Laserfiche WebLink
Cal_foneiialIhUTCD 2014 K-didon Page 1117 <br />(F11WA's MUTCD 2009 Edition, including Revisions 1 ,L 2, as amended for use in California) <br />Table 6F-101(CA). Maximum S6acina of ChannAllAnn nevteec <br />Speed <br />(mph) <br />Maximum Channelizing Devices Spacing <br />Taper` <br />(feet} <br />Tangent <br />feet <br />Conflict" <br />feet <br />20 <br />20 <br />40 <br />10 <br />25 <br />25 <br />50 <br />12 <br />30 <br />30 <br />60 <br />15 <br />35 <br />35 <br />70 <br />17 <br />40 <br />40 <br />80 <br />20 <br />45 <br />45 <br />g0 <br />22 <br />50 <br />50 <br />100 <br />25 <br />55 <br />50 <br />100 <br />25 <br />60 <br />50 <br />100 <br />25 <br />65 <br />50 <br />100 <br />25 <br />70 <br />50 <br />100 <br />25 <br />75 <br />50 <br />100 <br />25 <br />Maximum channelizing device spacing for all speeds on one-laneftwo-way tapers is <br />20 feet. <br />Maximum channelizing device spacing for all speeds on downstream tapers is 20 <br />feet. <br />All other tapers are as shown. <br />" Use on intermediate and short -tern projects for taper and tangent sectin where <br />there are no pavement markings or where there is a conflict between existing <br />pavement markings and channelizing devices. <br />Chapter 6F — Temporary T7affrc Control Zone Devices November 7, 2014 <br />Part 6 — Temporary Traffic Control <br />