My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7058 - SP7062
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6718 - SP7507
>
SP7058 - SP7062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 11:12:39 AM
Creation date
9/15/2023 1:33:30 PM
Metadata
Fields
Template:
Small Plans - SP
Project
Murphy Road Resurfacing
Limits
Lone Tree Road to Dodds Road
Year
2019
Project Engineer
Hadi Tabatabaee
Roads Worked
Murphy Rd.
Red Lines
Yes
Project #
221817
Districts
District 4
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7058 - SP7062
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1' 2' 2, EP <br />Grade Existing Shoulder <br />to place Tapered Edge, <br />1' minimum width (Typ) <br />Co st <br />Limits of Clearing and Grubbing <br />and Mailbox Relocation <br />21'23' <br />I <br />-- 20'-22' Geosynthetic Pavement Interlayer (Paving Fabric) <br />TE — 0.25' HMA Overlay Match I Match <br />TE <br />X30' Exist Slope Exist Slope <br />---'--------------------- <br />TYPICAL SECTION Roadway <br />Sta 10+12 to Sta 116!49 <br />— <br />117+03 <br />EP <br />2' 1 2' <br />-0.5' <br />E <br />L. <br />QW c <br />Variable Depth <br />Shoulder Backing (Typ) <br />RECOHO QRAWING <br />No Changan" <br />Date <br />GENERAL NOTES: VW Person Using This Drawing Should Verity <br />1, 0.25' HMA Overlay must be placed in two (2) layers of approximately equal thickness with Geosynthetic Pavement Interlayer All Intbrmat%n By Inspecting The Site Or Wce,- <br />(Paving Fabric) placed . ON TME Wffodl. <br />2. Placement of HMA Overlay must not begin until the HMA used in Pavement Repair has been in place for a minimum of 18 hours. <br />3. Placement of HMA Driveways must not begin until the HMA used for Mainline Paving has been completed. <br />4. Existing highway and utility facilities must remain in place unless otherwise noted. <br />5. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in place unless otherwise noted. <br />6. Existing drainage facilities must remain in place unless otherwise noted. The Contractor must conduct earthwork operations so as not to modify or <br />obstruct the existing drainage. <br />7. All Earthwork, except for final shoulder grading, must be completed prior to placing the final layer of HMA Pavement. No Shoulder Backing material <br />must be deposited or drifted on the final layer of HMA surfacing. Where the shoulder placement exceeds 0.50' in thickness, the Shoulder Backing <br />must be placed in two (2) or more fully compacted layers. <br />8. Shoulder Backing material at all intersections radii must receive Penetration Treatment at 0.25 GAL/SQYD. Limits of the Penetration Treatment work <br />l must be confined to intersection radii plus fifty feet (50') in each direction or to the intersection conform. <br />�J N 9. The Contractor will be responsible for adequately scheduling inspection and testing of all facilities constructed under this contract with a minimum <br />24 hours notice to the County. All testing must conform to the Standard Specifications. All re—testing will be paid by the Contractor. <br />0 10. The Contractor must exercise due caution and carefully preserve survey bench marks, control points, reference points and all survey stakes, and <br />must bear all expenses for replacement and/or errors caused by their unnecessary loss or disturbance. <br />C�:OUNTY OF SAN JOAQUIN I NO SCALE I TYPICAL SECTION AND I MURPHY ROAD RESURFACING <br />GENERAL NOTES (Lone Tree Road to Dodds Road) <br />DRAWN BY <br />DATE <br />0.5'- <br />E <br />0 <br />DATE <br />o� <br />var <br />Grade Existing Shoulder <br />to place Tapered Edge, <br />1' minimum width (Typ) <br />Co st <br />Limits of Clearing and Grubbing <br />and Mailbox Relocation <br />21'23' <br />I <br />-- 20'-22' Geosynthetic Pavement Interlayer (Paving Fabric) <br />TE — 0.25' HMA Overlay Match I Match <br />TE <br />X30' Exist Slope Exist Slope <br />---'--------------------- <br />TYPICAL SECTION Roadway <br />Sta 10+12 to Sta 116!49 <br />— <br />117+03 <br />EP <br />2' 1 2' <br />-0.5' <br />E <br />L. <br />QW c <br />Variable Depth <br />Shoulder Backing (Typ) <br />RECOHO QRAWING <br />No Changan" <br />Date <br />GENERAL NOTES: VW Person Using This Drawing Should Verity <br />1, 0.25' HMA Overlay must be placed in two (2) layers of approximately equal thickness with Geosynthetic Pavement Interlayer All Intbrmat%n By Inspecting The Site Or Wce,- <br />(Paving Fabric) placed . ON TME Wffodl. <br />2. Placement of HMA Overlay must not begin until the HMA used in Pavement Repair has been in place for a minimum of 18 hours. <br />3. Placement of HMA Driveways must not begin until the HMA used for Mainline Paving has been completed. <br />4. Existing highway and utility facilities must remain in place unless otherwise noted. <br />5. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in place unless otherwise noted. <br />6. Existing drainage facilities must remain in place unless otherwise noted. The Contractor must conduct earthwork operations so as not to modify or <br />obstruct the existing drainage. <br />7. All Earthwork, except for final shoulder grading, must be completed prior to placing the final layer of HMA Pavement. No Shoulder Backing material <br />must be deposited or drifted on the final layer of HMA surfacing. Where the shoulder placement exceeds 0.50' in thickness, the Shoulder Backing <br />must be placed in two (2) or more fully compacted layers. <br />8. Shoulder Backing material at all intersections radii must receive Penetration Treatment at 0.25 GAL/SQYD. Limits of the Penetration Treatment work <br />l must be confined to intersection radii plus fifty feet (50') in each direction or to the intersection conform. <br />�J N 9. The Contractor will be responsible for adequately scheduling inspection and testing of all facilities constructed under this contract with a minimum <br />24 hours notice to the County. All testing must conform to the Standard Specifications. All re—testing will be paid by the Contractor. <br />0 10. The Contractor must exercise due caution and carefully preserve survey bench marks, control points, reference points and all survey stakes, and <br />must bear all expenses for replacement and/or errors caused by their unnecessary loss or disturbance. <br />C�:OUNTY OF SAN JOAQUIN I NO SCALE I TYPICAL SECTION AND I MURPHY ROAD RESURFACING <br />GENERAL NOTES (Lone Tree Road to Dodds Road) <br />DRAWN BY <br />DATE <br />PROJECT ENGINEER DATE <br />CHECKED <br />DATE <br />Sheet No. <br />2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.