My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1802001 thru PS-1802500_ - PS-1802332
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2018
>
PS-1802001 thru PS-1802500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2018_PS-1802001 thru PS-1802500_ - PS-1802332
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2023 2:02:09 PM
Creation date
9/19/2023 1:57:50 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1802332
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2018
Notes2
W/S of Airport Way S/O Weber Slough
Address
266 Val Dervin Pkwy. Stockton,CA 95206
Application
Teichert Construction-Ryan Alexander
Type
Trench, Southbound(Airport Way), Lanes Closure
Supplemental fields
Cross Ref
PWP790104
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stockton Office <br />265 Val Derwin Parkway <br />P.O. Box 1118 <br />Stockton, CA 95201-1118 <br />(209) 983-2300 11 FAX (209) 983-2375 <br />TEICHERT CONSTRUCTION <br />. - <br />Established 1887 <br />June 6, 2023 <br />San Joaquin County <br />Roadway Closure 6/14 - 6/30 <br />We are hereby notifying you for the upcoming road closures beginning Wednesday <br />June 14th, 2023. Teichert Construction is contracted to perform the remaining <br />roadway and infrastructure improvements on S Airport Way between French Camp <br />Slough and Stimson St/ Frontage Rd. This work will result in a NB road closure <br />beginning June 14th and remaining closed until Monday June 191h. A full road closure <br />of both the NB and SB lanes on S Airport Way will begin Friday June 1611, to Monday <br />June 191h. After the full road closure is complete, the SB lanes will be closed beginning <br />Monday June 19th for multiple weeks. Teichert Construction will be working on S <br />Airport Way beginning at 6:30 AM Wednesday (6/14) and open the road Friday <br />(6/30) at 5:00 PM. <br />Please feel free to call Ryan Alexander (209) 406-5020 for any questions on the <br />roadway closures. <br />Sincerely, <br />Ryan Alexander <br />Project Engineer <br />Teichert Construction <br />State of California Contractor's License No. 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.