Laserfiche WebLink
TRANSFORMER DATA TABLE <br />TRANSFORMER INFORMATION PpiFORMATION FIELD CONSTRUCTION INPUT <br />TRFN COORDINATE N SIZE PRI. B SERIAL MANUFA DJRER DATE <br />HVA BUSH. w6 KVA. VOLTST13896 100000140322 750 6 3 650 77/480 <br />O3 I CABLE & PULLING DATA FOR ENCLOSURE r <br />TOTAL LENGTHS: FEEDER 1PH DIST. 3PH DIST. <br />LOC 2 1 3 1/OA EPRI 35 LBS 1 0.5 1 1 1 61' <br />PROPOSED QUADRANT DETAIL <br />LOS (1 3"PRI RISER <br />SAP IDN: 103366007 <br />GPS: 37.850543 <br />-121.108989 <br />SET 7.5 DEEP <br />IVRDSET S <br />35'/45'-4 <br />o <br />7 <br />:� <br />VICINITY MAP <br />NTS <br />F <br />120M PANT ,q, Br — 50 5 DO 30 <br />277/480 39 6 \ A229 <br />ESD: 61 /// 3-2AR 17KV <br />W. 4.631 'A' / R (STACKED) (60') 1 LOC 1 <br />SD: 12,000A/ J 45-5 <br />O $ SAP IDN: 1021 37MM <br />2-1000AL QPX IN � 330 S: R IN APPLUANT GP -121.1 <br />E: <br />APPLICANT 4-5• DUCTS INS.IIN, 4' O11CT <br />(120'/134') GDT -138966 <br />D-138966 <br />CONSTRUCTION NOTES 750 3E <br />- PG&E TO DESIGN, APPLICANT TO TRENCH 277/480 <br />AND INSTALL SUB -STRUCTURES <br />CONSTRUCTION NOTES LOC L J. <br />- RE FRAME PRIMARY TO CROSSARM <br />-POLE PASSED INSPECTION ON 1IM2010 <br />WITH 100% STRENGTH REMAINING. <br />-REMOVE OH TO BANK <br />-REMOVE SERVICE GOING TO LOC 2 <br />CONSTRUCTION NOTES LOC 2 <br />509 <br />- REPLACE POLE WITH 45DUE TO SLACK 40' 739 <br />45- LEGEND <br />SPAN PRIMARY BEING INSTALLED <br />-INSTALL 3 -FAR 17kV <br />- REMOVE SERMCE GOING TO METER INSTALL EXISTING DESCRIPTION <br />- INSTALL PRIMARY RISER In m 41 <br />CONSTRUCTION NOTES LOC 9 <br />m cououD/cvEl EaorAt <br />-INSTALL 3-1 UAL ERR IN APPLICANT 4" <br />CONDUIT u40, — P — INSTALL OH 3-2AR 17KV <br />CONSTRUCTION NOTES LOC 4 : — P1— INSTALL 3-1/04 EPR IN 1-4' DUCT <br />- INSTALL 75030 PADMOUNTED TO G <br />m I <br />CONSTRUCTION NOTES LOC 6 —w— INSTALL 2-100041. QPX IN 4-5' DUCT <br />W 40 <br />-- STALL2-1000AL QPX IN 45 APPLICANT X -E� SOLELY Dom POIf <br />CONDUIT R <br />R SFR <br />CONSTRUCTION NOTES LOC 8%%H <br />- IN STALL M ETER IN 1200A PAN EL �45' 45 525TMETER PANEL N <br />SECONDARY POINT OFCONTACT PALNJaINTn <br />IFADE, SU PERVISO R AND PR MARY ESTIMATOR ARE <br />UNAVAILABLE, CONTACT ADAM NEWELL ®(816)414 1121 N, )( FUSE <br />BETWEEN MAM& 3PM WEEKDAYS FOR IMMEDIATE SUPPORTPRIMARY . . <br />435-9563 <br />EST: BREE EVANS 9097 <br />LATITUDE, 37850545 17LONGTIUDEkV ]VOLT 121�.108785 CONSTRUCTION SKETCH ADE: GREGORY MCKERNAN 669212-0061 <br />SOURCE SIDE DEVICE: SWITCH 8993 POLE RERACEMENT, INSTALL OH CONDUCTOR, UG SVC, PAR T8 k REPLACE METER SUPV: KIMBERLY PAYNE (661)619-4871 <br />SUB & CIRCUIT. AVENA 1701 1 12739 MURPHY RD. ESCALON,CA REP:STEVEN MURPHY (209)726-6338 <br />DSGN SAG: RURAL RAPTOR ZONE: YES PLNR:N/A <br />LOADING AREA: EIGHT ARRESTER DISR3 Know whaYS Mlas. NO ENVIRONMENTAL NOTIR 124635075 JP N A <br />CORROSION AREA: NON INSULATION DIST:B CellbetoreMdl . ISSUES SCALE: NTS DATE: 02 24 2023 <br />BO•/ <br />Q <br />e_\ <br />aK <br />0 REMWABIE 13 N10 POST <br />•RXEO BM ER Po <br />:� <br />VICINITY MAP <br />NTS <br />F <br />120M PANT ,q, Br — 50 5 DO 30 <br />277/480 39 6 \ A229 <br />ESD: 61 /// 3-2AR 17KV <br />W. 4.631 'A' / R (STACKED) (60') 1 LOC 1 <br />SD: 12,000A/ J 45-5 <br />O $ SAP IDN: 1021 37MM <br />2-1000AL QPX IN � 330 S: R IN APPLUANT GP -121.1 <br />E: <br />APPLICANT 4-5• DUCTS INS.IIN, 4' O11CT <br />(120'/134') GDT -138966 <br />D-138966 <br />CONSTRUCTION NOTES 750 3E <br />- PG&E TO DESIGN, APPLICANT TO TRENCH 277/480 <br />AND INSTALL SUB -STRUCTURES <br />CONSTRUCTION NOTES LOC L J. <br />- RE FRAME PRIMARY TO CROSSARM <br />-POLE PASSED INSPECTION ON 1IM2010 <br />WITH 100% STRENGTH REMAINING. <br />-REMOVE OH TO BANK <br />-REMOVE SERVICE GOING TO LOC 2 <br />CONSTRUCTION NOTES LOC 2 <br />509 <br />- REPLACE POLE WITH 45DUE TO SLACK 40' 739 <br />45- LEGEND <br />SPAN PRIMARY BEING INSTALLED <br />-INSTALL 3 -FAR 17kV <br />- REMOVE SERMCE GOING TO METER INSTALL EXISTING DESCRIPTION <br />- INSTALL PRIMARY RISER In m 41 <br />CONSTRUCTION NOTES LOC 9 <br />m cououD/cvEl EaorAt <br />-INSTALL 3-1 UAL ERR IN APPLICANT 4" <br />CONDUIT u40, — P — INSTALL OH 3-2AR 17KV <br />CONSTRUCTION NOTES LOC 4 : — P1— INSTALL 3-1/04 EPR IN 1-4' DUCT <br />- INSTALL 75030 PADMOUNTED TO G <br />m I <br />CONSTRUCTION NOTES LOC 6 —w— INSTALL 2-100041. QPX IN 4-5' DUCT <br />W 40 <br />-- STALL2-1000AL QPX IN 45 APPLICANT X -E� SOLELY Dom POIf <br />CONDUIT R <br />R SFR <br />CONSTRUCTION NOTES LOC 8%%H <br />- IN STALL M ETER IN 1200A PAN EL �45' 45 525TMETER PANEL N <br />SECONDARY POINT OFCONTACT PALNJaINTn <br />IFADE, SU PERVISO R AND PR MARY ESTIMATOR ARE <br />UNAVAILABLE, CONTACT ADAM NEWELL ®(816)414 1121 N, )( FUSE <br />BETWEEN MAM& 3PM WEEKDAYS FOR IMMEDIATE SUPPORTPRIMARY . . <br />435-9563 <br />EST: BREE EVANS 9097 <br />LATITUDE, 37850545 17LONGTIUDEkV ]VOLT 121�.108785 CONSTRUCTION SKETCH ADE: GREGORY MCKERNAN 669212-0061 <br />SOURCE SIDE DEVICE: SWITCH 8993 POLE RERACEMENT, INSTALL OH CONDUCTOR, UG SVC, PAR T8 k REPLACE METER SUPV: KIMBERLY PAYNE (661)619-4871 <br />SUB & CIRCUIT. AVENA 1701 1 12739 MURPHY RD. ESCALON,CA REP:STEVEN MURPHY (209)726-6338 <br />DSGN SAG: RURAL RAPTOR ZONE: YES PLNR:N/A <br />LOADING AREA: EIGHT ARRESTER DISR3 Know whaYS Mlas. NO ENVIRONMENTAL NOTIR 124635075 JP N A <br />CORROSION AREA: NON INSULATION DIST:B CellbetoreMdl . ISSUES SCALE: NTS DATE: 02 24 2023 <br />