Laserfiche WebLink
0 <br />m <br />m <br />m <br />z <br />0 <br />SHOULDER BACKING <br />Location Quantity (TON) <br />Lillian Avenue <br />Mainline Total 32 <br />PENETRATION TREATMENT <br />Location Quantity (SQYD) <br />Lillian Avenue <br />4 Locations (Intersection Radii) <br />Total 186 <br />DRIVEWAY (TYPE D) <br />Location Quantity (SQYD) <br />Lillian Avenue <br />5 Locations 18 <br />Stokes Avenue <br />4 Locations 31 <br />49 <br />Corrections By_ <br />No Crbahnw, Sy <br />Dake <br />Any Person Using This Draw nr,g Shou Ver <br />AN Information By Inspecting The Sita Of Vftrk <br />DRIVEWAY (TYPE ES) <br />Location Quantity (SQYD) <br />Lillian Avenue <br />34 Locations Total 76 <br />COUNTY OF SAN JOAQUIN <br />DRAWN BY DATE PROJECT ENGINEER <br />Shawn Davis 01/2021 <br />HOT MIX ASPHALT (TYPE A) <br />Location <br />Location Quantity <br />(TON) <br />Lillian Avenue <br />Sta 10+14 to Sta 26+50 <br />Stokes Avenue <br />Sta 10+63 to Sta 23+76 <br />Driveways (Type D) <br />Driveways Mpe ES) <br />Pavement Repair <br />Total <br />695 <br />855 <br />8 <br />13 <br />17 <br />1,588 <br />1 <br />Sta 14+89 (5' <br />GEOSYNTHETIC PAVEMENT INTERLAYER <br />(PAVING FABRIC) <br />Location Quantity <br />(SQYD) <br />Lillian Avenue <br />Sta 10+14 to Sta 26+50 <br />Stokes Avenue <br />Sta 10+63 to Sta 23+76 <br />Total <br />3,984 <br />4,978 <br />8,962 <br />Sta 18+04 (4' <br />Rt) <br />COLD PLANE PAVEMENT <br />Sta 21+95 (5' <br />Location Quantity <br />(SQYD) <br />Lillian Avenue <br />Sta 10+14 to Sta 26+50 <br />Stokes Avenue <br />Sta 10+63 to Sta 23+76 <br />Total <br />4,169 <br />5,127 <br />9,296 <br />PAVEMENT REPAIR <br />(5' <br />Location Quantity <br />(SQYD) <br />Various Locations Total <br />100 <br />NO SCALE I SUMMARY OF QUANTITIES <br />DATE CHECKED DATE <br />- <br />ADJUST FRAME AND COVER <br />(STORM DRAIN MAINTENANCE HOLE) <br />Location <br />Quantity (EA) <br />Stokes Avenue <br />Sta 11+50 (4' <br />Rt) <br />1 <br />Sta 14+89 (5' <br />Rt) <br />1 <br />Sta 17+27 (4' <br />Rt) <br />1 <br />Sta 18+04 (4' <br />Rt) <br />1 <br />Sta 21+95 (5' <br />Rt) <br />1 <br />Rt) <br />1 <br />Total 5 <br />ADJUST FRAME AND COVER <br />(SANITARY SEWER MAINTENANCE HOLE) <br />Location <br />Quantity (EA) <br />Lillian Avenue <br />Sta 10+25 <br />(4' <br />Rt) <br />1 <br />Sta 12+80 <br />(4' <br />Rt) <br />1 <br />Sta 14+97 <br />(4' <br />Rt) <br />1 <br />Sta 16+74 <br />(4' <br />Rt) <br />1 <br />Sta 20+58 <br />(5' <br />Rt) <br />1 <br />Sta 23+90 <br />(5' <br />Rt) <br />1 <br />Stokes Avenue <br />Sta 14+66 <br />(10' <br />Rt) <br />1 <br />Sta 18+61 <br />(10' <br />Rt) <br />1 <br />Total 8 <br />ADJUST FRAME AND COVER <br />(SANITARY SEWER LAMPHOLE) <br />Location Quantity (EA) <br />Stokes Avenue <br />Sta 20+28 (10' Rt) 1 <br />Total 1 <br />LILLIAN AVENUE AND STOKES AVENUE RESURFACING I Sheet No. <br />(Miner Avenue to State Route 26; State Route 26 to North End) L 6 of 6 <br />