Laserfiche WebLink
PAVEMENT REPAIR <br />Location Quantity <br />1 Location 109 S.Y. <br />PLANING ASPHALT <br />CONCRETE PAVEMENT <br />Location Quantity <br />Sto 31+92 to Sto 32+17 119 S.Y. <br />Sto 60+00 to Sto 60+75 78 S.Y. <br />TOTAL 197 S.Y. <br />SMOULDER BACKING <br />Location Quantity <br />Sto 10+00 to Sto 60+75 506 Tons <br />Total 506 Tons <br />DRIVEWAYS <br />Type <br />B) <br />Quantity <br />No. <br />Area <br />Driveways Type "D" <br />19 <br />201 S.Y. <br />Driveways Type "E" <br />23 <br />301 S.Y. <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />FELIPE RODRIGUEZ 3/28 joq//11 <br />PENETRATION TREATMENT <br />Location Quantity <br />Intersection <br />Patrick Rd. and Copperopolis Rd. 108 S.Y. <br />ASPHALT CONCRETE <br />(TYPE <br />B) <br />Location <br />Quantity <br />Mainline (Overlay) <br />774 <br />Tons <br />Mainline (Leveling) <br />943 <br />Tons <br />Driveways <br />76 <br />Tons <br />Pavement Repair <br />22 <br />Tons <br />CHECKED <br />ir" <br />TOTAL 1,815 Tons <br />SUMMARY OF <br />QUANTITIES <br />DATE <br />PATRICK ROAD RESURFACING <br />(South end to Ado Avenue) <br />Sheet No. <br />6 of 6 <br />