Laserfiche WebLink
FOLLOW PROCEDURES AS DETAILED INNORTHERN SECTOR PLAN FOR PROTECTIONOF UNDERGROUND AND BURIED CABLEM.O.P. DATEDM.O.P REQUIREDCATEGORY - 3Call USA @ 81148hrs prior to start of workFENCECONGRUEXR A SI A P A CIFIC-08/08/2023POLEFOCFACE OF CURBPROPOSED CONDUITR/WRIGHT OF WAYCLCENTERLINELEGENDBOSBACK OF SIDEWALKSSTOP SIGNCSWCONCRETE SIDEWALKSAFETY NOTE WORK AREA WILL INCLUDE LANECLOSURE ON ROAD WITH VERY HIGHTRAFFIC VOLUME. PLEASE PROVIDECOMPLETE WORK AREA PROTECTION.EOPEDGE OF PAVEMENTGENERAL NOTES:1. CONTRACTOR SHALL REQUEST LOCATION OFUNDERGROUND FACILITIES BY USA2. CONTRACTOR WILL COMPLY WITH ALLSAN JOAQUIN COUNTY REGULATIONS FOR SPLICEPIT & SURFACE COMPACTION3. CONTRACTOR WILL RETURN WORK AREA BACKTO ORIGINAL OR BETTER CONDITION PRIOR TOSTART OF WORK4. MAINTAIN 48" MINIMUM COVER