My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1802001 thru PS-1802500_ - PS-1802332
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2018
>
PS-1802001 thru PS-1802500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1802001 thru PS-1802500_ - PS-1802332
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2023 2:02:09 PM
Creation date
9/19/2023 1:57:50 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1802332
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2018
Notes2
W/S of Airport Way S/O Weber Slough
Address
266 Val Dervin Pkwy. Stockton,CA 95206
Application
Teichert Construction-Ryan Alexander
Type
Trench, Southbound(Airport Way), Lanes Closure
Supplemental fields
Cross Ref
PWP790104
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for <br />ENCROACHMENT PERMIT <br />-2- <br />13. All pipe and pipeline related facilities including, but not limited to, valves, utility boxes and vaults, <br />and frames and covers shall be maintained by City of Stockton, including any facilities that are <br />abandoned in place. City of Stockton shall be responsible for any and all costs associated with <br />the removal, relocation and/or adjustment of these facilities as determined by the County at City <br />of Stockton's expense. (Streets and Highways Code Section 1463) <br />14. All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit. <br />15. Trenches/bell holes shall be maintained in a smooth and even condition to the satisfaction of the <br />County throughout the project limits at all times. <br />16. All trenches/bell holes shall be completely backfilled or shored and plated at the end of each <br />workday, and the roadway restored to two-way traffic. If plating is to be used, a trench shoring <br />and plating plan suitable for traffic loadings shall be prepared by a registered civil engineer and <br />submitted for prior approval by the County. <br />17. The contractor shall use San Joaquin County Improvement Standard R-29 when backfilling <br />trenches/bell holes within the County right-of-way. Where the existing road structural section is <br />below standard, a minimum section of 3 inches of asphalt concrete over 8 inches of aggregate <br />base shall be required. <br />18. Airport Way subject to pavement cuts shall receive a one -inch (1 ") asphalt overlay as per San <br />Joaquin County Department of Public Works Improvement Standards Section 2-5.0 Trench Cut <br />Policy. Shoulder areas shall be brought up to the finish grade as directed by the County. <br />19. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications and shall <br />not occur between November 1 and March 31, without prior authorization from the San Joaquin <br />County Department of Public Works Field Engineering Division, contact them at 209-953-7421. <br />20. No paving joints are allowed within paved shoulder; contractor shall pave all the way to outer <br />edge of paved shoulder. <br />21. Class II Aggregate Base shoulder backing is required from the edge of pavement, a minimum of <br />4 -inches thick by 4 -feet wide. <br />22. Contractor shall establish existing roadway and drainage grades within the construction area. <br />Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br />changes shall receive prior approval from County. <br />23. Above ground vaults, panels and/or other similar facilities will be allowed within the right-of-way if <br />located as far to the outside edge as possible. Utility vaults shall be located a minimum of 4'-0" <br />from edge of pavement. <br />24. County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project. All standard roadway striping and signage shall be clearly <br />visible, maintained and restored throughout the construction zone during and after the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.