Laserfiche WebLink
CO UNTY OF SAN JOAQ UIN <br />DRAWN BY DATE PROJECT ENGIN EI <br />1— Aguilar 0611 <br />ADJUST FRAME AND COVER <br />(SSJID MAINTENANCE HOLE) <br />Location Quantity <br />Sta 30+63 ( 13' Right) 1 Each <br />Sta 109+52 ( 15' Left) 1 Each <br />Sta 128+08 ( 13' Left) 1 Each <br />Total 3 Each <br />SHOULDER BACKING <br />Location Quantity <br />Sta 10+36 to Sta 135+70 3,018 Ton <br />Total 3,018 Ton <br />DRIVEWAY (TYPE D) <br />Location Quantity <br />19 Locations Throughout 638 SQYD <br />Total 638 SQYD <br />DRIVEWAY (TYPE E) <br />Location Quantity <br />13 Locations Throughout 553 SQYD <br />Total 553 SQYD <br />PENETRATION TREATMENT <br />Location Quantity <br />@ Mariposa Road Intersection 200 SQYD <br />Total 200 SQYD <br />NO SCALE I SUMMARY OF QUANTITIES <br />DATE CHECKED BY DATE <br />ASPHALT CONCRETE (TYPE B) <br />Location Quantity <br />Mainline Resurfacing 5,482 Ton <br />Pavement Repair 207 Ton <br />Intersection 88 Ton <br />Driveways 181 Ton <br />12—INCH DIA CORRUGATED STEEL PIPE <br />(0.079" Thick) <br />Location Quantity <br />Sta 119+90 ( Right) 10 LF <br />Total 10 LF <br />24—INCH DIA CORRUGATED STEEL PIPE <br />(0.079" Thick) <br />Location Quantity <br />Sta 82+80 ( Right) 10 LF <br />Total 10 LF <br />DODDS ROAD RESURFACING <br />Mariposa Road to Escalon—Bellota Road <br />Sheet No. <br />7 of 7 <br />ADJUST FRAME AND COVER <br />(SSJID UTI LITY VAU LT) <br />Location <br />Quantity <br />Sta <br />12+80 <br />( Left) <br />1 Each <br />Sta <br />29+28 <br />( Left ) <br />1 Each <br />Sta <br />36+42 <br />( Left) <br />1 Each <br />Sta <br />96+56 <br />( Left) <br />1 Each <br />Sta <br />110+54 <br />( Left) <br />1 Each <br />Sta <br />126+14 <br />( Left) <br />1 Each <br />Sta <br />129+68 <br />( Right) <br />1 Each <br />36+42 <br />( 6' <br />Total <br />7 Each <br />CO UNTY OF SAN JOAQ UIN <br />DRAWN BY DATE PROJECT ENGIN EI <br />1— Aguilar 0611 <br />ADJUST FRAME AND COVER <br />(SSJID MAINTENANCE HOLE) <br />Location Quantity <br />Sta 30+63 ( 13' Right) 1 Each <br />Sta 109+52 ( 15' Left) 1 Each <br />Sta 128+08 ( 13' Left) 1 Each <br />Total 3 Each <br />SHOULDER BACKING <br />Location Quantity <br />Sta 10+36 to Sta 135+70 3,018 Ton <br />Total 3,018 Ton <br />DRIVEWAY (TYPE D) <br />Location Quantity <br />19 Locations Throughout 638 SQYD <br />Total 638 SQYD <br />DRIVEWAY (TYPE E) <br />Location Quantity <br />13 Locations Throughout 553 SQYD <br />Total 553 SQYD <br />PENETRATION TREATMENT <br />Location Quantity <br />@ Mariposa Road Intersection 200 SQYD <br />Total 200 SQYD <br />NO SCALE I SUMMARY OF QUANTITIES <br />DATE CHECKED BY DATE <br />ASPHALT CONCRETE (TYPE B) <br />Location Quantity <br />Mainline Resurfacing 5,482 Ton <br />Pavement Repair 207 Ton <br />Intersection 88 Ton <br />Driveways 181 Ton <br />12—INCH DIA CORRUGATED STEEL PIPE <br />(0.079" Thick) <br />Location Quantity <br />Sta 119+90 ( Right) 10 LF <br />Total 10 LF <br />24—INCH DIA CORRUGATED STEEL PIPE <br />(0.079" Thick) <br />Location Quantity <br />Sta 82+80 ( Right) 10 LF <br />Total 10 LF <br />DODDS ROAD RESURFACING <br />Mariposa Road to Escalon—Bellota Road <br />Sheet No. <br />7 of 7 <br />ADJUST FRAME <br />(SSJID <br />AND COVER <br />BOX) <br />Location <br />Quantity <br />Sta <br />12+80 <br />( 7' <br />Left) <br />1 <br />Each <br />Sta <br />29+28 <br />( 7' <br />Left) <br />1 <br />Each <br />Sta <br />30+63 <br />( 3' <br />Left) <br />1 <br />Each <br />Sta <br />36+39 <br />( 6' <br />Left) <br />1 <br />Each <br />Sta <br />36+42 <br />( 6' <br />Left) <br />1 <br />Each <br />Sta <br />58+26 <br />( 8' <br />Left) <br />1 <br />Each <br />Sta <br />78+33 <br />( 6' <br />Left) <br />1 <br />Each <br />Sta <br />96+46 <br />( 7' <br />Left) <br />1 <br />Each <br />Sta <br />96+67 <br />( 8' <br />Left) <br />1 <br />Each <br />Sta <br />109+52 <br />( 8' <br />Left) <br />1 <br />Each <br />Sta <br />110+54 <br />( 7' <br />Left) <br />1 <br />Each <br />Sto <br />126+10 <br />( 5' <br />Left) <br />1 <br />Each <br />Sta <br />126+14 <br />( 6' <br />Left ) <br />1 <br />Each <br />Sto <br />128+08 <br />( 9' <br />Left) <br />1 <br />Each <br />Sta <br />129+68 <br />( 5' <br />Left) <br />1 <br />Each <br />Sta <br />134+50 <br />( 7' <br />Left) <br />1 <br />Each <br />Total 16 <br />Each <br />CO UNTY OF SAN JOAQ UIN <br />DRAWN BY DATE PROJECT ENGIN EI <br />1— Aguilar 0611 <br />ADJUST FRAME AND COVER <br />(SSJID MAINTENANCE HOLE) <br />Location Quantity <br />Sta 30+63 ( 13' Right) 1 Each <br />Sta 109+52 ( 15' Left) 1 Each <br />Sta 128+08 ( 13' Left) 1 Each <br />Total 3 Each <br />SHOULDER BACKING <br />Location Quantity <br />Sta 10+36 to Sta 135+70 3,018 Ton <br />Total 3,018 Ton <br />DRIVEWAY (TYPE D) <br />Location Quantity <br />19 Locations Throughout 638 SQYD <br />Total 638 SQYD <br />DRIVEWAY (TYPE E) <br />Location Quantity <br />13 Locations Throughout 553 SQYD <br />Total 553 SQYD <br />PENETRATION TREATMENT <br />Location Quantity <br />@ Mariposa Road Intersection 200 SQYD <br />Total 200 SQYD <br />NO SCALE I SUMMARY OF QUANTITIES <br />DATE CHECKED BY DATE <br />ASPHALT CONCRETE (TYPE B) <br />Location Quantity <br />Mainline Resurfacing 5,482 Ton <br />Pavement Repair 207 Ton <br />Intersection 88 Ton <br />Driveways 181 Ton <br />12—INCH DIA CORRUGATED STEEL PIPE <br />(0.079" Thick) <br />Location Quantity <br />Sta 119+90 ( Right) 10 LF <br />Total 10 LF <br />24—INCH DIA CORRUGATED STEEL PIPE <br />(0.079" Thick) <br />Location Quantity <br />Sta 82+80 ( Right) 10 LF <br />Total 10 LF <br />DODDS ROAD RESURFACING <br />Mariposa Road to Escalon—Bellota Road <br />Sheet No. <br />7 of 7 <br />