My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP7435 - SP7449
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP6718 - SP7507
>
SP7435 - SP7449
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 11:35:10 AM
Creation date
9/25/2023 4:22:14 PM
Metadata
Fields
Template:
Small Plans - SP
Project
West Lane Resurfacing
Limits
East Side Only (Eight Mile Road to Armstrong Road) West Side Only (Eight Mile Road to Armstrong Road)
Year
2021
Project Engineer
Hadi Tabatabaee
Roads Worked
West Ln.
Red Lines
Yes
Project #
221720,221723
Federal #
STPL-5929(297),STPL-5929(298)
Districts
District 4
Supplemental fields
Classification
Record Drawings
Cross Ref
SP7435 - SP7449
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PORTABLE CHANGEABLE MESSAGE SIGN <br />Location Quantity (EA) <br />West Lane Total 3 <br />REMOVE CONCRETE <br />Location <br />Location <br />Quantity (TON) <br />Mainline <br />Quantity (LF) <br />Sta <br />74+23 <br />to <br />Sta <br />84+94 <br />1,076 <br />Sta <br />140+ 15 <br />to <br />Sta <br />148+17 <br />807 <br />Sta <br />149+45 <br />to <br />Sta <br />157+29 <br />789 <br />Sta <br />191 +17 <br />to <br />Sta <br />199+25 <br />818 <br />Total 3,490 <br />SHOULDER BACKING <br />Location Quantity (TON) <br />Mainline Total 281 <br />PENETRATION TREATMENT <br />Location Quantity (SQYD) <br />1 Location (Eight Mile Road) Total 61 <br />HOT MIX ASPHALT (TYPE A) <br />Location <br />Location <br />Quantity (TON) <br />Mainline <br />(SQYD) <br />8,575 <br />HMA Dike <br />(Type A) <br />17 <br />HMA Dike <br />(Type C) <br />7 <br />HMA (Misc <br />Area) <br />346 <br />Total 8,945 <br />COUNTY OF SAN JOAOUIN <br />�DDRAWN BY <br />GEOSYNTHETIC PAVEMENT INTERLAYER <br />(PAVING FABRIC) <br />Location <br />ASPHALT <br />AREAS) <br />Quantity <br />(SQYD) <br />Sta 74+08 <br />to Sta <br />84+54 <br />4,726 <br />Sta 84+73 <br />to Sta <br />114+60 <br />1 1 ,217 <br />Sta 114+87 <br />to Sta <br />164+36 <br />20,455 <br />Sta 164+91 <br />to Sta <br />199+95 <br />13,640 <br />166+82 <br />to <br />Total <br />50,038 <br />PLACE HOT MIX ASPHALT DIKE <br />(TYPE A) <br />Location <br />PLACE HOT MIX <br />(MISCELLANEOUS <br />ASPHALT <br />AREAS) <br />Location <br />Quantity (LF) <br />Sta <br />148+50 <br />to <br />Sta <br />148+89 <br />(Lt) <br />39 <br />Sta <br />149+67 <br />to <br />Sto <br />149+91 <br />(Lt) <br />24 <br />Sto <br />166+82 <br />to <br />Sta <br />172+50 <br />(Lt) <br />571 <br />Sta <br />198+89 <br />to <br />Sta <br />199+02 <br />(Lt) <br />13 <br />Total 647 <br />PLACE HOT MIX ASPHALT DIKE <br />(TYPE C) <br />Location Quantity (LF) <br />Sta 157+33 to Sta 166+82 (Lt) Total 949 <br />NO SCALE I SUMMARY OF QUANTITIES <br />DATE PROJECT ENGINEER DATE <br />CH•ECCKED/ DATE <br />COLD PLANE PAVEMENT <br />Location <br />PLACE HOT MIX <br />(MISCELLANEOUS <br />ASPHALT <br />AREAS) <br />Location <br />Quantity <br />(SQYD) <br />Sta <br />74+23 to Sta 84+94 <br />84+54 <br />1,564 <br />Sta <br />140+15 to Sta 148+17 <br />to <br />1,024 <br />Sta <br />149+45 to Sta 157+29 <br />Sta <br />984 <br />Sta <br />191 +17 to Sta 199+25 <br />164+36 <br />1,038 <br />Sta <br />164+91 <br />Tota 1 <br />4,610 <br />NO SCALE I SUMMARY OF QUANTITIES <br />DATE PROJECT ENGINEER DATE <br />CH•ECCKED/ DATE <br />COLD PLANE PAVEMENT <br />Location <br />MINOR CONCRETE <br />(CURB) <br />Quantity (SQYD) <br />Sta <br />74+08 <br />to <br />Sta <br />84+54 <br />4,851 <br />Sta <br />84+73 <br />to <br />Sta <br />114+60 <br />11,552 <br />Sta <br />114+87 <br />to <br />Sta <br />164+36 <br />21,009 <br />Sta <br />164+91 <br />to <br />Sta <br />199+95 <br />14,035 <br />Total 51,447 <br />PAVEMENT REPAIR <br />Location Quantity (SQYD) <br />West Lane Total 100 <br />NOTE: Minor Concrete (Curb) <br />quantities are greater than the <br />stationing sum due to the <br />additional quantities needed at the <br />end of curb radii. Q?pVESS/p� <br />SOPy�N1 <br />No. 83958 <br />CIV 0- ��\P <br />IN <br />Awni Taha <br />RCE 83958 <br />WEST LANE RESURFACINGI Sheet No. <br />West Side Only (Eight Mile Road to Armstrong Road) 14 of 15 <br />MINOR CONCRETE <br />(CURB) <br />Location <br />Quantity <br />(LF) <br />Sta <br />74+23 <br />to <br />Sta <br />84+94 <br />1,076 <br />Sta <br />140+15 <br />to <br />Sta <br />148+17 <br />807 <br />Sta <br />149+45 <br />to <br />Sta <br />157+29 <br />789 <br />Sta <br />191 +17 <br />to <br />Sta <br />199+25 <br />818 <br />Total <br />3,490 <br />NOTE: Minor Concrete (Curb) <br />quantities are greater than the <br />stationing sum due to the <br />additional quantities needed at the <br />end of curb radii. Q?pVESS/p� <br />SOPy�N1 <br />No. 83958 <br />CIV 0- ��\P <br />IN <br />Awni Taha <br />RCE 83958 <br />WEST LANE RESURFACINGI Sheet No. <br />West Side Only (Eight Mile Road to Armstrong Road) 14 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.