My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6020 - SP6023
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP6020 - SP6023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:53:59 PM
Creation date
8/22/2023 4:41:21 PM
Metadata
Fields
Template:
Small Plans - SP
Project
River Road Resurfacing
Limits
North Ripon Road to Murphy Road
Year
2012
Roads Worked
River Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP6020 - SP6023
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
h <br />0 <br />0 <br />C1 D <br />I 0 <br />D <br />0 0 <br />c <br />I r <br />N M <br />N <br />0 Z <br />cn D <br />0K <br />M <br />a <br />f <br />0 <br />D <br />M <br />PLANING ASPHALT CONCRETE <br />PAVEMENT <br />Location Quantity <br />Conforms 206 S.Y. <br />Total 206 S.Y. <br />ADJUST MONUMENT <br />FRAME AND COVER <br />Location Quantity <br />Sta. 37+00 (Center) 1 Each <br />Total 1 Each <br />SHOULDER BACKING <br />Location Quantity <br />Sta. 10+20 to 63+70 938 Tons <br />Total 938 Tons I <br />EARTHWORK <br />Location Quantity <br />Sta. 10+20 to 15+00 (LT) 5 Sta. <br />Total 5 Sta. <br />PENETRATION TREATMENT <br />Location Quantity <br />River Rd at North Ripon Rd 45 S.Y. <br />River Rd at Murphy Rd 90 S.Y. <br />Total 135 S.Y. <br />ASPHALT CONCRETE (TYPE B) <br />Location Quantity <br />Mainline (Overlay) 1,419 Tons <br />Mainline (Leveling) 1,466 Tons <br />Driveways 35 Tons <br />Pavement Repair 191 Tons <br />Total 3,111 Tons <br />PAVEMENT REINFORCING FABRIC <br />Location Quantity <br />N. Ripon Rd to Murphy Rd. 13,078 S.Y. <br />COUNTY <br />OF SAN <br />JOAQUIN <br />NO SCALE <br />DRAWN BY <br />DATE <br />P OJECT ENGINEER <br />DATE <br />G. Xiong <br />05/10/2012 <br />/ <br />s�1611z <br />Total 13,078 S.Y. I <br />SUMMARY OF QUANITITES <br />CHECKED <br />0 <br />DRIVEWAYS (TYPE D) <br />Location Quantity <br />7 Locations 90 S.Y. <br />Total 90 S.Y. <br />DRIVEWAYS (TYPE E) <br />Location Quantity <br />8 Locations 147 S.Y. <br />Total 147 S.Y. <br />PAVEMENT REPAIR <br />Location Quantity <br />Various Locations 572 S.Y. <br />Total 572 S.Y. <br />RIVER ROAD RESURFACING <br />(NORTH RIPON ROAD TO MURPHY ROAD) <br />DATE <br />Sheet No. <br />4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.