Laserfiche WebLink
GENERAL NOTES <br />1. The Contractor must obtain all permits required for the construction and completion of <br />the project, and must perform all work in accordance with the requirements and <br />conditions of all permits and approvals applicable to the project. <br />2. The Contractor must submit a temporary traffic control plan and sidewalk closure plan to <br />the Engineer for approval two weeks prior to construction. <br />3. Prior to commencing any work, it will be the Contractor's responsibility to have each <br />utility company locate in the field their main services lines and laterals. The Contractor <br />must notify members of the Underground Service Alert (U.S.A) 48 hours in advance of <br />performing excavation work by calling the toll free number (1-800-642-2444). <br />4. The Contractor must field verify all existing highway and utility facilities' locations and <br />depths. It will be the Contractor's sole responsibility to locate and protect all existing <br />highway and utility facilities, so that no damage results to them during the performance <br />of this contract. <br />5. Match new joint and score mark spacing to existing Crack Control Joints whenever <br />possible. <br />6. Existing highway and utility facilities must remain in place unless otherwise noted. <br />7. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in <br />place unless otherwise noted. <br />8. Existing drainage facilities must remain in place unless otherwise noted. The Contractor <br />must conduct earthwork operations so as not to modify or obstruct the existing drainage. <br />9. All Minor Concrete (Curb, Gutter & Sidewalk) work that is to be removed will be saw cut <br />or removed to the limits shown on the plans. The cost of saw cutting will be considered <br />as paid for under the various items of work involved. <br />10. All new Curb, Gutter and Sidewalk must conform to the existing flowline elevations with a <br />straight grade between conforms unless otherwise noted. <br />11. Install Expansion Joints at beginning and end of new Curb, Gutter and Sidewalk and <br />between new sidewalks and existing driveways. <br />12. Existing sprinkler systems, or portions thereof, will be maintained or protected during <br />construction operations. Any damage to the existing system must be repaired within 48 <br />hours at the Contractor's expense. Upon completion of the work, the Contractor must <br />restore the sprinkler system to its original condition. <br />13. The Contractor must perform all related work on streets where schools are situated, on <br />weekends or when school is not in session, unless allowed by written approval from the <br />Engineer. <br />14. Placement of temporary "No Parking" signs must be installed at a minimum of 24 hours <br />prior to work. Contractor is responsible for contacting adjacent property owner(s) to <br />arrange for access as necessary. <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE <br />Sergio Castaneda 02/19 <br />Northwest (NW) <br />Quadrant <br />i <br />Elf <br />G <br />M, <br />Face of <br />Curb <br />�\ n <br />Southwest (SW) I I BCR <br />Quadrant I I(—) <br />I II <br />Northeast (NE) <br />I I I Quadrant <br />d 7 na9Y <br />C Of <br />M <br />(+) (-) <br />Face of <br />Curb <br />BCR I I Southeast (SE) <br />Quadrant <br />NOTE: <br />Above is a directional guide to Sheet 4 through 6. <br />BCR is at the southernmost side of the <br />intersection. <br />HEC"OD D. <br />COrTsctions sy. �1 <br />NO Cahanges <br />Osie -- <br />Any Person U4 Z�t >/ <br />2,0 <br />All Iniormapon Lqw: „y <br />The ., 4.4 WVOrk <br />NO SCALE GENERAL NOTES AND SIDEWALK ACCESSIBILITY IMPROVEMENTS 2018-2019 <br />DIRECTIONAL GUIDE Various Locations in East Stockton, Mathews Rd., West Jackson <br />ENGINEER DATE CHECKED DATE <br />Sheet No. <br />2 of 8 <br />