Laserfiche WebLink
Iz <br />0 <br />PLANING <br />ROADWAY <br />SURFACING <br />Location <br />Quantity (SQYD) <br />South of Jahant <br />Sta 10+45 <br />to <br />Road <br />Sta <br />11 +20 <br />165 <br />Sta 18+25 <br />to <br />Sta <br />19+00 <br />170 <br />North of Jahant <br />Sta 20+10 <br />to <br />Road <br />Sta <br />20+85 <br />160 <br />Collier Road <br />Sta 71 +35 <br />to <br />Sta <br />72+10 <br />170 <br />Total 665 <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />115 Locations <br />Total <br />EARTHWORK (MISCELLANEOUS AREAS) <br />Location Quantity (STA) <br />Sta 34+00 Lt to Sta 37+00 Lt 3 <br />Sta 34+00 Rt to Sta 37+00 Rt 3 <br />Total 6 <br />SHOULDER BACKING <br />Location Quantity (TON) <br />Mainline Total +a <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER <br />S. Davis 01/2020 , <br />DRIVEWAY (TYPE D) <br />Location Quantity (SQYD) <br />29 Locations Total <br />DRIVEWAY (TYPE E) <br />Location Quantity (SQYD) <br />16 Locations Total 460 <br />HOT MIC ASPHALT (TYPE A) <br />Location Quantity (TON) <br />Mainline ( 56 -79 "jo n5 -21;4 <br />Tapered Edge -4-� <br />Driveways (Type D & E) / q p al 47-6" <br />Pavement Repair /(a ) • 3 ► 1 <br />Total S <br />GEOSYNTHETIC PAVEMENT INTERLAYER <br />(PAVING FABRIC) <br />Location Quantity (SQYD) <br />Sta t+ to Sta MAa-`-- 1,720 <br />Sta 2 lv1'e to Sta 10,397 <br />1�10 + SS 5- -/1 -�- 3 S Total 12,117 <br />NO SCALE I SUMMARY OF QUANTITIES <br />DATE CHECKED DATE <br />o <br />TULLY ROAD RESURFACING <br />(1,180' South of Jahant Road to Collier Road) <br />Sheet No. <br />5 of 5 <br />