Laserfiche WebLink
PAVEMENT REPAIR <br />Location Quantity <br />61 Locations 718 SY <br />(Throughout Project) <br />PLANING ASPHALT CONCRETE <br />PAVEMENT <br />Location <br />Acampo Road <br />Sta 10+16 to Sta 10+51 <br />Sta 57+15 to Sta 57+25 <br />Sta 57+55 to Sta 57+65 <br />Sta 100+36 to Sto 100+86 <br />Intersections <br />Center Street (Northern Leg) <br />Sycamore Street (Northern Leg) <br />Sycamore Street (Southern Leg) <br />Oak Street (Southern Leg) <br />East Street (Southern Leg) <br />N 99 Frontage Road (Northern Leg) <br />N 99 Frontage Road & Off Ramp <br />Hwy 99 On Ramp <br />253 SY <br />44 SY <br />44 SY <br />187 SY <br />65 SY <br />59 SY <br />53 SY <br />67 SY <br />52 SY <br />175 SY <br />178 SY <br />104 SY <br />Total 1,281 SY <br />RECOR DRAWING <br />Corrections By <br />No Changes By <br />Date ►2 4 <br />Any Person UWrV AM +goo„ ey � 0 <br />The $NoQfVj0* <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED <br />Cncent ce2i 02111 mo,! /L - 'AA.� 2 <br />f SEAL RANDOM CRACKS IN <br />I EXISTING SURFACING <br />Location <br />I Sta 44+00 to Sta 100+86 Lump Sum I <br />ADJUST FRAMES AND COVERS <br />(MONUMENT) <br />Location Quantity <br />Sto 23+50 (2' Rt) 1 Each <br />Sta 50+01 (11' Lt) 1 Each <br />Sta 76+37 (8' Rt) 1 Each <br />Total 3 Each <br />SHOULDER BACKING <br />Location Quantity <br />Sta 10+16 to Sta 100+86 910 Tons <br />DRIVEWAYS (TYPE D) <br />Location Quantity <br />11 Locations 126 SY <br />DRIVEWAYS (TYPE E) <br />Location Quantity <br />21 Locations 346 SY <br />PENETRATION TREATMENTS <br />Location Quantity <br />11 Locations 462 SY <br />ASPHALT CONCRETE (TYPE B) <br />Location Quantity <br />Mainline Resurfacing 2,655 Tons <br />Intersections 32 Tons <br />Pavement Repair 267 Tons <br />Driveways 60 Tons <br />Total 3,014 Tons <br />PAVEMENT REINFORCING FABRIC <br />Location Quantity <br />Sta 10+16 to Sta 44+75 6,918 SY <br />Sta 44+75 to Sta 100+86 13,716 SY <br />Total 20,634 SY <br />PLACE MONUMENT <br />ES AND COVERS <br />Location Quantity <br />Sta 63+20 (4' Rt) 1 Each <br />Sta 89+36 (3' Rt) 1 Each <br />Total <br />►JA vdrE To <br />NO SCALE SUMMARY OF QUANTITIES ACAMPO ROAD RESURFACING Sheet No. <br />(Lower Sacramento Road to State Highway Route 99) 1 7 of 7 <br />DATE <br />