My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2302501 thru PS-2303000_ - PS-2302626
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2023
>
PS-2302501 thru PS-2303000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2302501 thru PS-2303000_ - PS-2302626
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2023 9:03:21 AM
Creation date
8/25/2023 8:59:25 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2302626
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2023
Notes2
W/S of Pock Ln. 250' S/O Carpenter Rd. & E/S of Pock Ln. 280' S/O Ninth St.
Address
12687 S. Manthey Rd., Lathrop,CA 95330
Application
Comcast/SEFNCO
Type
Traffic Control Devices
Supplemental fields
Cross Ref
PWP7110005
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br />ENCROACHMENT PERMIT <br />12. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />13. In addition to standard dust control measures, streets shall be maintained in a clean condition, <br />free of dirt, mud and debris during construction activities. The contractor shall provide daily, and <br />as determined to be necessary by County inspectors, street sweeping using a modern <br />mechanical or vacuum -assisted street sweeper. <br />14. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.