My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP4325 - SP4335
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP4146 - SP4609
>
SP4325 - SP4335
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2024 8:01:53 AM
Creation date
9/12/2023 3:00:47 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Calimyrna Road & Thornton Road Resurfacing
Limits
Woodson Road to North 99 Frontage Road (West) & Turner Road to Woodbridge Road
Year
2007
Project Engineer
Pnuon
Roads Worked
Calimyrna Rd., Thornton Rd.
Red Lines
No
Supplemental fields
Cross Ref
SP4325 - SP4335
DocCategory
Improvement Plans
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLEANING EXISTING DRAINAGE FACILITIES OBLITERATE SURFACING ASPHALT CONCRETE (TYPE B) <br />Location Quantity Location Quantity Location Quantity <br />Calimyrna Road -3 Locations (Throughout Project)LUMP SUM Calimyrna Road @ Woodson Road 230 S.Y. Calimyrna Road <br />Total 230 S.Y. Mainline 1,660 TONS <br />Driveways 202 TONS <br />Pavement Repair 396 TONS <br />PLANING ASPHALT CONCRETE PAVEMENT Intersections 155 TONS <br />SHOULDER BACKING A.C. Dike 2 TONS <br />Location Quantity Thornton <br />Calimyrna Road Location Quantity Driveways 54 TONS <br />Sta 11+00 to Sta 12+00 500 S.Y. Pavement Repair 424 TONSCalimyrnaRoad -Various Locations 1,117 TONS Intersections 190 TONSSta56+55 to Sta 57+55 270 S.Y. Thornton Road -Various Locations 1,463 TONS <br />Total 3,083 TONSIntersection@EuniceAvenue340S.Y.Total 2,580 TONS <br />Thornton Road <br />Sta 110+32 to Sta 111+32 390 S.Y. <br />Sta 163+54 to Sta 164+54 320 S.Y. <br />Intersection @ Woodbridge Road 430 S.Y. <br />DRIVEWAYSTYPED ASPHALT CONCRETE DIKE (TYPE A) <br />Total 2,250 S.Y. <br />Location No. Quantity <br />Location Quantity <br />a Calimyrna Road -Sta 11+04 to 11+34 70 L.F. <br />o m Calimyrna Road 27 720 S.Y. <br />Total 70 L.F.w <br />0 o ADJUST MONUMENT FRAME AND COVER Thornton Road 4 160S. <br />0 Location Quantity Total 880 S.Y. <br />0 -1U' <br />Calimyrna Road PAVEMENT REINFORCING FABRIC <br />rJ D @Eunice Avenue s/o Calimyma 1 EACH <br />Location Quantity1oThorntonRoad <br />n ,Sta 162+53 1 EACH DRIVEWAYS (TYPE E)Thornton Road -Sta 110+82 to Sta 164+04 13,600 S.Y. <br />C = m TOTAL 2 EACH Location No. Quantity Total 13,600 S.Y. <br />z <br />0 0 > Calimyrna Road 27 720 S.Y. <br />m <br />a <br />PAVEMENT REPAIR (0.4') <br />Thornton Road 4 160 S.Y. <br />PLACE MONUMENT FRAME AND COVERoTotal880S.Y. <br />T Location Quantity Location QuantityWO <br />N o Calimyrna Road -Various Locations 1,484 S.Y. Calimyrna Road - Sta 39+48 1 EACH <br />Total 1,484 S.Y. <br />TOTAL 1 EACHASPHALTCONCRETE (TYPE A) <br />Location Quantity <br />PAVEMENT REPAIR (0.5') Thornton Road - Mainline 2,730 TONS <br />Total 2,730 TONS <br />PAVEMENT REINFORCING MESH <br />o Location Quantity Location Quantity <br />Thornton Road -Various Locations 1,272 S.Y. Calimyma Road -Sta 11+50 to Sta 57+05 11,135 S.Y. <br />Total 1,272 S.Y. Total 11,135 S.Y. <br />M <br />M <br />z <br />0 <br />COUNTY OF SAN JOAQUIN NO SCALE SUMMARY OF QUANTITIES Calimyrna Road do Thornton Road Resurfacing Sheet No. <br />Woodson Road to North 99 Frontage Road (West) do Turner Road to Woodbridge Road) 11 Of 11 <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE <br />n_ <br />APPROVAL RECOMMENDED DATE
The URL can be used to link to this page
Your browser does not support the video tag.