My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4837- SP4844
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4710 - SP6054
>
SP4837- SP4844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 3:29:32 PM
Creation date
8/28/2023 2:04:45 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Liberty Road Resurfacing
Limits
Dry Creek Road to State Highway Route 88
Year
2011
Project Engineer
Vincent Li
Roads Worked
Liberty Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP4837 - SP4844
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const <br />Limits of Clearing and Grubbing <br />I <br />12' _ _ 12' <br />See Shoulder I See Shoulder <br />Details on 22' Pavement Reinforcing Fabric Details on <br />Sheet No. 3 I F-0.25' AC Overlay Sheet No. 3 <br />Var I j Var — <br />L------------- <br />---J <br />o <br />CD <br />TYPICAL SECTION <br />Existing Roadway <br />Sta 414+50 <br />to Sta 656+75 <br />RECORD DRAWING <br />N <br />Corrections By <br />o <br />o <br />No Changes By <br />Date /2 -6-// <br />o <br />GENERAL <br />NOTES <br />Any Person Using This Drawing Should Verify <br />�C <br />All information By inspectlne The 61t+s CM VVW* <br />A <br />a <br />m <br />1. <br />Shoulder Backing Material at all intersection radii shall receive penetration <br />7. Hand Grinding of Asphalt Concrete Pavement will be required at locations <br />treatment at 0.25 gallon/square yard. Limits of the penetration treatment <br />where survey monuments are within the planing limits. <br />ca <br />M <br />work shall be confined to the intersection radii plus fifty feet (50') in <br />Payment for Hand Grinding <br />shall be considered as included in the contract <br />each direction or to the intersection conform. <br />unit price paid for Planing <br />Asphalt Concrete Pavement. <br />CrCD <br />1-;C1- <br />2. <br />Asphalt concrete overlay shall be placed in 2 layers of approximately equal <br />8. The Contractor shall be responsible <br />for adequately scheduling inspection <br />thickness with pavement reinforcing fabric placed over existing pavement. <br />and testing of all facilities <br />constructed under this contract. <br />3. <br />All pavement repair must be completed 12 hours prior to placement of <br />All testing shall conform to <br />the Standard Specifications. <br />asphalt concrete overlay. <br />All re–testing shall be paid <br />by the Contractor. <br />CL <br />4. <br />Existing drainage facilities shall remain in place unless otherwise noted. <br />The Contractor shall conduct earthwork operations so as not to modify <br />9. The Contractor shall obtain an encroachment permit from Caltrans for the <br />installation of advance warning signs on State Highway 88. <br />or obstruct the existing drainage. <br />5. <br />All earthwork, except final grading of the shoulders, shall be completed <br />prior to placing final layer of asphalt concrete. No shoulder backing <br />i <br />ZE <br />shall be deposited or drifted onto the final lift of asphalt concrete surface. <br />6. <br />All existing trees, shrubs, fences, concrete walks and other frontage <br />r <br />improvements are to remain in place unless otherwise noted. <br />M <br />�z <br />0 <br />COUNTY OF SAN JOAQUIN <br />NO SCALE <br />TYPICAL SECTIONS AND <br />LIBERTY ROAD RESURFACING <br />Sheet No. <br />GENERAL NOTES <br />(Dry Creek Road to State Highway Route 88) <br />2 of 8 <br />DRAWN BY <br />DATE PROJECT ENGINEER DATE CHECKED DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.