My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6020 - SP6023
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP6020 - SP6023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:53:59 PM
Creation date
8/22/2023 4:41:21 PM
Metadata
Fields
Template:
Small Plans - SP
Project
River Road Resurfacing
Limits
North Ripon Road to Murphy Road
Year
2012
Roads Worked
River Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP6020 - SP6023
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
U <br />0 <br />70 <br />M <br />X <br />U) <br />M <br />m <br />Z <br />0 <br />4' <br />2' 2 m <br />0 <br />0 <br />00 <br />3 <br />OG <br />�Y LIZ 1�-'fi <br />Shoulder Backing L <br />0.10' Min. AC <br />Leveling Course <br />q_ <br />Const. <br />Limits of Clearing and Grubbing and mailbox Relocation <br />12' <br />22't <br />Pavement Reinforcing Fabric <br />12' <br />LEGEN <br />®Variable Depth Asphalt <br />Concrete Overlay <br />0.00' Depth of Asphalt Concrete <br />Pavement Planing <br />Limits of Asphalt Concrete <br />Pavement Planing <br />Sta. 10+00 (Center) <br />Existing monument <br />Existing <br />Round–about <br />Island <br />Rnnei- " <br />TYPICAL SECTION <br />RIVER ROAD <br />(North Ripon Road to Murphy Road) <br />R Conform to <br />Existing Radii <br />0 Exist. monument <br />frame and cover <br />to be adjusted <br />to grade <br />R <br />0.15' Asphalt <br />Concrete <br />Overlay <br />4' <br />8vl 3 <br />OG <br />µ. •M <br />/A\\ <br />\ IAl L.�// <br />I Shoulder Backing <br />Limits of Clearing & Grubbing <br />EP Earthwork <br />(Misc. Areas) <br />Const 0.25 4' 4' <br />Vaf $_— –f <br />7171 77 <br />C< <br />Shoulder Grade <br />Backing (Exist) <br />Roadway <br />Exist SHOULDER DETAIL 1 <br />River Road <br />Sta. 10+20 to Sta. 15+00 (LT) <br />rm <br />GENERAL NOTES: <br />1. Placement of Asphalt Concrete shall not begin until Asphalt <br />Concrete used in Pavement Repair has been in place for 18 hours. <br />2. Shoulder Backing Material at all intersection radii shall recieve <br />Penetration Treatment at 0.25 gallon/square yard. Limits of the <br />Penetration Treatment work shall be confined to intersection radii <br />plus fifty feet (50') in each direction or to intersection conform. <br />3. Pavement reinforcing fabric shall be placed on leveled or prepared <br />surfacing on top of AC leveling course. <br />4. The Asphalt Concrete shall be placed as noted: <br />0.25' AC — One (1) 0.15' layer of Asphalt Concrete to placed <br />over 0.10' leveling course. <br />5. The Contractor shall conduct the Shoulder Backing operation so <br />as not to disrupt or obstruct any existing drainage. <br />6. The Contractor shall be responsible for adequately scheduling <br />inspection and testing of all facilities constructed under this contract. <br />All testing shall conform to the Standard Specifications. All re—testing <br />shall be paid by the Contractor. <br />7. Contractor shall scarify native soil adjacent to pavement at intersection <br />radii to a depth of 6" and blend Shoulder Backing materials prior to <br />compaction. Limits of this work shall be confined to intersection radii <br />plus 50 feet in each directions. Payment for blending shall be considered <br />as included in the price for Shoulder Backing. <br />0.15' Asphalt Concrete Overlay <br />Over 0.10' Asphalt Concrete Leveling Course <br />N rt <br />D P <br />O w <br />O <br />q- Const. <br />D N 11 / 12 N <br />N River Road N <br />--------------------- <br />0 <br />0 Existing Concrete Dike <br />;'R to Remain in place <br />BEGINNING OF PROJECT <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PR JECT ENGINEER <br />G. Xiong 05/10/2012 <br />Sta. 37+00 (Center) <br />Adjust existing monument <br />frame and cover to grade 7 L <br />Const. q- Const. <br />N 36 N N 63 <br />AM <br />N N N River Road <br />NO SCALE TYPICAL SECTION, GENERAL NOTES, <br />SHOULDER DETAIL, AND PLANS <br />DATE CHECKED <br />S Lo It _ - $ <br />DATE <br />s/10/4 <br />50't <br />A.C. Trans. (n 0 <br />00 <br />025'± a, o <br />W 3 <br />J <br />O O <br />O <br />I <br />R <br />END OF PROJECT <br />RIVER ROAD RESURFACING <br />(NORTH RIPON ROAD TO MURPHY ROAD) <br />Sheet No. <br />2 of 4 <br />50't <br />rt <br />A.C. Trans. <br />: <br />O� <br />0 25't <br />+ 3 <br />O� <br />N <br />O <br />O <br />� <br />O <br />O <br />O <br />R <br />0.15' Asphalt <br />Concrete <br />Overlay <br />4' <br />8vl 3 <br />OG <br />µ. •M <br />/A\\ <br />\ IAl L.�// <br />I Shoulder Backing <br />Limits of Clearing & Grubbing <br />EP Earthwork <br />(Misc. Areas) <br />Const 0.25 4' 4' <br />Vaf $_— –f <br />7171 77 <br />C< <br />Shoulder Grade <br />Backing (Exist) <br />Roadway <br />Exist SHOULDER DETAIL 1 <br />River Road <br />Sta. 10+20 to Sta. 15+00 (LT) <br />rm <br />GENERAL NOTES: <br />1. Placement of Asphalt Concrete shall not begin until Asphalt <br />Concrete used in Pavement Repair has been in place for 18 hours. <br />2. Shoulder Backing Material at all intersection radii shall recieve <br />Penetration Treatment at 0.25 gallon/square yard. Limits of the <br />Penetration Treatment work shall be confined to intersection radii <br />plus fifty feet (50') in each direction or to intersection conform. <br />3. Pavement reinforcing fabric shall be placed on leveled or prepared <br />surfacing on top of AC leveling course. <br />4. The Asphalt Concrete shall be placed as noted: <br />0.25' AC — One (1) 0.15' layer of Asphalt Concrete to placed <br />over 0.10' leveling course. <br />5. The Contractor shall conduct the Shoulder Backing operation so <br />as not to disrupt or obstruct any existing drainage. <br />6. The Contractor shall be responsible for adequately scheduling <br />inspection and testing of all facilities constructed under this contract. <br />All testing shall conform to the Standard Specifications. All re—testing <br />shall be paid by the Contractor. <br />7. Contractor shall scarify native soil adjacent to pavement at intersection <br />radii to a depth of 6" and blend Shoulder Backing materials prior to <br />compaction. Limits of this work shall be confined to intersection radii <br />plus 50 feet in each directions. Payment for blending shall be considered <br />as included in the price for Shoulder Backing. <br />0.15' Asphalt Concrete Overlay <br />Over 0.10' Asphalt Concrete Leveling Course <br />N rt <br />D P <br />O w <br />O <br />q- Const. <br />D N 11 / 12 N <br />N River Road N <br />--------------------- <br />0 <br />0 Existing Concrete Dike <br />;'R to Remain in place <br />BEGINNING OF PROJECT <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PR JECT ENGINEER <br />G. Xiong 05/10/2012 <br />Sta. 37+00 (Center) <br />Adjust existing monument <br />frame and cover to grade 7 L <br />Const. q- Const. <br />N 36 N N 63 <br />AM <br />N N N River Road <br />NO SCALE TYPICAL SECTION, GENERAL NOTES, <br />SHOULDER DETAIL, AND PLANS <br />DATE CHECKED <br />S Lo It _ - $ <br />DATE <br />s/10/4 <br />50't <br />A.C. Trans. (n 0 <br />00 <br />025'± a, o <br />W 3 <br />J <br />O O <br />O <br />I <br />R <br />END OF PROJECT <br />RIVER ROAD RESURFACING <br />(NORTH RIPON ROAD TO MURPHY ROAD) <br />Sheet No. <br />2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.