Gutter and Sidewalk must conform to the existing flowline 20. Existing drainage facilities must remain in place unless otherwise noted. The <br />elevations with a straight grade between conforms unless otherwise noted. Contractor must conduct earthwork operations so as not to modify or obstruct the <br />existing drainage. <br />9. Install Expansion Joints at beginning and end of new Curb, Gutter and Sidewalk <br />and between new sidewalks and existing driveways. <br />10. One week prior to the start of work, the Contractor must furnish to the <br />Engineer a schedule showing proposed street closures on each half—day basis. <br />No work will commence until this schedule is approved by the Engineer. <br />COUNTY OF SAN JOAQUIN No SCALE GENERAL NOTES EAST COUNTRY CLUB RECONSTRUCTION, PHASE 1 sheet No. <br />(Delaware, Dennis, Hogue & Nina Avenues: La Jolla Drive to North End; Lo Jolla Drive: Hogue Avenue to Stockton City Limit) 2 of 10 <br />DRAWN BYDATE PROJECT ENGINEER DATE CHECKED DATE <br />1�onljpdgers 12/14 JbI /1 r 9��1*5 <br />