Laserfiche WebLink
PLANING <br />ASPHALT CONCRETE PAVEMENT <br />Location <br />Location <br />Quantity (SQYD) <br />Henry <br />Sta <br />Lee <br />Road <br />10+16 <br />Avenue <br />Conform <br />to Sta 11+17 <br />782 <br />Sta <br />10+12 <br />at Henry Road <br />to Sta 10+87 <br />232 <br />Hall <br />Road at <br />Henry Road <br />Sta <br />Sta <br />9+13 to Sta 9+88 (W) <br />188 <br />Sta <br />River <br />10+12 <br />Road <br />to Sta 10+87 (E) <br />(W) Henry Road <br />271 <br />Sta <br />at <br />9+13 to Sta 9+88 <br />448 <br />Henry <br />Road <br />approaching Bridge Deck <br />(Rt) <br />Sta <br />89+56 <br />to Sta 90+16 <br />162 <br />Henry <br />Road <br />on Bridge Deck 29C-317 <br />7.00 <br />Sta <br />Hennr <br />90+16 <br />Road <br />to Sta 90+59 <br />River <br />115 <br />Road (E) <br />Sta <br />91 +10 <br />north side of <br />to Sta 91 +60 <br />206 <br />Henry <br />Road <br />near Orange Avenue <br />a-eff <br />Sto <br />103+75 to Sta 104+25 <br />135 <br />60 <br />River Rod <br />Z.00 <br />Total 2 539 <br />REMOVE ASPHALT CONCRETE DIKES <br />Location Quantity (LF) <br />Henry Road at Santa Fe Road <br />Sta 10+43 to Sta 11 +56 (Lt) 70 <br />Sta 10+28 to Sta 11+01 (Rt) 120 <br />Total 190 <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />Throughout Project Limits Total 100 <br />ADJUST FRAME AND COVER (MONUMENT) <br />Location Quantity (EA) <br />Sta 11+32 (9' Rt) 1 <br />Sta 21+83 (CL) 1 <br />Sta 38+34 (2' Rt) 1 <br />Sta 53+29 (2' Rt) 1 <br />Sta 64+82 (0.5' Lt) 1 <br />Sta 91+59 (12' Lt) 1 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER DATE <br />Dan jcam&i zi 512019 � � G/Sb9 <br />EARTHWORK <br />(MISCELLANEOUS AREAS) <br />TREATMENT <br />Location <br />Location <br />Quantity <br />Quantity <br />(STA) <br />TYPE 1 <br />Sta 31 +70 to <br />Sta <br />33+40 <br />(Lt) <br />(Northwest) <br />1.70 <br />Sta 66+75 to <br />Sta <br />67+40 <br />(Rt) <br />116 <br />0.65 <br />Sta 67+60 to <br />Sta <br />70+45 <br />(Rt) <br />2.85 <br />Sta 78+20 to <br />Sta <br />80+00 <br />(Rt) <br />Hall Road <br />1.80 <br />(West) <br />Intersection <br />(Southwest) <br />Type 1 Total <br />7.00 <br />TYPE 2 ,fACO-35 <br />-Y, <br />54 6zfI5 <br />58 <br />Hall Road <br />,.ao <br />Sta 10+43 to <br />Sta <br />11 +65 <br />(Lt) <br />Type 2 Total <br />a-eff <br />(around inside <br />radius) <br />Total <br />60 <br />River Rod <br />Z.00 <br />TYPE 3 <br />Intersection(Southwest) <br />53 <br />Sta 94+00 to <br />Sta <br />98+00 <br />(Lt) <br />Road <br />4.00 <br />Sta 95+50 to <br />Sta <br />98+50 <br />(Rt) <br />3.00 <br />Intersection <br />(East) <br />64 <br />Type 3 Total <br />7.00 <br />ote: Project Total 15.00 <br />II Earthwork (Miscellaneous Areas) <br />re paid the same rate per station. <br />SHOULDER BACKING <br />Location Quantity (TON) <br />Sta 10+16 to Sta 90+16 998 <br />Sta 91 +10 to Sta 104+25 406 <br />Total 1,404 <br />DRIVEWAY (TYPE D) <br />Location Quantity (SQYD) <br />12 Locations Total 329 <br />DRIVEWAY (TYPE E) <br />Location Quantity (SQYD) <br />42 Locations Total 1,218 <br />GEOSYNTHETIC PAVEMENT INTERLAYER <br />(PAVING FABRIC) <br />Location Quantity (SQYD) <br />Sta 11+17 to Sta 89+56 20,263 <br />Sta 91 +61 to Sta 103+75 2,513 <br />Total 22,776 <br />NO SCALE SUMMARY OF QUANTITIES <br />CHECKED DATE <br />HOT MIX <br />PENETRATION <br />TREATMENT <br />Location <br />Quantity <br />(SQYD) <br />Henry Road <br />at Santa Fe <br />Road <br />Intersection <br />(Northwest) <br />112 <br />Intersection <br />(Northeast) <br />116 <br />Lee Avenue at Henry Road <br />104+25 <br />Intersection <br />(Southeast) <br />62 <br />Intersection <br />(Northeast) <br />61 <br />Hall Road <br />at Henry Road <br />(West) <br />Intersection <br />(Southwest) <br />56 <br />Intersection <br />(Northwest) <br />58 <br />Hall Road <br />at Henry Road <br />(East) <br />130 <br />Intersection <br />(Southeast) <br />64 <br />Intersection <br />(Northeast) <br />Total <br />60 <br />River Rod <br />pt Road <br />(West) <br />Intersection(Southwest) <br />53 <br />Intersection <br />(Northwest) <br />53 <br />Road <br />North side of <br />River Road (East) <br />Intersection <br />West <br />67 <br />Intersection <br />(East) <br />64 <br />HOT MIX <br />ASPHALT <br />(TYPE A) <br />Location <br />Quantity <br />(TON) <br />Mainline Paving <br />Sta 10+16 to Sta <br />90+59 <br />3,575 <br />Sta 91 +10 to Sta <br />Tapered Edae <br />104+25 <br />337 <br />Sta 10+16 to Sta <br />104+25 <br />83 <br />Cross Street Conforms <br />See Plans for Locations <br />190 <br />Driveway (Type D) <br />12 Locations <br />72 <br />Driveway (Type E) <br />42 Locations <br />Pavement Rem <br />130 <br />Throughout Project <br />Limits <br />33 <br />Total <br />4,420 <br />RECORD <br />Corrections By. <br />No Change By R <br />Date 36 Z , <br />Any Person Using This Drawing Should Y <br />All Information By Inspecting The Site Cf <br />HENRY ROAD RESURFACING <br />(Santa Fe Road to Orange Avenue) <br />Sheet No. <br />6 of 6 <br />