My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7106 - SP7110
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6718 - SP7507
>
SP7106 - SP7110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 11:14:54 AM
Creation date
9/22/2023 8:42:47 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Fernwood Road Resurfacing
Limits
Ashley Lane to North End
Year
2019
Project Engineer
Jonathan Curry
Roads Worked
Fernwood Rd.
Red Lines
Yes
Project #
221815
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7106 - SP7110
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />m <br />Iz <br />0 <br />N <br />4- <br />a� o <br />U) `i 0 26 <br />F E R N W 0 0 D <br />R&D 28 LF <br />Concrete <br />rn <br />Const <br />+ <br />Remove 0.40'± Existing Roadway & Place 0.40' HMA <br />Q w Sta 27+77 Fernwood Road <br />i- <br />cl� U = Sto 10+00 Roberta Place <br />J Q <br />M J <br />0 o- New EP Existing EP <br />ry <br />- \- New EP <br />Sta 27+76 (1' Rt) <br />Adjust Mon Frame & Cover <br />(� Const <br />Sass <br />o <br />q <br />u t�` <br />I <br />Corrections 1- <br />0 <br />ROAD <br />so <br />Existing EP <br />DATUM MONUMENT = Turning Point <br />} Sta 30+25 (18' Rt) <br />Elev 42.74 (Hub in set in ground) <br />Remove 0.40'± Existing Roadway & Place 0.40' HMA <br />R&D 21 LF <br />Concrete <br />New EP Existing EP 04 <br />F E R N W 0 0 D-- <br />33 -- -- - 34 <br />New EP - Existing EP <br />3 Sta 32+68: R&D existing pipe. Place 12" CSP. Salvage and <br />reinstall existing flap gate. Paid under 12" Corrugated Steel <br />Pipe (0.079" thick) item of work. <br />See Sheet 5, Cross Drain Detail. <br />COUNTY <br />OF <br />SAN JOAQUIN <br />NO <br />I <br />SCALE <br />DRAWN BY <br />DATE <br />PROJECT ENGINEER <br />DATE <br />CHECKED <br />Jonathan Curry <br />02/19 <br />� J <br />3/1-7//f <br />7�, <br />R&D 5 LF <br />Concrete <br />ROAD <br />3 <br />r- rn <br />36 <br />'3 <br />R&D 4 LF <br />Concrete <br />D Sto 34+71 to Sta 35+91 (Lt) <br />R&S Decorative Rocks within 3' of EP to Owner. Paid <br />under Clearing & Grubbing item of work. <br />3 Sta 36+16 to Sta 37+41 (Lt) <br />Place 2' Wide Loam in lieu of Shoulder Backing as needed. <br />FERNWOOD ROAD RESURFACING <br />(Ashley Lane to North End) <br />4-1 <br />0 <br />N <br />+ <br />r - <br />K) LC) <br />0 0 Q) <br />U) Q) <br />0 <br />�U) <br />J a) <br />a) <br />L U) <br />U <br />U <br />Sheet No. <br />4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.