Laserfiche WebLink
M <br />Do <br />r <br />m <br />z <br />0 <br />PLANING ASPHALT CONCRETE <br />PAVEMENT <br />Location Quantity (SQYD) <br />Sta 100+55 to Sta 101+30 176 <br />Sta 152+00 to Sta 152+75 183 <br />Total 359 <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />6 Locations <br />Tota 1 185 <br />EARTHWORK (MISC AREAS) <br />Location Quantity (STA) <br />Sta 103+50 to Sta 104+50 (Rt) 1 <br />Sta 106+00 to Sta 107+00 (Rt) 1 <br />Tota 1 2 <br />SHOULDER BACKING <br />Location Quantity (TON) <br />Sto 100+55 to Sta 152+75 (Lt) 608 <br />Sta 100+55 to Sta 152+75 (Rt) 442 <br />Total 1,050 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />N• NO 01/19 ;�,5.7T* � ¢ <br />DRIVEWAY (TYPE D) <br />Location Quantity (SQYD) <br />24 Locations Total 617 <br />DRIVEWAY (TYPE E) <br />Location Quantity (SQYD) <br />8 Locations Total 248 <br />HOT MIX ASPHALT (TYPE A) <br />Location Quantity (TON) <br />Mainline 1,937 <br />Tapered Edge 30 <br />Pavement Repair 62 <br />Driveways 154 <br />Tota 1 2,183 <br />GEOSYNTHETIC PAVEMENT INTERLAYER <br />(PAVING FABRIC) <br />Location Quantity (SQYD) <br />Sta 101+30 to Sta 152+00 Total 10,795 <br />NO SCALE <br />CHECKED <br />SUMMARY OF QUANTITIES <br />2 <br />DATE <br />ECSHO D <br />Oonedons <br />No CMnges� <br />[NO pawing <br />1f1� .gout WtMy <br />Any person Using The She 01 Wbrtc <br />AN Information By Inept <br />CURRY AVENUE RESURFACING <br />(Harney Lane to Kettleman Lane) <br />Sheet No. <br />5 of 5 <br />