Laserfiche WebLink
0 <br />M <br />-T, <br />F- <br />M <br />z <br />0 <br />GENERAL NOTES <br />1. The Contractor must obtain all permits required for the construction and completion of <br />the project, and must perform all work in accordance with the requirements and <br />conditions of all permits and approvals applicable to the project. <br />2. The Contractor must submit a temporary traffic control plan and sidewalk closure plan to <br />the Engineer for approval two weeks prior to construction. <br />3. Prior to commencing <br />any work, it will be <br />the Contractor's responsibility <br />to have each <br />utility company locate <br />in the field their main services lines and laterals. <br />The Contractor <br />must notify members <br />of the Underground <br />Service Alert (U.S.A) 48 hours <br />in advance of <br />performing excavation <br />work by calling the <br />toll free number (1-800-642-2444). <br />4. The Contractor must field verify all existing highway and utility facilities' locations and <br />depths. It will be the Contractor's sole responsibility to locate and protect all existing <br />highway and utility facilities, so that no damage results to them during the performance <br />of this contract. <br />5. Match new joint and score mark spacing to existing Crack Control Joints whenever <br />possible. <br />6. Existing highway and utility facilities must remain in place unless otherwise noted. <br />7. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in <br />place unless otherwise noted. <br />8. Existing drainage facilities must remain in place unless otherwise noted. The Contractor <br />must conduct earthwork operations so as not to modify or obstruct the existing drainage. <br />9. All Minor Concrete (Curb, Gutter & Sidewalk) work that is to be removed will be saw cut <br />or removed to the limits shown on the plans. The cost of saw cutting will be considered <br />as paid for under the various items of work involved. <br />10. All new Curb, Gutter and Sidewalk must conform to the existing flowline elevations with a <br />straight grade between conforms unless otherwise noted. <br />11. Install Expansion Joints at beginning and end of new Curb, Gutter and Sidewalk and <br />between new sidewalks and existing driveways. <br />12. Existing sprinkler systems, or portions thereof, will be maintained or protected during <br />construction operations. Any damage to the existing system must be repaired within 48 <br />hours at the Contractor's expense. Upon completion of the work, the Contractor must <br />restore the sprinkler system to its original condition. <br />13. The Contractor must perform all related work on streets where schools are situated, on <br />weekends or when school is not in session, unless allowed by written approval from the <br />Engineer. <br />14. Placement of temporary "No Parking" signs must be installed at a minimum of 24 hours <br />prior to work. Contractor is responsible for contacting adjacent property owner(s) to <br />arrange for access as necessary. <br />15. Adjustment of pull boxes to be paid under Minor Concrete Bid Item. <br />16. The exposure of of any Anchor bolts for Signal lights are to be repaired and paid for <br />under Minor Concrete Bid Item. <br />.44. <br />t . <br />RECORD DRAWInNG" <br />Corrooions BY <br />No Chanos By <br />.ny.hrson Using This Drawing Should Vwfty <br />Ifinformation By inspecting The Site Of Wt <br />COUNTY OF SAN JOAQUIN NO SCALE GENERAL NOTES AND SIDEWALK ACCESSIBILITY IMPROVEMENTS 2019-2020 <br />DIRECTIONAL GUIDE Various Locations in Eaglecrest Orchard, Linden, International Pkwy <br />DRAWN BY DATE PROJECT ENGINEER DATE CHECKED DATE <br />Sergio CastaAeda 02/99 -JV• - �� 3—!1- <br />15. <br />'1t. <br />Sheet No. <br />2 of 8 <br />