Laserfiche WebLink
Y <br />0017SI <br />Limits of Clearing and Grubbing <br />R R��% (', 1' 'k 4' 2' E 12' and mailbox relocation. 12' E 2' 4' 1' <br />REC`D D " `� • INu Geos thetic Pavement Interlayer (Paving Fabric 0 <br />E Va r 0.5 Yn Y ( 9 ) 0.5 Va o <br />no o TE0.25' HMA OverlayAny <br />o <br />Deb7 Var 8 Match Exist Slope Match Exist Slopes 89' Va 3 Surface Exist <br />/A 7 77 77 77 77 77 771 — <br />At inion._ .� � erspoctiny Thi Bib Of 1Noft — -- \ L — — _ Exist Roadway 7+7 <br />*See Sheet 6Earthwork (Misc Areas) Detail Variable Depth TYPICAL SExist Shoulder <br />Shoulder Backing (Typ) Sta 10+05 to Sta 61 +90 pace TE <br />Sta 69+88 to Sta 104+15 1' minimum width (Typ) <br />00175t <br />I <br />Limits of Clearing and Grubbing <br />EP and mailbox relocation. EP <br />1' Earthwork (Misc Areas) 16' 16' 2' 2' 1' <br />E 3' 3' 0.5' Geosynthetic Pavement Interlayer (Paving Fabric) 0.5' <br />o Var Va o <br />C: TE / —0.25' HMA Overlay TE o <br />Match Exist Slope 87 3 <br />Match Exist Slope dor <br />7727�Surface Exist <br />`—I Exist Roadway J � <br />0.50 t _TYPICAL SECTION Variable Depth <br />Grade Exist Shoulder to place Shoulder Backing <br />Sta 61+90 to Sta 69+88 TE 1' minimum width (Typ) <br />GENERAL NOTES: <br />1. 0.25' HMA Overlay must be placed in two (2) layers of approximately equal thickness with Geosynthetic Pavement Interlayer (Paving Fabric) placed on the existing or prepared surface. <br />2. Placement of HMA Overlay must not begin until the HMA used in Pavement Repair has been in place for a minimum of 18 hours. <br />3. Placement of HMA Driveways must not begin until the HMA used for Mainline Paving has been completed. <br />4. Existing highway and utility facilities must remain in place unless otherwise noted. <br />5. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in place unless otherwise noted. <br />6. Existing drainage facilities must remain in place unless otherwise noted. The Contractor must conduct earthwork operations so as not to modify or obstruct the existing drainage <br />unless otherwise shown on plans. <br />7. All Earthwork, except for final shoulder grading, must be completed prior to placing the final layer of HMA Pavement. No Shoulder Backing material will be deposited or drifted <br />-a <br />on the final layer of HMA surfacing. Where the shoulder placement exceeds 0.50' in thickness, the Shoulder Backing must be placed in two (2) or more fully compacted layers. <br />D 8. Shoulder Backing material at all intersection radii must receive Penetration Treatment at 0.25 gallon/square yard. Limits of the Penetration Treatment work must be confined to <br />Mintersection radii plus fifty feet (50') in each direction or to the intersection conform. <br />9. The Contractor will be responsible for adequately scheduling inspection and testing of all facilities constructed under this contract with a minimum 24 hour notice to the County. <br />All testing must conform to the Standard Specifications. All re—testing will be paid by the Contractor. <br />M 10. The Contractor must exercise due caution and carefully preserve survey bench marks, control points, reference points and all survey stakes, and must <br />z <br />o bear all expenses for replacement and/or errors caused by their unnecessary loss or disturbance. <br />COUNTY OF SAN JOAQUIN NO SCALE TYPICAL SECTIONS AND KASSON ROAD RESURFACING Sheet No. <br />GENERAL NOTES (Stanislaus County Line to Airport Way) 2 of 8 <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE <br />A. Fefk 06/2019 <br />