My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP6040 - SP6046
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP6040 - SP6046
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:51:51 PM
Creation date
8/28/2023 9:42:34 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Dodds Road Resurfacing
Limits
Mariposa Road to Escalon-Bellota Road
Year
2012
Project Engineer
L. Aguilar
Roads Worked
Dodds Rd.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP6040 - SP6046
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CO UNTY OF SAN JOAQ UIN <br />DRAWN BY DATE PROJECT ENGIN EI <br />1— Aguilar 0611 <br />ADJUST FRAME AND COVER <br />(SSJID MAINTENANCE HOLE) <br />Location Quantity <br />Sta 30+63 ( 13' Right) 1 Each <br />Sta 109+52 ( 15' Left) 1 Each <br />Sta 128+08 ( 13' Left) 1 Each <br />Total 3 Each <br />SHOULDER BACKING <br />Location Quantity <br />Sta 10+36 to Sta 135+70 3,018 Ton <br />Total 3,018 Ton <br />DRIVEWAY (TYPE D) <br />Location Quantity <br />19 Locations Throughout 638 SQYD <br />Total 638 SQYD <br />DRIVEWAY (TYPE E) <br />Location Quantity <br />13 Locations Throughout 553 SQYD <br />Total 553 SQYD <br />PENETRATION TREATMENT <br />Location Quantity <br />@ Mariposa Road Intersection 200 SQYD <br />Total 200 SQYD <br />NO SCALE I SUMMARY OF QUANTITIES <br />DATE CHECKED BY DATE <br />ASPHALT CONCRETE (TYPE B) <br />Location Quantity <br />Mainline Resurfacing 5,482 Ton <br />Pavement Repair 207 Ton <br />Intersection 88 Ton <br />Driveways 181 Ton <br />12—INCH DIA CORRUGATED STEEL PIPE <br />(0.079" Thick) <br />Location Quantity <br />Sta 119+90 ( Right) 10 LF <br />Total 10 LF <br />24—INCH DIA CORRUGATED STEEL PIPE <br />(0.079" Thick) <br />Location Quantity <br />Sta 82+80 ( Right) 10 LF <br />Total 10 LF <br />DODDS ROAD RESURFACING <br />Mariposa Road to Escalon—Bellota Road <br />Sheet No. <br />7 of 7 <br />ADJUST FRAME AND COVER <br />(SSJID UTI LITY VAU LT) <br />Location <br />Quantity <br />Sta <br />12+80 <br />( Left) <br />1 Each <br />Sta <br />29+28 <br />( Left ) <br />1 Each <br />Sta <br />36+42 <br />( Left) <br />1 Each <br />Sta <br />96+56 <br />( Left) <br />1 Each <br />Sta <br />110+54 <br />( Left) <br />1 Each <br />Sta <br />126+14 <br />( Left) <br />1 Each <br />Sta <br />129+68 <br />( Right) <br />1 Each <br />36+42 <br />( 6' <br />Total <br />7 Each <br />CO UNTY OF SAN JOAQ UIN <br />DRAWN BY DATE PROJECT ENGIN EI <br />1— Aguilar 0611 <br />ADJUST FRAME AND COVER <br />(SSJID MAINTENANCE HOLE) <br />Location Quantity <br />Sta 30+63 ( 13' Right) 1 Each <br />Sta 109+52 ( 15' Left) 1 Each <br />Sta 128+08 ( 13' Left) 1 Each <br />Total 3 Each <br />SHOULDER BACKING <br />Location Quantity <br />Sta 10+36 to Sta 135+70 3,018 Ton <br />Total 3,018 Ton <br />DRIVEWAY (TYPE D) <br />Location Quantity <br />19 Locations Throughout 638 SQYD <br />Total 638 SQYD <br />DRIVEWAY (TYPE E) <br />Location Quantity <br />13 Locations Throughout 553 SQYD <br />Total 553 SQYD <br />PENETRATION TREATMENT <br />Location Quantity <br />@ Mariposa Road Intersection 200 SQYD <br />Total 200 SQYD <br />NO SCALE I SUMMARY OF QUANTITIES <br />DATE CHECKED BY DATE <br />ASPHALT CONCRETE (TYPE B) <br />Location Quantity <br />Mainline Resurfacing 5,482 Ton <br />Pavement Repair 207 Ton <br />Intersection 88 Ton <br />Driveways 181 Ton <br />12—INCH DIA CORRUGATED STEEL PIPE <br />(0.079" Thick) <br />Location Quantity <br />Sta 119+90 ( Right) 10 LF <br />Total 10 LF <br />24—INCH DIA CORRUGATED STEEL PIPE <br />(0.079" Thick) <br />Location Quantity <br />Sta 82+80 ( Right) 10 LF <br />Total 10 LF <br />DODDS ROAD RESURFACING <br />Mariposa Road to Escalon—Bellota Road <br />Sheet No. <br />7 of 7 <br />ADJUST FRAME <br />(SSJID <br />AND COVER <br />BOX) <br />Location <br />Quantity <br />Sta <br />12+80 <br />( 7' <br />Left) <br />1 <br />Each <br />Sta <br />29+28 <br />( 7' <br />Left) <br />1 <br />Each <br />Sta <br />30+63 <br />( 3' <br />Left) <br />1 <br />Each <br />Sta <br />36+39 <br />( 6' <br />Left) <br />1 <br />Each <br />Sta <br />36+42 <br />( 6' <br />Left) <br />1 <br />Each <br />Sta <br />58+26 <br />( 8' <br />Left) <br />1 <br />Each <br />Sta <br />78+33 <br />( 6' <br />Left) <br />1 <br />Each <br />Sta <br />96+46 <br />( 7' <br />Left) <br />1 <br />Each <br />Sta <br />96+67 <br />( 8' <br />Left) <br />1 <br />Each <br />Sta <br />109+52 <br />( 8' <br />Left) <br />1 <br />Each <br />Sta <br />110+54 <br />( 7' <br />Left) <br />1 <br />Each <br />Sto <br />126+10 <br />( 5' <br />Left) <br />1 <br />Each <br />Sta <br />126+14 <br />( 6' <br />Left ) <br />1 <br />Each <br />Sto <br />128+08 <br />( 9' <br />Left) <br />1 <br />Each <br />Sta <br />129+68 <br />( 5' <br />Left) <br />1 <br />Each <br />Sta <br />134+50 <br />( 7' <br />Left) <br />1 <br />Each <br />Total 16 <br />Each <br />CO UNTY OF SAN JOAQ UIN <br />DRAWN BY DATE PROJECT ENGIN EI <br />1— Aguilar 0611 <br />ADJUST FRAME AND COVER <br />(SSJID MAINTENANCE HOLE) <br />Location Quantity <br />Sta 30+63 ( 13' Right) 1 Each <br />Sta 109+52 ( 15' Left) 1 Each <br />Sta 128+08 ( 13' Left) 1 Each <br />Total 3 Each <br />SHOULDER BACKING <br />Location Quantity <br />Sta 10+36 to Sta 135+70 3,018 Ton <br />Total 3,018 Ton <br />DRIVEWAY (TYPE D) <br />Location Quantity <br />19 Locations Throughout 638 SQYD <br />Total 638 SQYD <br />DRIVEWAY (TYPE E) <br />Location Quantity <br />13 Locations Throughout 553 SQYD <br />Total 553 SQYD <br />PENETRATION TREATMENT <br />Location Quantity <br />@ Mariposa Road Intersection 200 SQYD <br />Total 200 SQYD <br />NO SCALE I SUMMARY OF QUANTITIES <br />DATE CHECKED BY DATE <br />ASPHALT CONCRETE (TYPE B) <br />Location Quantity <br />Mainline Resurfacing 5,482 Ton <br />Pavement Repair 207 Ton <br />Intersection 88 Ton <br />Driveways 181 Ton <br />12—INCH DIA CORRUGATED STEEL PIPE <br />(0.079" Thick) <br />Location Quantity <br />Sta 119+90 ( Right) 10 LF <br />Total 10 LF <br />24—INCH DIA CORRUGATED STEEL PIPE <br />(0.079" Thick) <br />Location Quantity <br />Sta 82+80 ( Right) 10 LF <br />Total 10 LF <br />DODDS ROAD RESURFACING <br />Mariposa Road to Escalon—Bellota Road <br />Sheet No. <br />7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.