Project
New Hope Road, Nowell Road and Thornton Road Resurfacing
Limits
New Hope Road: Thornton Road to Nowell Road; Nowell Road: South End to New Hope Road; Thornton Road: 100' North of Walnut Grove Road to New Hope Road
Year
2020
Project Engineer
Ger Lee
Roads Worked
New Hope Rd., Nowell Rd., Thornton Rd.
Red Lines
Yes
Project #
221928
Districts
District 4
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7294 - SP7302
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
m <br />im <br />GENERAL <br />NOTES <br />1. <br />0.25' HMA Overlay must be placed in two (2) layers of approximately <br />9. <br />The Contractor will be responsible for adequately scheduling inspection <br />equal thickness with Geosynthetic Pavement Interlayer (Paving Fabric) <br />and testing of all facilities constructed under this contract with a <br />placed on the existing or prepared surface. <br />minimum 24—hour notice to the County. All testing must conform to the <br />2. <br />Placement of HMA Overlay must not begin until the HMA used in <br />Standard Specifications. All re—testing will be paid by the Contractor. <br />Pavement Repair has been in place for a minimum of 18 hours. <br />10. <br />The Contractor must obtain all permits and licenses required for the <br />3. <br />Placement of HMA Driveways must not begin until the HMA used for <br />construction and completion of the project, and must perform all work in <br />Mainline Paving has been completed. <br />accordance with the requirements and conditions of all permits and <br />4. <br />Existing highway and utility facilities must remain in place unless otherwise <br />approvals applicable to the project. <br />noted. <br />11. <br />Hand grinding of AC pavement will be required at locations where existing <br />5. <br />Existing trees, shrubs, fences, mailboxes and other frontage improvements <br />highway and utility facilities are within the Planing Roadway Surfacing <br />must remain in place unless otherwise noted. <br />limits. Payment for hand grinding must be considered as included in the <br />6. <br />Existing drainage facilities must remain in place unless otherwise noted. <br />contract unit price paid for Planing Roadway Surfacing. <br />The Contractor must conduct earthwork operations so as not to modify <br />12. <br />The Contractor must exercise due caution and carefully preserve survey <br />or obstruct the existing drainage. <br />bench marks, control points, reference points and all survey stakes, and <br />7. <br />All Earthwork, except for final shoulder grading, must be completed prior <br />must bear all expenses for replacement and/or errors caused by their <br />to placing the final layer of HMA Pavement. No Shoulder Backing material <br />unnecessary loss or disturbance. <br />will be deposited or drifted onto the final layer of HMA surfacing. Where <br />13. <br />Pavement core data is unavailable; however, anticipate varying layers of <br />the shoulder placement exceeds 0.50' in thickness, the Shoulder Backing <br />base and roadway surfacing materials within the sectional planing depth <br />must be placed in two (2) or more fully compacted layers. <br />of the existing roadway. <br />8. <br />Shoulder Backing material at all intersection radii must receive <br />14. <br />The Contractor must enter into an Agreement with the Union Pacific <br />Penetration Treatment at 0.25 gallon/square yard. Limits of the <br />Railroad for any work within the Railroad's right—of—way. See SECTION <br />Penetration Treatment work must be confined to intersection radii plus <br />5-1.20C Railroad Relations of the Specifications for further details. <br />fifty feet (50') in each direction or to the intersection conform. <br />Correctic:ns By <br />No Change;- Efy S v�_l <br />kqy IOfum U s'% T'tis Drat-Ang Snouic v9rity <br />,Aar feat}c"VlOn t3y anspMcttrV The Sits Qf WjW <br />z <br />0 <br />COUNTY OF SAN JOAQUIN NO SCALE GENERAL NOTES <br />DRAWN BY I DATE I PROJECT ENGINEER <br />Terrance Powers 106/2020 <br />DATE CHECKED DATE <br />4/� go (;f� /I S/ZG <br />4EW HOPE ROAD, NOWELL ROAD AND THORNTON ROAD RESURFitiCINGI Sheet No. <br />(New Hope Road: Thornton Road to Nowell Road; Nowell Road: South End to New Hope Road; 2 of 9 <br />Thornton Road: 100' North of Walnut Grove Road to New Hope Road) <br />
The URL can be used to link to this page
Your browser does not support the video tag.