Laserfiche WebLink
OD <br />3 <br />D <br />i� c) <br />o <br />m <br />if m <br />n Z <br />D <br />CL <br />CL <br />m <br />C <br />3 <br />a <br />19 <br />0 <br />D <br />M <br />M <br />ADJUST MONUMENT <br />FRAME AND COVER <br />Location Quantity <br />EIGHT MILE ROAD <br />• Atherton Road (Center) 1 Each <br />• Correia Road (Center) 1 Each <br />• West of Bishop Cut Bridge (Center) 1 Each <br />Total 3 Each <br />PAVEMENT REPAIR <br />Location Quantity <br />Eight Mile Road <br />Various Locations 265 S.Y. <br />Total 265 S.Y. <br />PLANING ASPHALT CONCRETE PAVEMENT <br />(CONFORMS AND PULVERIZED EXISTING PAVEMENT) <br />Location Quantity <br />Eight Mile Road <br />Empire Tract Road To Honker Cut 28,686 S.Y. <br />(0.17' Depth) <br />Honker Cut To Bishop Cut 26,670 S.Y. <br />(0.33' Depth) <br />Conforms 560 S.Y. <br />Total 55,916 S.Y. <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER <br />G. Xiong 03/13/2012 7 <br />CLASS II AGGREGATE BASE <br />(ROAD BASE AND SHOULDER BACKING) <br />Location Quantity <br />Eight Mile Road <br />Empire Tract Road 14,200 Tons <br />to Bishop Cut <br />Total 14,200 Tons <br />TRIPLE CHIP SEAL <br />Location Quantity <br />Eight Mile Road Road <br />Empire Tract Road 60,300 S.Y. <br />to Bishop Cut <br />Total 60,300 S.Y. <br />DRIVEWAYS (TYPE D) <br />Location Quantity <br />Eight Mile Road <br />11 Locations <br />310 S. Y. <br />Total 310 S.Y. <br />DRIVEWAYS (TYPE E) <br />Location Quantity <br />Eight Mile Road Road <br />Locations <br />Total 164 S.Y. <br />NO SCALE I SUMMARY OF QUANTITIES <br />DATE CHECKED <br />ASPHALT CONCRETE (TYPE B) <br />Location Quantity <br />Eight Mile Road <br />Driveways 87 Tons <br />Pavements Repair 71 Tons <br />Transitions/Conforms 136 Tons <br />Total 294 Tons <br />ASPHALT CONCRETE DIKE (TYPE A) <br />Location Quantity <br />Eight Mile Road Road <br />Various Locations 895 L.F. <br />As Shown On Plans <br />Total 895 L.F. <br />PENETRATION TREATMENT <br />Location Quantity <br />Eight Mile Road Road 60,300 S.Y. <br />Empire Tract Road <br />to Bishop Cut <br />Total 60,300 S.Y. <br />EIGHT MILE ROAD RESTORATION PROJECT <br />(EMPIRE TRACT ROAD TO BISHOP CUT) <br />DATE <br />3)1,311 L <br />Sheet No. <br />5A of 5 <br />