Laserfiche WebLink
ROADWAY EXCAVATION <br />Location Quantity (CY) <br />Sta 61 +48 to 62+15 Total 12.4 <br />SHOULDER BACKING <br />Location Quantity (TON) <br />Mainline 566 <br />Intersection Conform Areas 30 <br />Total 596 <br />EARTHWORK (ROADWAY WIDENING) <br />Location Quantity (STA) <br />Sta 56+00 to 61 +48 (Lt) 5.5 <br />Sto 53+75 to 61 +48 (Rt) 7.7 <br />Total 13.2 <br />PENETRATION TREATMENT <br />Location Quantity (SQYD) <br />6 Locations (Intersection Radii) Total 258 <br />DRIVEWAY (TYPE D) <br />Location Quantity (SQYD) <br />49 Locations Total 719 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER <br />Enrique Sifva 9/22 , <br />DRIVEWAY (TYPE E) <br />Location Quantity (SQYD) <br />19 Locations Total 452 <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON) <br />Mainline 1,998 <br />Driveways (Type D & E) 198 <br />Pavement Repair 35 <br />Tapered Edge 33 <br />Roadway Excavation 25 <br />Earthwork (Roadway Widening) 98 <br />Total 2,387 <br />COLD PLANE <br />PAVEMENT <br />Location <br />Quantity <br />(SQYD) <br />Sta 10+53 to <br />Sto 11 +28 <br />183 <br />Tulsa Avenue <br />Intersection <br />142 <br />Patton Avenue <br />Intersection <br />148 <br />Sibley Avenue <br />Intersection <br />164 <br />Total <br />637 <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />9 Locations Total 69 <br />NO SCALE I SUMMARY OF QUANTITIES <br />DATE I CHECKED I DATE <br />ADJUST FRAME AND COVER <br />(MONUMENT) <br />Location Quantity (EA) <br />Sta 50+40 Intersection Point with Sibley Ave 1 <br />'C ORV'! DRAV'VINC. <br />''.afffowns By <br />s " I <br />1,���, Facrtirn+r lf�v� l�i�a �nw+n� �n.c�1�i wrN1r <br />z::il :Mrr.•r*tian j4 icjsaowtlnq it%, Foe Of We"', <br />ADA AVENUE RESURFACING <br />(Patrick Road to East End) <br />Sheet No. <br />6 of 6 <br />