Project
Emerson Road and Eunice Avenue Resurfacing
Limits
1,330' west of North 99 frontage Road West to North 99 Frontage Road West; Calimyrna Road to Collier Road
Year
2020
Project Engineer
Ryan Yamada
Roads Worked
Emerson Rd., Eunice Ave.
Red Lines
Yes
Project #
221916
Districts
District 4
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7215 - SP7220
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES: <br />1. Prior to commencing any work, it will be the Contractor's responsibility to have <br />each utility company locate in the field their main service lines and laterals. The <br />Contractor must notify members of the Underground Service Alert (USA) 48 hours <br />in advance of performing excavation work by calling the toll free number <br />(1-800-642-2444) or 811. <br />2. Contractor must field verify all existing highway and utility facilities' locations and <br />depths. It will be the Contractor's sole responsibility to locate and protect all <br />existing highway and utility facilities, so that no damage occurs to them during the <br />performance of this contract. The Contractor must cooperate with other contractors <br />and utility companies installing new structures, utilities and services to the project. <br />Payment for this work will be considered to be included in the various items of <br />work. <br />3. The Contractor must obtain all permits and licenses required for the construction <br />and completion of the project, and must perform all work in accordance with the <br />requirements and conditions of all permits and approvals applicable to the project. <br />4. The Contractor must exercise due caution and carefully preserve survey bench <br />marks, control points, reference points and all survey stakes, and must bear all <br />expenses for replacement and/or errors caused by their unnecessary loss or <br />disturbance, <br />5. Existing trees, shrubs, fences, mailboxes and other frontage improvements must <br />remain in place unless otherwise noted. <br />6. Hand grinding of existing roadway surface will be required at locations where <br />existing utility valves, maintenance holes, gutter pan under roadway surface and <br />the lip of the gutter at drain inlet locations are within the construction work limits. <br />Payment for hand grinding roadway surface is considered as included in the <br />Planing Roadway Surfacing item of work. <br />7. Existing highway and utility facilities must remain in place unless otherwise noted. <br />8. Placement of HMA Overlay must not begin until the HMA used in Pavement Repair <br />and placement of corrugated steel pipes has been in place for a minimum of 18 <br />hours. <br />9. 0.17' HMA Overlay must be placed in one (1) layer with Geosynthetic Pavement <br />Interlayer (Paving Fabric) placed on the existing or prepared surface. <br />10. Placement of HMA Driveways must not begin until the HMA used for Mainline Paving <br />has been completed. <br />11. Existing drainage facilities must remain in place unless otherwise noted. The <br />Contractor must conduct earthwork operations so as not to modify or obstruct the <br />existing drainage. <br />COUNTY OF SAN JOAQUIN I NO SCALE I GENERAL NOTES <br />DRAWN BY I DATE I PROJECT ENGINEER <br />Nung No 1 01/20 <br />DATE CHECKED DATE <br />12. All Earthwork, except for final shoulder grading, must be completed prior to placing <br />the final layer of HMA Pavement. No Shoulder Backing material will be deposited or <br />drifted onto the final layer of HMA surfacing. Where the shoulder placement <br />exceeds 0.50' in thickness, the Shoulder Backing must be placed in two (2) or <br />more fully compacted layers. <br />13. Shoulder Backing material at all intersection radii must receive Penetration <br />Treatment at 0.25 gallon/square yard. Limits of the Penetration Treatment work <br />must be confined to intersection radii plus fifty feet (50') in each direction or to <br />the intersection conform. <br />14. The Contractor will be responsible for adequately scheduling inspection and testing <br />of all facilities constructed under this contract with a minimum 24 hour prior <br />notice to the County. All testing must conform to the Standard Specifications. All <br />re—testing will be paid by the Contractor. <br />r1i=UjhD DRAWING <br />Corrections By <br />Date. 7130100 <br />Any Peib,w.-issitu ims oidwaly bnould V <br />All information By inspecting The Sfte Of Work <br />EMERSON ROAD AND EUNICE AVENUE RESURFACING I Sheet No. <br />(1,330' west of North 99 Frontage Road West to North 99 Frontage Road West; Calimyma Road to Collier Road) 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.