My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6488 - SP6491
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6055 - SP6717
>
SP6488 - SP6491
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:19:38 PM
Creation date
8/18/2023 11:14:29 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Geosynthetic Reinforced Chip Seal 2014
Limits
Rd 1: Fisk Road (West End to Airport Way) RD 4: Woodbridge Road (Kennefick Road to East End) RD 5: Brady Road (Manteca Road to East End) Mountain View Road (Corral Hollow Road to East End) Trisler Court (Mountain View Road to North End)
Year
2015
Project Engineer
Toshiro Sessoms
Roads Worked
Fisk Rd., Woodbridge Rd., Brady Rd., Mountain View Rd.
Trisler Ct.
Red Lines
Yes
Project #
220105
Supplemental fields
Classification
Record Drawings
Cross Ref
SP6488 - SP6491
Type
Geosynthetic Reinforced Chip Seal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES: <br />1. Existing highway and utility facilities must remain in place unless otherwise noted. <br />2. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in place unless otherwise <br />noted. <br />3. Existing drainage facilities must remain in place unless otherwise noted. The Contractor must conduct earthwork <br />operations so as not to obstruct the existing drainage. <br />4. Place Survey Monument Frame and Cover and Earthwork (Miscellaneous Areas) must be completed prior to placing <br />of Geosynthetic Reinforced Chip Seal. <br />5, The Contractor will be responsible for adequately scheduling inspection and testing of all facilities constructed under <br />this contract with a minimum 24 hour notice to the County. All testing must conform to the Standard <br />Specifications. All re—testing will be paid by the Contractor. <br />6. The Contractor must enter into an Agreement with the Central California Traction Railroad for any work within the <br />Railroad's right—of—way. See SECTION 5-1.20C Railroad Relations of the Specifications for further details. <br />Const <br />EP Limits of Cleari l g and Grubbing EP <br />*See Table Below <br />Geosynthetic Reinforced Chip Seal <br />♦See this sheet 0.5 **See Table Below 0.5 ♦ See this sheet <br />Earthwork M��Geosynthetic Pavement Ilnterloyer (Paving Fabric) Earthwork <br />(Miscellaneous Areas) (Miscellaneous Areas) <br />Detail <br />Detail <br />— ----H —------- �T/��-- <br />Existing Roadway Existing <br />Surface (Typ) <br />TYPICAL SECTION <br />ROAD NAME <br />STATIONS <br />*ROAD <br />WIDTH <br />** FABRIC <br />WIDTH <br />Fisk Road <br />10+00 <br />to <br />32+14 <br />22' <br />21' <br />Woodbridge Road <br />10+63 <br />to <br />63+78 <br />22' <br />21' <br />63+78 to 81+57 <br />18' <br />17' <br />Brady Road <br />Mountain View Road <br />10+12 <br />10+12 <br />to <br />to <br />62+80 <br />36+34 <br />21' <br />20' <br />20' <br />19' <br />Trisler Court <br />10+10 <br />to <br />13+10 <br />30' <br />29' <br />13+10 to 14+06 <br />130'-80' <br />COUNTY OF SAN JOAQUIN NOT TO SCALE <br />DRAWN BY I DATE I PROJECTENGINEERDATE <br />,Yohv°Wase F 02/15 5o"Sft � �Z((i j( <br />GENERAL NOTES, <br />TYPICAL SECTION <br />CHECKED DATE <br />4Min <br />See Note Below <br />Existing <br />Existing <br />Surface rRoadway <br />L0.40' HMA <br />PAVEMENT REPAIR DETAIL <br />Note: Approximate dimensions and locations used for <br />estimating purposes are available upon request. <br />Dimensions and locations are subject to change <br />at Engineer's Discretion. <br />Const <br />Limits of Clearing and Grubbing <br />EP Earthwork <br />(Misc Areas) <br />Var 4' 2' 1, <br />E <br />0 <br />o Existing <br />_ �/jSurface <br />L Existing Roadway <br />EARTHWORK <br />(MISCELLANEOUS AREAS) <br />DETAIL <br />Woodbridge Road — Sto 10+63 to Sto 81+57 (Lt & Rt) <br />�EOSYNTHETIC REINFORCED CHIP SEAL 2014 I Sheet No. <br />Road, Woodbridge Road, Brady Road, Mountain dew Road and Trisler Court) 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.