GENERAL NOTES <br />1. One week prior to the start of work, the Contractor shall furnish to <br />the Engineer a schedule showing proposed street closures on each <br />half—day basis. No work shall commence until this schedule is <br />approved by the Engineer. <br />2. All intersection radii within project limits shall be sealed to lip of <br />existing curb and gutter or edge of pavement. <br />3. Before slurry seal is to be applied to any area, the Contractor shall <br />protect all utility covers, including but not limited to maintenance <br />holes, water valves, and survey monument frames and covers. <br />Contractor shall remove protective covers after slurry seal. Full <br />compensation shall be considered as included in unit price for slurry <br />seal. <br />4. Surface preparation work shall be as directed by the Engineer. <br />Locations and dimensions of pavement repair will be determined by <br />the Engineer and shall be in place for 18 hours prior to placing <br />slurry seal. <br />5. The Aggregate for Latex Modified Slurry Seal shall be Type Il. <br />6. The Contractor is to remove all existing Thermoplastic Traffic Stripes <br />and Pavement Markings in all areas. The cost for this work is to be <br />included in the contract prices paid for Remove Thermoplastic Traffic <br />Stripes and Pavement Markings item of work, and no additional <br />compensation will be allowed therefor. <br />7. Street sweeping will be performed routinely throughout the duration <br />of the slurry seal operations of the project per the specifications. <br />All streets to be slurry sealed will be swept immediately prior to the <br />application of the slurry seal coat. Twenty four (24) hours after the <br />application of the slurry seal coat, the areas will be swept again to <br />recover any loose aggregate from the area. Furthermore, sidewalks, <br />gutter pans/flow lines and streets will be cleaned and kept in order <br />throughout the duration of the project. Full compensation for these <br />sweeping operations shall be considered as included in the contract <br />unit price paid per square yard for Latex Modified Slurry Seal item <br />of work and no separate payment will be made therefor. <br />9. The Contractor shall obtain Encroachment Permits from the City of <br />Stockton and the City of Lodi for traffic control signage placed in <br />the cities' rights—of—way. Full compensation for obtaining <br />Encroachment Permits from the cities shall be included in the <br />various contract items of work and no separate payment will be <br />made therefor. <br />10. The Contractor shall not apply slurry seal coat on the brick inlay <br />crosswalk areas. All necessary precautions must be taken by the <br />Contractor to prevent any damage to the brick inlay crosswalks. In <br />the event that such damage should occur from the Contractor's <br />operations, the contractor shall repair or replace or bring to original <br />condition the damage brick inlay crosswalk at the contractor's <br />expense. <br />11. Areas in County right—of—way used by <br />Contractor for staging and/or <br />storage of materials shall be approved <br />by the Engineer. The areas <br />utitilized by the Contractor for staging <br />and/or storage of materials <br />shall be restored to its original condition. Any damages or unclean <br />condition to the staging or storage area <br />shall be repaired at the <br />Contractor's own expense. It shall be <br />the Contractor's responsibility <br />to obtain permission from the property <br />owner to stage equipment or <br />store materials on private property. The Contractor shall provide a <br />letter of release from the property owner <br />of the areas utilized for <br />staging and/or storage materials. <br />N 8. The Contractor shall perform roadway sweeping on all slurry sealed <br />roads fifteen (15) working days after application. Full compensation <br />A for this sweeping operation shall be considered as included in the <br />mcontract lump sum price paid for Finishing Roadway item of work and <br />no separate payment will be made therefor. <br />Z <br />0 <br />COUNTY OF SAN JOAQUIN NO SCALE GENERAL NOTES <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED _ DATE <br />D. Grl f f to 8112 r t' a ° <br />� (A d <br />RECORDDRAWING <br />Ccxredions By <br />' <br />No chertges a- <br />Date -74 71_ <br />Argy Persora 11-'nQ Thi* 0. &VW4d V"y <br />AN infor"tbr+ few ingoWing The !#e Of wrw-� <br />SLURRY SEAL 2012 <br />(Road Districts 1 and 4) <br />Sheet No. <br />3 of 8 <br />