Laserfiche WebLink
r <br />COi St CO/!St <br />Limits of Clearing and Grubbing Limits of Clearing and <br />EP and mailbox relocation. <br />EP relocation. <br />Grubbinand mailbox <br />1 1 T <br />2 2 1 1 2' 2' 1' I <br />1 0.5' Geos nthetic Pavement Interlayer(Paving Fabric 0.5' EP <br />Conform a Match Match a Conform I TE 1' <br />Grade gq, 30• Exist Slope I Exist Slope 30, 8q Exist Match Var <br />`Var Vvr� Grade Exist Slope Exist <br />' --- — ----� 30' _ Grade <br />Variable Depth L- — II _Exist Roadway_ _ _ _ _ _ _ _ _ _ _ _ <br />---———t— —Grade Exist Shoulder �-- <br />Shoulder Backing (Typ) 0.25' AC Overlay TYPICAL SECTION to place Taper Edge Exist <br />Std 11+17 to Sta 56+97 1' minimum width (Typ) Roadway <br />SHOULDER DETAIL 1 <br />COi St Sta 11+17 to Sta 20+28 (Rt) <br />Limits of Clearing and Grubbing and mailbox relocation. <br />HU LjhAkA11Nv <br />DITCH DETAIL Earthwork <br />I EP 3.4' to 5.2' (Misc Areas) Corrections ey��'�^'� <br />Sta 26+05 to Sta 27+12 (Rt) , TE Exist No Changes By. <br />Sta 28+01 to Sta 29+09 (Rt) I Match Var Fence Line Oats- �► ��_ <br />Exist Slope Exist o Any Person Using This Drawing Should Verity <br />Sta 36+70 to Sta 37+78 (Rt) P 30• Grade I � <br />Sta 39+01 to Sta 40+08 (Rt) v 2 2 2 Var 1't All inti.- -',-- cting The Site Of work <br />Sta 46+49 to Sta 47+53 (Rt) — — -- — — Place a quantity of 0.5f CY of Rock Slope <br />Conform Protection (Facing Method B) Standard Specification <br />i Sec. 72-2. Payment for this work to be included in <br />Exist 0'-1' the 12" Corrugated Steel Pipe (0.079" Thick) bid item <br />Roadway R & R Exist pipe. 0 5, of work. <br />GENERAL NOTES: (See plans for details) <br />1. 0.25' HMA Overlay must be placed in two (2) layers of approximately equal thickness 8. Shoulder Backing material at all intersections radii must receive Penetration Treatment <br />with Geosynthetic Pavement Interlayer (Paving Fabric) placed on the exist or prepared at 0.25 GAL/SQYD. Limits of the Penetration Treatment work must be confined to <br />surface. intersection radii plus fifty feet (50') in each direction or to the intersection conform. <br />2. Placement of HMA Overlay must not begin until the HMA used in Pavement Repair has 9. The Contractor will be responsible for adequately scheduling inspection and testing of <br />been in place for a minimum of 18 hours. all facilities constructed under this contract with a minimum 24 hours notice to the <br />3. Placement of HMA Driveways must not begin until the HMA used for Mainline Paving has County. All testing must conform to the Standard Specifications. All re—testing will be <br />been completed. paid by the Contractor. <br />4. Exist highway and utility facilities must remain in place unless otherwise noted. 10. The Contractor must exercise due caution and carefully preserve survey bench marks, <br />5. Exist trees, shrubs, fences, mailboxes and other frontage improvements must remain in control points, reference points and all survey stakes, and must bear all expenses for <br />cn place unless otherwise noted. replacement and/or errors caused by their unnecessary loss or disturbance. <br />The Contractor must enter into an Agreement with the CTCC Railroad for any work <br />6. Exist drainage facilities must remain in place unless otherwise noted. The Contractor 11. within the Railroad's ri ht—of—wa See Section 5-1.02C, "Railroad Relations" of the <br />WX must conduct earthwork operations so as not to modify or obstruct the exist g y <br />mdrainage unless otherwise shown on plans. Specifications for further details. <br />Qy7. All Earthwork, except for final shoulder grading, must be completed prior to placing <br />the final layer of HMA Pavement. No Shoulder Backing material must be deposited or <br />M drifted on the final layer of HMA surfacing. Where the shoulder placement exceeds <br />0 0.50' in thickness, the Shoulder Backing must be placed in two (2) or more fully <br />compacted lavers. <br />COUNTY OF SAN JOA UIN <br />Q <br />NO SCALE <br />TYPICAL <br />AND <br />SECTION, GENERAL NOTES <br />CONSTRUCTION DETAILS <br />FOPPIANO LANE RESURFACING <br />(100' E/0 N 99 FRONTAGE RD (E) TO CCTC RR) <br />Sheet No. <br />2 of 8 <br />DRAWN BY <br />DATE <br />PROJECT ENGINEER <br />DATE <br />DATE <br />CMZ Ct"illiams�n <br />06/19 <br />c'CHHECKED <br />