My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7143 - SP7148
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6718 - SP7507
>
SP7143 - SP7148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 11:16:46 AM
Creation date
9/18/2023 11:28:53 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Henry Road Resurfacing
Limits
Santa Fe Road to Orange Avenue
Year
2019
Project Engineer
Dan Gambini
Roads Worked
Henry Rd.
Red Lines
Yes
Project #
221812
Districts
District 4
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7143 - SP7148
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br />CO/!St <br />Limits of Clearing and Grubbing! and Mailbox Relocation <br />Shoulder Details EP 9'-12' Limits of !HMA Overlay 9'-12' <br />Sheet No. 5 <br />TE 0.5' _ _ 17'-23' <br />Var Geosynthetic Pavement I Interlayer (Paving Fabric) <br />i <br />/30. Match_ Existing Slope Match Existing Slope <br />11v1' 77 <br />0.5' <br />I� <br />----- —+-------------------- <br />---- -- <br />0. HMA <br />ay Existing Roadway <br />HMA Overlay <br />TYPICAL <br />Sta <br />NOTES: <br />0.25' HMA Overlay must be placed in two (2) layers of approximately equal thickness 9. <br />SECTION <br />90+59 <br />10+16 <br />to <br />Sta <br />o Sta <br />91+10 <br />to <br />Sta <br />104+25—No Tapered Edge <br />EP See Shoulder Details <br />Sheet No. 5 <br />A <br />TE <br />Var <br />Existing <br />Surface T <br />LGrade Existing Shoulder <br />to place Tapered Edge <br />1' minimum width (Typ) <br />GENERAL <br />1. <br />NOTES: <br />0.25' HMA Overlay must be placed in two (2) layers of approximately equal thickness 9. <br />Shoulder Backing material at all intersections radii must receive Penetration Treatment <br />with Geosynthetic Pavement Interlayer (Paving Fabric) placed on the existing surface. <br />at 0.25 GAL/SQYD. Limits of the Penetration Treatment work must be confined to <br />0.17' HMA Overlay must be placed in one (1) layer with Geosynthetic Pavement Interlayer <br />intersection radii plus fifty feet (50') in each direction or to the intersection conform. <br />(Paving Fabric) placed on the existing surface. 10. <br />The Contractor will be responsible for adequately scheduling inspection and testing of <br />2. <br />Placement of HMA Overlay must not begin until the HMA used in Pavement Repair <br />all facilities constructed under this contract with a minimum 24 hour notice to the <br />has been in place for a minimum of 18 hours. <br />County. All testing must conform to the Standard Specifications. All re—testing will <br />3. <br />Placement of HMA Driveways must not begin until the HMA used for Mainline Paving <br />be paid by the Contractor. <br />has been completed. 11. <br />Hand grinding of AC pavement will be required at locations where existing highway and <br />4. <br />Existing highway and utility facilities must remain in place unless otherwise noted. <br />utility facilities are within the Planing AC and Pavement Repair limits. Payment for hand <br />grinding must be considered as included in the contract unit price paid for Planing <br />5. <br />Existing trees, shrubs, fences, mailboxes and other frontage improvements must <br />AC Pavement. <br />remain in place unless otherwise noted. 12. <br />The Contractor must exercise due caution and carefully preserve survey bench marks, <br />6. <br />Existing drainage facilities must remain in place unless otherwise noted. The <br />control points, reference points and all survey stakes and must bear all expenses for <br />Contractor must conduct earthwork operations so as not to modify or obstruct the <br />replacement and/or errors caused by their unnecessary loss or disturbance. <br />existing drainage. 13. <br />The Contractor must exercise extreme caution when performing work near the PG&E high <br />7. <br />Contractor must inspect the existing bridge deck (29C-317) with the Engineer prior <br />pressure transmission gas line running parallel to the roadway along the northbound lane. <br />to conducting the planing/AC removal operations and must not damage the bridge <br />Refer to the Plan pages 3 and 4 for location. The Contractor must notify members of <br />deck concrete during the removal of the existing AC. Payment for AC removal from <br />the Underground Service Alert (U.S.A.) 48 hours in advance of performing any excavation <br />the bridge deck must be considered as included in the contract unit price paid for <br />work by calling the toll free number (1-800-642-2444) or 811. <br />Planing AC Pavement. <br />CORD <br />8. <br />All Earthwork, except for final shoulder grading, must be completed prior to placing the <br />final layer of HMA Pavement. No Shoulder Backing material must be deposited or <br />corrections By <br />drifted on the final layer of HMA surfacing. Where the shoulder placement exceeds <br />No Changep Bar r al vs, r-9 <br />0.50' in thickness, the Shoulder Backing must be placed in two (2) or more fully <br />Sate 1Z' •G//q <br />compacted layers. <br />Any Person Using This Drawing Should ' <br />COUNTY OF SAN JOA UIN <br />Q <br />NO SCALE <br />TYPICAL SECTION AND <br />HENRY ROAD RESURFACING <br />Sheet No. <br />GENERAL NOTES <br />(Santa Fe Road to Orange Avenue) <br />2 of 6 <br />DRAWN BY <br />DATE <br />PROJECT ENGINEER <br />DATE <br />CHECKED <br />DATE <br />Dan y'am6ini <br />512019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.