My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2301501 thru PS-2302000_ - PS-2301633
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2023
>
PS-2301501 thru PS-2302000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2023_PS-2301501 thru PS-2302000_ - PS-2301633
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2023 8:12:13 AM
Creation date
9/20/2023 8:06:58 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-2301633
Category07
Encroachment(EP)/Driveway(DW) Permits
Year2
2023
Notes2
Oro Sidewalk Improvements
Address
1445 Van Ness Ave., Fresno,CA 93721
Application
AT&T-Fresno (Valley Permit Desk)
Type
Traffic Control Devices
Supplemental fields
Cross Ref
PWP241901
Type (2)
Encroachment Permit (EP)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONSTRUCTION NOTES <br />1O DIG 4'X4' PIT <br />& RAISE EXIST. MH #2553 TO THE PROPOSED SIDEWALK GRADE <br />2O DIG 3'X4' PIT <br />& RAISE EXIST. SAI TO THE PROPOSED SIDEWALK GRADE <br />NOTE: FOR TYPICAL TRENCH BACKFILL DETAILS SEE DWG #3 <br />NOTE: SEE GRADE ELEVATIONS ON DWG #4 (AS PER CITY <br />SIDEWALK IMPROVEMENTS) <br />+00q E MAIN ST _ <br />0 <br />N� <br />A LP <br />tP q O <br />O 0 N <br />-00 \ <br />N � \ <br />O <br />w <br />\ <br />1 \ <br />1111 S ORO AVE ROPO S\C' <br />2 G <br />X NEZ a <br />GP \ <br />F�NGE <br />pIL <br />1121 S ORO AVE <br />oRNE�N P� k o <br />EXCAVATION DATA <br />OWNER <br />ASPHALT <br />DIRT <br />CONCRETE <br />DIG PIT <br />COUNTY OF <br />SAN JOAQUIN <br />3'X4'= 12 SQ.FT. <br />DIG PIT <br />4'X4'= 16 SQ.FT. <br />Call USA @ 811 <br />48hrs prior to start of work <br />SAFETY NOTE <br />WORK AREA WILL INCLUDE LANE <br />CLOSURE ON ROAD WITH VERY HIGH <br />TRAFFIC VOLUME. PLEASE PROVIDE <br />COMPLETE WORK AREA PROTECTION. <br />M.O.P REQUIRED <br />CATEGORY - 3 <br />FOLLOW PROCEDURES AS DETAILED IN <br />NORTHERN SECTOR PLAN FOR PROTECTION <br />OF UNDERGROUND AND BURIED CABLE <br />M.O.P. DATED <br />GENERAL NOTES: <br />1. CONTRACTOR SHALL REQUEST LOCATION OF <br />UNDERGROUND FACILITIES BY USA <br />2. CONTRACTOR WILL COMPLY WITH ALL <br />SAN JOAQUIN COUNTY REGULATIONS FOR SPLICE <br />PIT & SURFACE COMPACTION <br />3. CONTRACTOR WILL RETURN WORK AREA BACK <br />TO ORIGINAL OR BETTER CONDITION PRIOR TO <br />START OF WORK <br />4. MAINTAIN 48" MINIMUM COVER <br />0' 1/2" 1" <br />0' 10' 20' <br />
The URL can be used to link to this page
Your browser does not support the video tag.