My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7207 - SP7209
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6718 - SP7507
>
SP7207 - SP7209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 11:20:26 AM
Creation date
9/25/2023 10:24:43 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Shippee Lane Resurfacing
Limits
North 99 Frontage Road (East) to Alhambra Avenue
Year
2020
Project Engineer
Kirsten Williamson
Roads Worked
Shippee Ln.
Red Lines
Yes
Project #
221921
Districts
District 4
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7207 - SP7209
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Co st <br />• Limits of Clearing and Grubbing and Mailbox Relocation. <br />EP I EP <br />1' --- --- 24'-26'-- 1 <br />FOG I FOG <br />Var -- - --- 23f' - Var <br />Fog Seal I Fog Seal <br />0.5 22' Geosynthetic Pavement Interlayer (Paving Fabric)- -0.5' <br />IPlane 0.25' Roadway Surfacing <br />i Place 0.25' HMA <br />Match Exist Slope Match Exist Slope <br />---- <br />IExist Roadway <br />AC Shoulder to <br />Remain in Place <br />TYPICAL SECTION <br />Sta 10+16 to Sta 40+52 (24') <br />Sta 40+52 to Sta 3- (26° <br />51-V 10 <br />Ro (.harp. <br />Apy person tjeft This 0mvd,jg <br />f.I! fn#<--rmaticn By inspecting The Stte Of Work <br />GENERAL NOTES: <br />1. Plane existing roadway surfacing 0.25' and place 0.25' HMA. HMA must be placed in two (2) layers of approximately equal thickness with Geosynthetic Pavement Interlayer (Paving <br />Fabric) placed on the planed surface. <br />2. Core data is unavailable; however, anticipate varying layers of base and roadway surfacing materials within the sectional planing depth of the existing roadway surface. <br />3. Placement of HMA Overlay must not begin until the HMA used in Pavement Repair has been in place for a minimum of 18 hours. <br />4. Placement of Asphaltic Emulsion (Fog Seal Coat) must not begin until the Mainline Paving has been in place for a minimum of 18 hours. <br />5. Existing highway and utility facilities must remain in place unless otherwise noted. <br />0 6. Existing trees, shrubs, fences, mailboxes and other frontage improvements must remain in place unless otherwise noted. <br />7. Existing drainage facilities must remain in place unless otherwise noted. <br />8. The Contractor will be responsible for adequately scheduling inspection and testing of all facilities constructed under this contract with a minimum 24 hour prior notice to the County. <br />All testing must conform to the Standard Specifications. All re—testing will be paid by the Contractor. <br />m <br />z <br />0 <br />COUNTY OF SAN JOA UIN NO SCALE GENERAL NOTES AND SHIPPEE LANE RESURFACING Sheet No. <br />Q TYPICAL SECTION (North 99 Frontage Road (East) to Alhambra Ave) 2 of 3 <br />DRAWN BY DATE IKI-sp" <br />PROJECT ENGINEER DATE �-f' <br />CHECKED DATE <br />A. rFeCzX 3/2020 �/' • ► ��1tlf,a t '� 7 /L+ " c^"'f 'r ( 7 l v <br />
The URL can be used to link to this page
Your browser does not support the video tag.