Laserfiche WebLink
2 <br />REMOVING CONCRETE <br />Location Quantity <br />Sta 125+10 (Lt & Rt) 1 LS <br />PAVEMENT REPAIR <br />Location Quantity <br />69 Locations 493 SY <br />PLANING ASPHALT <br />CONCRETE PAVEMENT <br />Location Quantity <br />Sta <br />10+00 <br />to <br />Sta <br />10+25 <br />99 <br />SY <br />Sta <br />115+03 <br />to <br />Sta <br />115+28 <br />126 <br />SY <br />Sta <br />115+95 <br />to <br />Sta <br />116+20 <br />60 <br />SY <br />Sta <br />134+95 <br />to <br />Sta <br />135+25 <br />73 <br />SY <br />Sta <br />135+42 <br />to <br />Sta <br />135+72 <br />73 <br />SY <br />Robinson <br />Road <br />(North) <br />59 <br />SY <br />Sta <br />167+75 <br />to <br />Sta <br />168+00 <br />65 <br />SY <br />TOTAL <br />555 <br />SY <br />EARTHWORK (MISC AREAS) <br />'Location Quantity <br />Sta 133+25 to Sta 137+42 4 Sta <br />Sta 125+09 to Sta 125+18 1 Sta <br />TOTAL 5 Sta <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Clary/T. Callahan 03/11 D. Wang 03/11 <br />IMPORTED BORROW <br />Location Quantity <br />Sta 133+25 to Sta 137+42 267 CY <br />Sta 125+09 to Sta 125+18 26 CY <br />TOTAL 293 CY <br />SHOULDER BACKING <br />Location Quantity <br />Sta 10+00 to Sta 168+00 3,037 Tons <br />DRIVEWAYS <br />Type <br />Quantity <br />No. <br />Area <br />Driveways Type "D" <br />16 <br />310 SY <br />Driveways Type "E" <br />14 <br />430 SY <br />NO SCALE <br />CHECKED I DATE <br />D. Wang 03/11 <br />SUMMARY OF QUANTITIES <br />ASPHALT CONCRETE <br />PENETRATION TREATMENT <br />B) <br />Location <br />Quantity <br />Quantity <br />Sta. <br />10+00 to <br />10+80 (Lt & Rt) <br />74 <br />SY <br />Sta. <br />114+45 to <br />115+28 (Lt & Rt) <br />127 <br />SY <br />Sta. <br />140+72 to <br />141+50 (Lt) <br />73 <br />SY <br />Sta. <br />141+70 to <br />142+55 (Lt) <br />77 <br />SY <br />TOTAL <br />351 <br />SY <br />NO SCALE <br />CHECKED I DATE <br />D. Wang 03/11 <br />SUMMARY OF QUANTITIES <br />ASPHALT CONCRETE <br />(TYPE <br />B) <br />Location <br />Quantity <br />Mainline <br />3,825 <br />Tons <br />Driveways <br />105 <br />Tons <br />Pavement Repair <br />115 <br />Tons <br />Intersections <br />112 <br />Tons <br />DOTAL 4,157 Tons <br />e'eci� <br />it i 'brsnr <br />.i its t 11A <br />.- ASi 'HALT C;ONCRE-TE (TYPE B) <br />(LEVELING) <br />Location Quantity <br />Mainline 3,398 Tons <br />PAVEMENT REINFORCING FABRIC <br />Location Quantity <br />Sta 10+00 to Sta 168+00 34,813 SY <br />36" DIA REINFORCED <br />CONCRETE PIPE (CLASS III) <br />Location Quantity <br />Sta 125+10 (Lt 8 LF & Rt 8 LF) 1 LS <br />AVENA ROAD RESURFACING Sheet No. <br />MuriDhv Road to Van Allen Road) 1 7 of 7 <br />