Laserfiche WebLink
W <br />I <br />PCC Curb & Gutter <br />(Where exists) <br />Var <br />Const <br />Limits of Clearing and Grubbing <br />Limits of Polymer Asphaltic Emulsion (Seal Coat) and Screenings <br />Var <br />1'-2' Refer to Table on Sht No. 8 <br />Center Divide/Curb (Where exists) <br />i E <br />oMatch Chip Seal Chip Seal Match o o AC Dike or PCC <br />C: Existing i� Existing o Curb (Where exists) <br />v ® <br />Slope Slope <br />-- ------------------- -------------- <br />i —J \ <br />SHOULDER DETAIL <br />With Curb & Gutter <br />HES, &AWINGTYPICAI <br />1100 chw4ft <br />�r <br />Aift <br />. nfs VW* <br />GENERAL NOTES: W�ByIns <br />The $i'�W0w` <br />1. Chip seal must be placed in a single layer on existing or prepared asphalt concrete pavement <br />surface. No chip seal is allowed on Portland Cement Concrete surfaces including pavement, <br />railroad crossings, existing bridge decks, etc. <br />2. Screenings must have fine gradation of i" maximum. <br />3. Two weeks prior to the start of work, the Contractor must furnish to the Engineer a schedule <br />showing proposed street closures on each half—day basis. No work will commence until this <br />schedule is approved by the Engineer. <br />4. All intersection radii within project limits must be sealed to existing edge of pavement, face of <br />dike or lip of curb and gutter. <br />5. Before chip seal is to be applied to any area, protect all utility covers, including, but not limited <br />to: maintenance holes, water valves and survey monument frames and covers. Remove protective <br />covers after chip seal. Full compensation for said work must be considered as included in the <br />contract unit price for various items of work and no separate payment will be made therefor. <br />6. Surface preparation work must be as directed by the Engineer. Locations and dimensions of <br />Pavement Repair will be determined by the Engineer and must be placed 18 hours prior to <br />placing chip seal. <br />7. Remove and dispose of all existing Thermoplastic Traffic Stripes and Pavement Markings in all <br />project areas. The Contractor is responsible for verifying the quantities within the Project's limits <br />of work. See sheet 9 for locations and quantities. <br />8. Perform street sweeping throughout the duration of the chip seal operations of the project per <br />the specifications. Full compensation for these sweeping operations must be considered as <br />included in the contract unit price paid for various items of work and no separate payment will <br />be made therefor. <br />COUNTY OF SAN JOAQUIN I NO SCALE <br />DRAWN BY DATE I PROJECT ENGINEER DATES <br />Terrance Powers 02/2020 Z&t_ /�// <br />�z 9c <br />Existing Roadway <br />SHOULDER DETAIL <br />Without Curb & Gutter <br />9. Unless school is not in session or otherwise approved by the Engineer, preform chip seal <br />operation on weekends for streets within close proximity to schools. The Contractor must not <br />begin chip sealing a street after 1:00 PM without the approval from the Engineer. <br />10. Place Monument Frame and Cover at various locations, see Summary of Quantities for locations <br />and quantities. <br />11. Areas in County right—of—way used for staging and/or storage of materials will be approved by <br />the Engineer. The areas utilized for staging and/or storage must be restored to their original <br />condition. Any damages or unclean conditions to staging or storage areas must be repaired at <br />the Contractor's own expense. It will be the Contractor's responsibility to obtain permission from <br />the property owner to stage equipment or store materials on private property. You must must <br />provide a letter of release from the property owner of the areas utilized for staging and/or <br />storage of materials. <br />12. Traffic delays due to construction operations must not exceed 10 minutes, or J mile of vehicle <br />queue, whichever occurs first. <br />13. High Friction Surface Treatment (HEST) sections on Corral Hollow Road are not to be chip sealed <br />(See sheet 7 for locations). <br />14. The Contractor must perform final roadway sweeping operations on all chip sealed roads fifteen <br />(15) working days after application. All sweeping operations within or adjacent to a travel lane <br />require traffic control. <br />TYPICAL SECTION AND <br />GENERAL NOTES <br />CHECKED DATE <br />/4.etw, 70 Z/�o <br />CHIP SEAL 2019-2020 <br />arious Roads in Districts 1, 3, 4 and 5 <br />Sheet No. <br />2 of 11 <br />