Laserfiche WebLink
Tidewater Phase 1 - Building A -D 1 51. RES SCHEDULE MEETING I 06 -Jun -23 13:26 <br />• — 1 • • • • <br />1 <br />I I I I I I I I I I I I I I I I I I I I I I I I I I I <br />I I I I I I I I I I I I I <br />Project Summary <br />441 27 -Sep -21 A <br />09 -Aug -23 <br />11680.00.R.1 <br />11680.00.R.1.6 Owner Subs <br />Pour Retaining Curb - Yocom <br />5 08 -Jun -23* <br />14 -Jun -23 <br />Pour Retaining urb YoCom <br />11680.00.R.1.1 Grading7777 <br />AB @Gas tie in <br />2 15 -Jun -23* <br />16 -Jun -23 <br />AB'@C#as tie in <br />11680.00.R.1.3 Concrete <br />Form and Pour Fire Access DWY <br />2119 -Jun -23 <br />20 -Jun -23 <br />Form and Pour Fire Access DWY ' <br />R&R Conic <br />R&R Concrete Around Buildings- PENDING 8 03 -Jul -23* 13 -Jul -23 <br />11680.00.R.1.5 Paving <br />Pave @ Gas Tied <br />1 21 -Jun -23 <br />21 -Jun -23 <br />Pave @' Gay Tie' -In <br />Raise Iron @ Gas Tied <br />1 22 -Jun -23* <br />22 -Jun -23 <br />Raise Irbn Q Ga's Tied <br />11680.00.R.7.3 Construction Activities <br />11 680.00.R.7.3.3 Stage 1 - SIB Airport <br />et, Median K Rail/dose NB Phase 1 <br />Grihd/Repair SS/,Grade NB Phase, 1 <br />,, Repair SS Trenchlines <br />ull Closure-Phasa 2 <br />Install Cathodic <br />Repair $ewer Manholes $B -phase 3, <br />Phase 3' <br />Install 18" Culvert <br />TV Utilities <br />Epoxy Goat SSMH's- UB Mason Pain;ting', <br />Overlay Airport S3 Lanes <br />Stripe Roadway <br />Set Median KRail/Close NB Phase 1 <br />3 14 -Jun -23 16 -Jun -23 <br />Grind/Repair SS/Grade NB Phase 1 <br />3 14 -Jun -23* 16 -Jun -23 <br />Repair SS Trench lines <br />4 16 -Jun -23* 19 -Jun -23 <br />Full Closure -Phase 2 <br />4 16 -Jun -23 19 -Jun -23 <br />Install Cathodic <br />1 20 -Jun -23* 20 -Jun -23 <br />Repair Sewer Manholes SB -Phase 3 <br />5 20 -Jun -23* 26 -Jun -23 <br />SB Closure Phase 3 <br />10 20 -Jun -23 03-Jul-233'Closure <br />Install 18" Culvert <br />2 26 -Jun -23 27 -Jun -23 <br />TV Utilities <br />1 27 -Jun -23 27 -Jun -23 <br />Epoxy Coat SSMH's-SUB Mason Painting <br />1 28 -Jun -23 28 -Jun -23 <br />Overlay Airport SB Lanes <br />1 29 -Jun -23 29 -Jun -23 <br />Stripe Roadwav <br />2 30 -Jun -23 03 -Jul -23 <br />Remaining Level of Effort G= Current Bar Labels G= CODE= Subcontractor M RES—Paving M R Page 1 of 1 TASK filter: 5WLA_Resource Meeting. <br />Actual Level of Effort ® WBS SUMMARY G= CODE=Subcontractor M RES=Paving M R © Oracle Corporation <br />