Laserfiche WebLink
h <br />0 <br />0 <br />C1 D <br />I 0 <br />D <br />0 0 <br />c <br />I r <br />N M <br />N <br />0 Z <br />cn D <br />0K <br />M <br />a <br />f <br />0 <br />D <br />M <br />PLANING ASPHALT CONCRETE <br />PAVEMENT <br />Location Quantity <br />Conforms 206 S.Y. <br />Total 206 S.Y. <br />ADJUST MONUMENT <br />FRAME AND COVER <br />Location Quantity <br />Sta. 37+00 (Center) 1 Each <br />Total 1 Each <br />SHOULDER BACKING <br />Location Quantity <br />Sta. 10+20 to 63+70 938 Tons <br />Total 938 Tons I <br />EARTHWORK <br />Location Quantity <br />Sta. 10+20 to 15+00 (LT) 5 Sta. <br />Total 5 Sta. <br />PENETRATION TREATMENT <br />Location Quantity <br />River Rd at North Ripon Rd 45 S.Y. <br />River Rd at Murphy Rd 90 S.Y. <br />Total 135 S.Y. <br />ASPHALT CONCRETE (TYPE B) <br />Location Quantity <br />Mainline (Overlay) 1,419 Tons <br />Mainline (Leveling) 1,466 Tons <br />Driveways 35 Tons <br />Pavement Repair 191 Tons <br />Total 3,111 Tons <br />PAVEMENT REINFORCING FABRIC <br />Location Quantity <br />N. Ripon Rd to Murphy Rd. 13,078 S.Y. <br />COUNTY <br />OF SAN <br />JOAQUIN <br />NO SCALE <br />DRAWN BY <br />DATE <br />P OJECT ENGINEER <br />DATE <br />G. Xiong <br />05/10/2012 <br />/ <br />s�1611z <br />Total 13,078 S.Y. I <br />SUMMARY OF QUANITITES <br />CHECKED <br />0 <br />DRIVEWAYS (TYPE D) <br />Location Quantity <br />7 Locations 90 S.Y. <br />Total 90 S.Y. <br />DRIVEWAYS (TYPE E) <br />Location Quantity <br />8 Locations 147 S.Y. <br />Total 147 S.Y. <br />PAVEMENT REPAIR <br />Location Quantity <br />Various Locations 572 S.Y. <br />Total 572 S.Y. <br />RIVER ROAD RESURFACING <br />(NORTH RIPON ROAD TO MURPHY ROAD) <br />DATE <br />Sheet No. <br />4 of 4 <br />